How Many Cell Towers Are in the US? 2026 Counts by State

Get a sourced national tower count and PorchRocket's analysis of the FCC antenna structure registry. Compare every state, download the data and distinguish a registered structure from a cellular service site.

The short answer

The United States had 158,500 purpose-built cellular towers at year-end 2025, according to the Wireless Infrastructure Association's report published in 2026. Separately, PorchRocket's analysis of the November 1, 2026 FCC Antenna Structure Registration file counts 141,080 current, constructed registrations across the 50 states and DC. ASR includes multiple communications uses and omits unregistered sites. Asset Search investigates towers and rooftop sites in a buyer's territory.

Find towers and rooftop sites

What matters most

  • PorchRocket counts 141,080 current, constructed FCC antenna structure registrations in the 50 states and DC in the November 2026 analysis.
  • Texas leads with 14,618 constructed registrations, followed by California with 6,872 and Florida with 6,657.
  • The national density is 39.92 constructed registrations per 1,000 land square miles, using Census 2026 land area.
  • ASR contains 65,815 constructed registrations below 200 feet, so a height cutoff alone cannot reproduce the registry.
  • Asset Search returns reviewed tower and rooftop candidates with dated evidence, parcel information and the next field check for unresolved sites.

The United States had 158,500 purpose-built cellular towers at year-end 2025, according to the Wireless Infrastructure Association’s March 2026 statistics. The FCC registry covers a different population of antenna structures, including supports used for communications services beyond cellular, while installations outside its registration criteria can be absent from the file. The totals are not interchangeable.

Updated November 2026. PorchRocket downloaded the current FCC registration file and calculated state counts, structure types, height bands and density against Census land area. The tables cover the 50 states and District of Columbia, with constructed structures separated from granted registrations and historical records. Asset Search by PorchRocket uses that public starting point alongside dated imagery and property records to investigate the towers and rooftop sites a service team needs to reach in the contiguous United States.

Key statistics

PorchRocket’s analysis of the November 2026 FCC ASR extract counts 141,080 current, constructed registrations across the 50 states and DC, with definitions and source dates attached to every comparison.

The FCC figures below come from our calculations on the full ASR registration download, released November 1, 2026; density figures also use Census 2026 land area.

  • The Wireless Infrastructure Association reports 158,500 purpose-built cellular towers operating in the United States at year-end 2025 in its March 2026 publication.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract finds 197,961 distinct registration records in the full extract, including territories and other location codes.
  • Across the 50 states and DC, PorchRocket’s analysis of the November 2026 FCC ASR extract counts 196,666 registration records across all statuses.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract identifies 141,080 current, constructed registrations across the 50 states and DC.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract separates 18,247 current, granted registrations from the constructed inventory across the 50 states and DC.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract finds 15,805 canceled registration records across the 50 states and DC.
  • Dismantled records total 12,650 across the 50 states and DC in PorchRocket’s analysis of the November 2026 FCC ASR extract.
  • Terminated records total 8,879 across the 50 states and DC in PorchRocket’s analysis of the November 2026 FCC ASR extract.
  • Texas has 14,618 current, constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract, the largest state count.
  • California has 6,872 current, constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract.
  • Florida has 6,657 current, constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract.
  • Ohio has 6,164 current, constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract.
  • Georgia has 5,732 current, constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract counts 40,043 current, constructed registrations in Texas, California, Florida, Ohio and Georgia, or 28.38% of the total across the 50 states and DC.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract counts 50,784 constructed registrations filed under the general TOWER type across the 50 states and DC.
  • Lattice towers coded LTOWER account for 29,691 constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract across the 50 states and DC.
  • Monopoles coded MTOWER account for 19,113 constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract across the 50 states and DC.
  • Guyed towers coded GTOWER account for 17,919 constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract across the 50 states and DC.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract groups 2,569 constructed registrations under six building-related structure codes across the 50 states and DC.
  • The filed structure type is blank on 3,526 constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract across the 50 states and DC.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract finds 65,815 constructed registrations below 60.96 meters, equivalent to 200 feet, across the 50 states and DC.
  • Below-200-foot structures represent 46.65% of constructed registrations in PorchRocket’s analysis of the November 2026 FCC ASR extract across the 50 states and DC.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract finds 833 constructed registrations at least 300 meters above ground across the 50 states and DC.
  • PorchRocket’s analysis of the November 2026 FCC ASR extract finds a median positive overall height of 65.2 meters among current, constructed registrations across the 50 states and DC.
  • PorchRocket’s analysis of November 2026 FCC ASR records and Census 2026 land area calculates 39.92 constructed registrations per 1,000 land square miles across the 50 states and DC.
  • Rhode Island has 224.39 constructed registrations per 1,000 land square miles, the highest state density in PorchRocket’s analysis of November 2026 FCC ASR records and Census 2026 land area.
  • Texas has 55.95 constructed registrations per 1,000 land square miles in PorchRocket’s analysis of November 2026 FCC ASR records and Census 2026 land area.
  • The maximum constructed registration height is 627.8 meters near Galesburg, North Dakota, in PorchRocket’s analysis of the November 2026 FCC ASR extract across the 50 states and DC.

