Privacy choices

Choose what we may use.

The site works without optional tracking. Your choice is saved on this device and can be changed here anytime.

Necessary

Runs the site, protects forms, and remembers this privacy choice.

Always on

Asset reference

Geospatial Asset Terms Glossary 2026: 80 Definitions

Use the same definitions in your search brief, territory file and field inspection. Includes original generator-versus-site calculations and a downloadable reference dataset.

The short answer

A geospatial asset terms glossary explains how physical equipment, locations and dated observations become a searchable inventory. Installed base means equipment deployed in the field; change detection compares observations across dates; MS4 means municipal separate storm sewer system; ERU means equivalent residential unit. This reference defines 80 terms and demonstrates why equipment counts differ from site counts. Asset Search by PorchRocket applies agreed definitions to reviewed searches, returning fitting, rejected and unresolved sites with dated evidence.

Tell us what to find

What matters most

  • PorchRocket's analysis of September 2026 EIA-860M data counts 8,335 operating solar generator records across 7,651 plant IDs.
  • The same analysis finds 477 EIA plant IDs reporting both operating solar photovoltaic generators and operating batteries in September 2026.
  • USGS lists 30-meter multispectral resolution for Landsat 8; pixel size and equipment-identification accuracy describe different things.
  • EPA defines MS4 as a municipal separate storm sewer system, while an ERU is a stormwater billing unit set by the local utility.
  • Asset Search returns fits, rejects and unresolved cases against the buyer's specification, with dated evidence for each investigation.

A territory file can count equipment, buildings, parcels or operating sites. Those totals answer different questions. If sales asks for cooling-tower sites and research returns equipment cells, the branch manager still has to work out how many owners to call.

Updated November 2026, this geospatial asset terms glossary defines 80 terms used in search briefs and asset inventories. Asset Search by PorchRocket applies the buyer’s definitions to dated observations and reviewed site decisions. The original public-data calculations below show why the counting rule belongs beside the number; the definitions then explain what to put in the file.

Key statistics

PorchRocket’s September 2026 EIA-860M analysis separates operating generator records from distinct plant IDs; the reference values describe imagery and oil storage.

  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook counts 26,235 operating-status generator records in the United States, excluding Puerto Rico.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook counts 14,280 distinct U.S. plant IDs with at least one operating-status generator.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook counts 8,335 operating U.S. solar photovoltaic generator records.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook counts 7,651 U.S. plant IDs reporting operating solar photovoltaic generators.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook sums 170,562.5 MW of operating U.S. solar photovoltaic nameplate capacity.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook counts 1,125 operating U.S. battery generator records.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook counts 1,071 U.S. plant IDs reporting operating batteries.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook sums 55,574.5 MW of operating U.S. battery nameplate power capacity.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook identifies 477 U.S. plant IDs reporting both operating solar photovoltaic generators and operating batteries.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook identifies 7,174 U.S. plant IDs reporting operating solar photovoltaic generators without operating batteries.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook identifies 594 U.S. plant IDs reporting operating batteries without operating solar photovoltaic generators.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook identifies 302 U.S. plant IDs reporting more than one operating solar photovoltaic generator record.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook identifies 45 U.S. plant IDs reporting more than one operating battery generator record.
  • PorchRocket’s analysis of EIA’s September 2026 EIA-860M workbook counts 8,245 distinct U.S. plant IDs in the union of operating solar photovoltaic and battery plants.
  • USGS’s Landsat 8 specifications, checked in November 2026, list 30-meter multispectral spatial resolution.
  • USGS’s Landsat 8 specifications, checked in November 2026, list 15-meter panchromatic spatial resolution.
  • USGS’s Landsat 8 specifications, checked in November 2026, list a 16-day repeat cycle for the satellite.
  • USGS’s Landsat 8 specifications, checked in November 2026, describe an 8-day orbital offset with Landsat 9, rather than guaranteed cloud-free observations.
  • EPA’s SPCC applicability guidance, checked in November 2026, sets the aboveground oil-storage capacity test at greater than 1,320 U.S. gallons alongside other applicability conditions.
  • EPA’s SPCC applicability guidance, checked in November 2026, excludes containers smaller than 55 U.S. gallons from the aggregate oil-storage capacity calculation.

Sources: EIA’s September 2026 raw generator workbook, USGS Landsat 8 specifications and EPA