How many cell towers are in the US in 2026?

Use 158,500 for purpose-built cellular towers at year-end 2025, the observation date of the industry count published in 2026.

Use 141,080 current, constructed FCC registrations when quoting PorchRocket’s November 2026 ASR analysis for the 50 states and DC. Keep the label. A registration total includes structures serving purposes beyond cellular service, while installations that do not require registration can sit outside the file entirely.

The industry report also distinguishes other infrastructure units:

Published infrastructure category Year-end 2025 count Counting unit
Purpose-built cellular towers 158,500 Towers
Macrocell sites 254,850 Sites
Outdoor small cells 198,100 Sites
Indoor small cell nodes 830,350 Nodes

Source for every row: Wireless Infrastructure Association, published March 18, 2026. These categories are not a single tower total.

For a tower maintenance contractor, start with the physical support and the service footprint. A roofer needs the building. A manufacturer estimating equipment demand needs a count at the equipment level, with the product family separated from the structure carrying it. Choose the unit before counting.

I would write the unit into the spreadsheet column name before calculating market size. “Constructed ASR registrations” can be audited. A column labeled “Towers” leaves the analyst guessing whether a water tank carrying antennas belongs in the total or should be counted with another support category. Our asset search glossary helps teams agree on those terms.

Why the FCC antenna structure registry gives a different count

ASR tracks registered antenna structures under aviation-related rules, so its records cover a different population from a cellular tower or cell-site inventory.

The FCC’s explanation of registration scope describes structures generally exceeding 200 feet and certain structures near airports. The FCC code definitions also distinguish constructed, granted and retired statuses. Neither a registration number nor a communications-shaped structure identifies a cellular customer by itself.

Filter the status first. Canceled registrations remain in the downloaded database, and adding those records to standing structures inflates the inventory before anyone draws a service territory.

Registration category Records in the 50 states and DC Treatment in this analysis
Current constructed, no dismantlement date 141,080 Main inventory denominator
Current granted, no dismantlement date 18,247 Reported separately
Canceled status 15,805 Excluded from constructed count
Dismantled status 12,650 Excluded from constructed count
Terminated status 8,879 Excluded from constructed count
Constructed or granted status failing the additional filters 5 Excluded from both current subsets
All records 196,666 Includes every status and archive flag

Source for every row: PorchRocket’s analysis of FCC ASR registration records, November 2026. The five excluded edge cases comprise three constructed-status records and two granted-status records.

A granted registration has not met our constructed-status test. Put it in the verification queue. Someone could have erected the structure without updating the record, so the site needs a current observation before a dispatcher can treat it as standing inventory.

ASR also records the support, rather than each potential tenant’s purchasing relationship. Co-location complicates the buying roles. Several buyer records can relate to the same structure, so give the physical site an identifier that survives each new contact added to the sales file.

Number of cell towers by state

Texas leads the constructed ASR subset with 14,618 registrations; California follows at 6,872, and Florida has 6,657 in the November 2026 analysis.

The table answers a narrower, reproducible version of the state-count question: registered antenna structures, including communications uses beyond cellular. “Constructed” requires current archive status and a blank dismantlement date. “Granted” uses the same additional filters. “All records” retains historical registrations.

State Constructed Granted All records Per 1,000 land sq. mi. Tallest AGL (m)
Alabama 4,554 721 6,223 89.91 609.6
Alaska 1,480 236 1,989 2.59 246.4
Arizona 1,793 292 2,838 15.78 413.0
Arkansas 3,076 332 3,946 59.16 600.4
California 6,872 1,195 11,868 44.09 624.5
Colorado 1,614 304 2,353 15.57 608.1
Connecticut 484 59 674 99.95 408.1
Delaware 234 33 335 120.09 305.4
District of Columbia 29 19 83 474.42 214.8
Florida 6,657 1,334 10,213 124.06 579.4
Georgia 5,732 795 7,813 99.31 609.6
Hawaii 294 88 533 45.78 152.4
Idaho 930 142 1,370 11.25 207.8
Illinois 5,168 450 7,107 93.09 527.3
Indiana 3,790 477 5,048 105.79 345.0
Iowa 3,268 251 4,138 58.51 609.6
Kansas 2,859 320 3,692 34.97 442.9
Kentucky 2,896 281 3,690 73.34 530.0
Louisiana 3,711 439 5,041 85.86 604.7
Maine 784 101 1,019 25.42 508.0
Maryland 1,312 162 1,914 135.10 390.1
Massachusetts 967 134 1,510 123.96 411.5
Michigan 4,541 525 6,231 80.21 403.2
Minnesota 2,997 360 4,002 37.64 459.9
Mississippi 3,787 477 4,899 80.70 609.0
Missouri 4,533 538 6,031 65.94 609.6
Montana 1,057 112 1,460 7.26 244.7
Nebraska 2,073 208 2,689 26.99 565.4
Nevada 927 203 1,600 8.44 450.5
New Hampshire 431 65 609 48.13 202.1
New Jersey 1,124 166 1,849 152.82 304.8
New Mexico 1,180 177 1,736 9.73 560.0
New York 2,739 379 3,763 58.12 546.2
North Carolina 4,523 482 6,110 93.02 609.6
North Dakota 1,210 148 1,609 17.54 627.8
Ohio 6,164 601 8,217 150.86 438.0
Oklahoma 4,333 435 5,655 63.17 609.5
Oregon 1,436 203 2,080 14.96 330.7
Pennsylvania 4,035 438 5,762 90.18 389.0
Rhode Island 232 12 326 224.39 305.1
South Carolina 3,410 342 4,397 113.42 609.6
South Dakota 949 153 1,289 12.52 609.2
Tennessee 3,747 399 4,897 90.89 534.0
Texas 14,618 2,225 20,709 55.95 612.0
Utah 866 122 1,308 10.48 201.2
Vermont 154 35 225 16.71 137.0
Virginia 2,954 315 4,233 74.82 383.7
Washington 2,531 339 3,662 38.09 286.5
West Virginia 1,499 137 1,967 62.35 472.8
Wisconsin 3,946 417 5,115 72.85 608.9
Wyoming 580 69 839 5.97 351.4

Sources for every row: PorchRocket’s calculations from the November 2026 FCC registration extract and Census 2026 state land area. Tallest AGL means maximum filed overall height above ground among current, constructed registrations in that state. It does not mean tallest cellular-only tower.

Use the table to decide where to investigate, then redraw the analysis around the territory your crews can serve. Statewide is too broad for dispatch. The service manager still needs to know how many qualifying stops fit between the shop and the farthest gate, after excluding sites outside the crew’s specialty or buying relationships.

For equipment makers comparing infrastructure markets, keep the denominators separate in solar and storage counts by state and data center power statistics. A generating site, an antenna structure and a building are different units. Our broader commercial building statistics supply the building denominator when the campaign targets properties rather than freestanding communications structures.

How many cell towers are in Texas?

Texas contains 14,618 current, constructed ASR registrations in PorchRocket’s November 2026 analysis, compared with 20,709 records across all statuses.

Texas accounts for 10.36% of the national constructed subset. Keep its 2,225 current, granted registrations separate. Dividing the 14,618 constructed registrations by Census land area, then multiplying by 1,000, yields 55.95 registrations per 1,000 land square miles and allows a density comparison with smaller states.

For outreach, I would divide Texas into operating areas around the crew base. Match the service scope to the support type and access requirements before assigning each area. Keep a compound outside the travel boundary out of the prospect list even when its support type fits.

Keep a rooftop campaign separate from a tower-climbing campaign. A building owner responsible for roof access may be a different buyer from the party approving work on antenna equipment. The parcel record helps start that investigation; the service authorization settles it.

The tallest constructed Texas registration in this file is 612.0 meters above ground near Hitchcock, ASR 1254220. That is a filed maximum. Use the height distribution when comparing the broader inventory.

For a local inventory, preserve the registration number as the link back to the FCC record. Put your own property identifier beside it so the same compound does not become several cold calls when records are joined. Our cell tower location workflow covers that move from public records to an investigated service territory.

Registered antenna structures by type

The general TOWER code covers 50,784 constructed registrations, while lattice towers account for 29,691 and monopoles account for 19,113 in the national subset.

Filed type describes the support. Keep the raw code. A readable label helps the service manager sort the file, but neither field establishes the radio service or who controls the next work order.

Filed type Meaning Constructed registrations Share
TOWER Tower, subtype unspecified 50,784 36.00%
LTOWER Lattice tower 29,691 21.05%
MTOWER Monopole 19,113 13.55%
GTOWER Guyed tower 17,919 12.70%
POLE Pole 9,735 6.90%
MAST Mast 2,318 1.64%
TANK Tank 658 0.47%
UPOLE Utility pole or tower 588 0.42%
B, BANT, BMAST, BPIPE, BPOLE, BTWR Building-related codes 2,569 1.82%
(blank) No filed type 3,526 2.50%
Other codes Arrays and other filed types 4,179 2.96%

Counts and shares: PorchRocket’s November 2026 FCC ASR calculations. Labels are informed by Volusia County’s public structure-type dictionary. Building-related codes are grouped explicitly; other filed types include array codes. Shares use all 141,080 constructed registrations and are rounded independently.

The general TOWER code does not identify a narrower structural subtype. Leave that row intact. Redistributing it among monopoles or lattice towers would require evidence beyond the filed type, and the resulting shares would no longer reproduce from the raw code. Blank types need another source too.

For a tower service department, type is a sorting field before review. The work specification comes from the site. A roof service department can start with the 2,569 building-related registrations, then investigate antenna access and the property relationship at each qualifying address.

Tank supports deserve their own treatment. A water tower location inventory can connect antenna observations to the water asset and property record, while retaining a separate question about who controls telecom access. That avoids calling the water-system operator with a proposal for equipment it does not own.

Tower height bands in the FCC database

PorchRocket finds 65,815 constructed registrations below 60.96 meters, or 200 feet, representing 46.65% of the national constructed subset.

That result is a reason to read the registration criteria carefully. Airport-related registration can apply below the familiar height threshold. The FCC also permits voluntary registration, so a shorter registered structure need not have qualified through an airport-related rule. The filed height alone does not explain why the owner registered it.

Overall AGL band Constructed registrations Share of constructed total
Under 30 meters 17,704 12.55%
30 to under 60.96 meters 48,111 34.10%
60.96 to under 150 meters 70,706 50.12%
150 to under 300 meters 3,726 2.64%
300 meters or taller 833 0.59%
Missing or nonpositive AGL 0 0.00%

Source for every row: PorchRocket’s November 2026 FCC ASR height calculations, using overall AGL rather than supporting-structure height or elevation above sea level. The median positive AGL is 65.2 meters. All records in the final constructed subset have positive overall AGL values.

Classify the unrounded value. These bands include their lower boundary, so a record at exactly 150 meters belongs in the 150 to under 300 meter band, and a record at 60.96 meters sits outside the below-200-foot group. Round only the displayed figure.

For project planning, retain the original meter value. Get the site drawing too. The overall registered height is a starting reference, while the antenna position or work elevation needed to plan the crew’s access may be a different measurement.

Tallest registered towers by state

North Dakota has the highest filed overall AGL in the constructed subset: 627.8 meters for ASR 1038731 near Galesburg.

The table lists the highest constructed registration in each of the ten states with the largest maximum filed heights. The larger state table gives the maximum for every state and DC, and the CSV includes each selected registration number in its method field.

State Filed city ASR number Filed type Maximum AGL (m)
North Dakota Galesburg 1038731 TOWER 627.8
California Walnut Grove 1011404 GTOWER 624.5
Texas Hitchcock 1254220 GTOWER 612.0
Alabama Windham Springs 1033524 TOWER 609.6
Georgia Metcalf 1019981 TOWER 609.6
Iowa Alleman 1016799 TOWER 609.6
Missouri Syracuse 1040329 GTOWER 609.6
North Carolina Dallas 1005062 TOWER 609.6
South Carolina Floyd Dale 1024373 TOWER 609.6
Oklahoma Alfalfa 1239224 GTOWER 609.5

Source for every row: PorchRocket’s November 2026 FCC ASR maximum-height calculations. When a state has a tie, the displayed example uses the lowest registration number. The city is the filed location text, not a boundary assignment.

The ranking uses recorded heights. A writer quoting the national maximum should retain “registered antenna structure” in the sentence, since this file includes supports used for communications services beyond cellular.

A measure above sea level includes the site’s ground elevation, which means a shorter support on high ground can appear higher than a taller support whose base is nearer sea level. Use overall AGL.

I would retain the ASR identifier in an engineering research note. Town names can be ambiguous. The registration number lets a reviewer inspect the same record after a change in ownership or a modification filing, even when several installations share the filed city name.

How many towers per square mile?

The national constructed ASR density is 0.0399 registrations per land square mile, equivalent to 39.92 per 1,000 land square miles.

The arithmetic is 141,080 divided by 3,533,659.763 land square miles, then multiplied by 1,000 for the table’s display. The denominator comes from the Census 2026 Gazetteer. The Census record layout defines ALAND_SQMI as land area in square miles, separately from water area.

Rhode Island leads the states at 224.39 constructed registrations per 1,000 land square miles. DC is reported separately as a district and reaches 474.42. Alaska is at 2.59; its land area belongs in the national denominator because its registrations belong in the numerator.

Density describes registry concentration. It cannot predict a phone’s signal. The numerator includes multiple communications uses and omits installations outside ASR, so dividing by land area produces no measure of the mobile coverage experienced by a customer.

For a service route, replace state land area with the territory boundary you intend to cover and count only matching sites inside it. Then measure drive time between those sites. The route density calculator helps compare the sales territory with the crew’s daily schedule without treating an average square mile as a route.

What ASR leaves out of a telecom site inventory

Rooftop installations and small cells require additional sources because ASR follows registration criteria rather than attempting to enumerate every cellular service location.

The FCC’s small wireless facility definition in section 1.6002(l)(4) includes the condition that the facility does not require antenna structure registration under Part 17. That makes an ASR-only search a poor inventory method for that category. Building-related registrations show that some rooftops appear, but their presence cannot establish how many other rooftops are absent.

For an inventory specification, distinguish the object from the commercial relationship:

Counting unit Record to retain Question still requiring review
Registered antenna support ASR number and filed status Does it fit the service scope today?
Rooftop antenna installation Building, installation evidence and observation date Who authorizes access and equipment work?
Street-level small-cell location Support location and dated evidence Which installation and service responsibility apply?
Compound with several supports Compound identifier plus separate support records Is the work bought per support or for the compound?
Several telecom installations at one property Property identifier plus installation records Which buyer controls each scope?

This is PorchRocket’s recommended inventory schema, not another set of national counts. Keep records with uncertain responsibility open until the field or document check settles the question.

For building-based prospecting, Ground Control by PorchRocket can select visible antennas or dishes alongside commercial roof size and material or visible rooftop HVAC. A custom telecom inventory belongs in Asset Search when the decision requires reviewing towers, rooftop sites and the gaps between public datasets.

Aerial evidence needs a date. Treat a visible support in an older view as a candidate, and leave an obscured roof unresolved until another view or an authorized inspection supplies the missing evidence. Our asset inventory guide connects those observations to parcels and reviewed dispositions.

Methodology

PorchRocket calculated the November 2026 tables from the FCC’s November 1 full registration extract and the Census Bureau’s 2026 national state Gazetteer.

The FCC ZIP’s internal counts file dates its creation November 1, 2026 and reports 197,961 RA records. Our script reads the registration table, verifies that registration numbers are unique and checks the row count against that control file. The FCC introduction to public access files explains the distinction between registrations, applications and coordinate tables. We use the full registration file without appending daily transactions.

Use the structure’s state. Filtering that field to the 50 states and DC excludes 1,295 records with territories or other codes, leaves 196,666 before status filtering and avoids assigning a site to the owner’s mailing address. No state is inferred from a city name.

The FCC field-definition workbook supplies the positions for the fields used. Constructed rows require status C, archive flag C and no dismantlement date; granted rows require status G with the same additional tests. These checks remove three constructed-status records and two granted-status records from the main geographic subset. No owner or contact table is joined, so repeated contacts cannot multiply the count.

Counts by type use the exact filed code. The building group contains B, BANT, BMAST, BPIPE, BPOLE and BTWR. The script also writes a state-by-type cross-tab, including zero counts for codes absent from a state. Height calculations use positive overall AGL in meters; state maxima break ties with the lowest registration number.

For density, the script joins state postal codes to the 2026 Census state file, divides constructed counts by ALAND_SQMI and multiplies by 1,000. National density uses summed counts divided by summed land area. Percentages use the stated constructed denominator and are rounded independently to two decimal places.

The research archive retains the raw inputs, source URLs, file hashes and Python script. The November 5 review reran the script in Python’s isolated mode and reproduced all 9,672 published CSV rows byte for byte. Fresh downloads of the FCC registration ZIP and Census state ZIP matched the archived input hashes. The CSV also keeps the published industry figures and planning-model rows separate from the registry calculations through their source and method fields.

ASR does not identify a cellular-only inventory or verify current operation, and reported status can lag a physical change. Geographic assignment follows filed state text rather than a coordinate boundary check. The tables describe this dated registry snapshot; rooftop and small-cell coverage needs another investigation.

How to count tower and rooftop sites, step by step

Build a local telecom inventory by fixing the counting unit first, then reconciling registered structures with dated observations and the buyer’s service rules.

  1. Define the job. Write whether the team needs tower supports, rooftop installations or serviceable compounds. State which work qualifies a site and which installations should be excluded. Agree on the treatment of several supports behind one gate.
  2. Draw the territory. Use a written boundary that the sales manager and dispatcher both accept. Choose a drive-time territory if travel controls the margin. A statewide registry total belongs in a market note, while the outreach file needs a service boundary.
  3. Save the source edition. Download the full FCC registration file and record its internal creation date. Keep the raw ZIP. Use the constructed filter for the standing-inventory starting point and retain granted registrations in a separate review queue.
  4. Specify the Asset Search investigation. Request towers and rooftop antenna sites within the boundary, including candidates beyond the registry. Set the acceptance rules with your technical staff and start with a small paid pilot credited toward the full order.
  5. Check every candidate disposition. Review accepted sites and rejected candidates, including the rejection reason. Keep unresolved candidates with the single field check needed to decide them. Require dated evidence rather than an undated map pin.
  6. Join the property and buying roles. Preserve the ASR number where available, plus your site identifier and parcel. Keep property ownership separate from responsibility for telecom equipment. Confirm the purchasing role before the estimator prepares a proposal.
  7. Test the delivered file. Import sample records into the destination CRM or GIS. Check a multi-support compound and a building with several installations. Make sure the import preserves separate assets without sending duplicate outreach to the same buyer.
  8. Choose the refresh interval. Use a quarterly territory review for a standing service book, with change monitoring when additions and removals affect the decision sooner. Keep the old evidence date beside the new one so a physical change can be distinguished from a corrected record.

The installed-base mapping workflow extends this process when a manufacturer needs equipment families or a dealer territory instead of a general support inventory. I would approve a broader search after the pilot’s accepted rows import cleanly and the unresolved rows name a check the service team can perform.

What a verified tower territory is worth

In the planning model below, two signed service accounts generate $45,360 in five-year gross profit against $2,004 of research and outreach cost.

The tower service department evaluates 180 candidate locations for recurring compound upkeep. Allow 16 internal research hours at $50 per hour and 28 outreach hours at $43 per hour. Each signed account produces $12,600 of annual service revenue at a 36% gross margin, lasts five years and receives no assumed revenue growth. Hold the hours and rates constant across both outreach approaches. Treat both hourly rates as fully loaded labor costs. Assume remote outreach, access to an existing CRM and no additional campaign expenses. The comparison assumes the conversation, proposal and signed-account counts shown below; those outcomes are inputs to the model.

Research costs 16 x $50 = $800. Outreach costs 28 x $43 = $1,204. Total acquisition spend is $2,004. One account contributes $12,600 x 36% = $4,536 annually, or $4,536 x 5 = $22,680 across the planning period.

Same 180 starting locations Broad outreach Reviewed fit and buyer responsibility
Research and outreach budget $2,004 $2,004
Buyer conversations 12 18
Proposals 4 6
Signed accounts 1 2
Starting locations converted to accounts 0.56% 1.11%
Customer acquisition cost $2,004 $1,002
Five-year account gross profit $22,680 $45,360

Source for every row: PorchRocket’s planning assumptions and calculations, reproduced in the dataset script. The internal research allowance pays for the team’s own review. For a purchased investigation, add the scoped quote to the internal review and outreach costs that remain, then recalculate acquisition cost and ROI.

Customer acquisition cost means research and outreach spend divided by signed accounts. Account lifetime gross profit means annual revenue multiplied by gross margin and years retained. Most locations produce no signed work. The reviewed approach allocates the same outreach hours to sites that fit the crew’s service and buyers who can authorize it. Track conversations and proposals during the pilot to see which stage needs attention before committing the next research budget.

Outcome from the same campaign Signed accounts Five-year gross profit Gross profit less campaign cost Campaign ROI
Low 0 $0 -$2,004 -100.0%
Base 1 $22,680 $20,676 1,031.7%
High 2 $45,360 $43,356 2,163.5%

Source for every row: PorchRocket’s planning model. Campaign ROI equals gross profit less research and outreach cost, divided by that cost. It uses gross profit before other company overhead and financing costs, without discounting future years.

At two accounts, lifetime gross profit is 22.6 times campaign spend. The result comes from recurring account value and a 1.11% overall conversion rate. Change the annual value or retention assumption before using the model for a one-time inspection business.

I would expand a territory only after the pilot supports the proposed service fit and the outreach team can identify who buys the work. Put your own retention assumptions into the customer lifetime value calculator, then use the lead-list ROI calculator to compare acquisition budgets. A national tower count cannot supply those account economics.

How to cite these statistics

Cite PorchRocket’s November 2026 analysis with its source date and counting unit, so a quoted registration count remains distinct from a cellular tower estimate.

Suggested citation: PorchRocket, “How Many Cell Towers Are in the US? 2026 Counts by State,” 2026, https://porchrocket.com/how-many-cell-towers

You may reuse the calculations and tables with attribution and a link back to this page. Download the cell tower statistics CSV for values, units, geography and the method attached to each row. When quoting the published industry count, retain its association attribution and year-end observation date.

For the main FCC result, a self-contained citation reads: “PorchRocket’s November 2026 analysis of the FCC’s November 1 registration extract counts 141,080 current, constructed antenna structure registrations across the 50 states and District of Columbia.” State figures use that same filter. A future release should receive its own source date rather than silently replacing the date on a copied table.

Asset Search investigates the towers and rooftop sites within your territory, joining public starting records to dated evidence and reviewed answers for your service rules. Tell Asset Search what to find and where, then agree on a scope and quote. The search cross-references aerial and satellite views with property records and public data. Every candidate receives human review. Your file includes location and parcel, owner information, decision-maker contact where it applies, dated views and the facts behind a fits, rejects or unresolved answer. Unresolved sites name the field check that settles the question. Most buyers start with a paid pilot credited toward the full order; per-accepted-result terms fit a defined prospecting inventory, while a subscription fits continuing change monitoring. Order the territory in CSV, Excel or GIS-ready format after reviewing the pilot.

Questions people ask

Quick answers

How many cell towers are in the United States in 2026?

The latest purpose-built cellular tower count cited here is 158,500 at year-end 2025, published by the Wireless Infrastructure Association in March 2026. PorchRocket separately counts 141,080 current, constructed FCC antenna structure registrations in the 50 states and DC using the November 1, 2026 extract. The definitions and observation dates differ.

Which state has the most cell towers?

Texas has the most current, constructed FCC antenna structure registrations in PorchRocket's November 2026 analysis: 14,618. California follows with 6,872 and Florida with 6,657. These are registered communications structures, including uses beyond cellular service. ASR does not establish a state ranking of every purpose-built cellular tower or every rooftop installation.

Does the FCC ASR database include every cell tower?

No. ASR registration follows height and aviation-related criteria, with voluntary registrations also possible. Many shorter installations fall outside the registry, while the database includes broadcast and other communications structures. Keep registered structures, cellular towers and cell sites as separate counting units when preparing a market estimate or territory inventory.

How many registered towers are in Texas?

Texas has 20,709 registration records across all statuses in the November 1, 2026 FCC extract. PorchRocket's stricter inventory count includes 14,618 current, constructed registrations and reports 2,225 current, granted registrations separately. The constructed count equals 55.95 registrations per 1,000 land square miles using Census 2026 land area.

How many towers are there per square mile?

PorchRocket calculates 0.0399 current, constructed FCC registrations per land square mile across the 50 states and DC, or 39.92 per 1,000 land square miles. This divides 141,080 registrations by 3,533,659.763 land square miles. The measure describes registry concentration; it does not measure mobile coverage, signal strength or service quality.

What is the tallest registered tower in the US?

The highest overall above-ground height in PorchRocket's current, constructed ASR subset is 627.8 meters for registration 1038731 near Galesburg, North Dakota. The November 2026 analysis ranks filed heights and does not restrict the records to cellular use. State maximum heights and identifying registrations are included in the downloadable CSV's methods.

Can I use ASR to find rooftop antennas and small cells?

Use ASR as one source, then add property records, local permits and dated imagery. The registry contains some building-mounted structures but does not enumerate all rooftop installations. Asset Search reviews tower and rooftop candidates against your rules and returns fits, rejects with reasons and unresolved sites with the field check needed to settle them.

Can I download and cite these cell tower statistics?

Yes. Download the CSV linked in the article and cite PorchRocket's November 2026 analysis with a link to this page. Preserve the geography and current, constructed registration filter when quoting a count. The CSV includes the source URL and calculation method for each statistic, including the separate published industry figures.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. Wireless infrastructure counts for year-end 2025Wireless Infrastructure Association: March 18, 2026 publication reporting purpose-built towers, macrocell sites, outdoor small cells and indoor nodes. Checked November 2026.
  2. FCC ASR full registration databaseFederal Communications Commission: Downloaded current full extract; its counts file dates the release November 1, 2026. Original calculations use RA.dat and retain the raw ZIP and reproducible script. Checked November 2026.
  3. Introduction to ASR public access filesFederal Communications Commission: Documents full versus daily downloads, registration and coordinate tables, joins and weekly file creation. Checked November 2026.
  4. ASR database field definitionsFederal Communications Commission: FCC workbook defines the RA field positions used for state, status, archive flag, dismantlement, structure type and overall AGL. Checked against the current extract in November 2026.
  5. ASR status and archive code definitionsFederal Communications Commission: Distinguishes constructed, granted, canceled, dismantled and terminated statuses and current versus archived flags. Checked November 2026.
  6. FCC antenna registration scope and voluntary registrationsFederal Communications Commission: Paragraph 3 explains height and airport-related registration criteria; paragraphs 20 and 21 confirm voluntary registration. PDF retrieved and checked November 2026.
  7. FCC definition of small wireless facilitiesFederal Communications Commission: Section 1.6002(l)(4) requires that a small wireless facility not require ASR registration. PDF retrieved and checked against current eCFR text in November 2026.
  8. Census 2026 Gazetteer filesU.S. Census Bureau: Current 2026 release, geographic coverage and link to the state file. Checked November 2026.
  9. Census 2026 national state Gazetteer raw dataU.S. Census Bureau: Downloaded pipe-delimited state file; ALAND_SQMI supplies land-area denominators. Puerto Rico is excluded from the main analysis. Checked November 2026.
  10. Census Gazetteer record layoutsU.S. Census Bureau: Defines USPS geographic join codes and ALAND_SQMI as land area in square miles. Checked November 2026.
  11. Filed tower type definitionsVolusia County: Public GIS dictionary decodes lattice, guyed, monopole, building, tank and utility support codes; used for labels, not counts. Checked November 2026.
Your next best move

Find the telecom sites your territory count misses.

Tell us the area and what qualifies. Asset Search scopes a reviewed tower and rooftop inventory with dated evidence, parcels and owner information, starting with a paid pilot credited toward the full order.

Find towers and rooftop sites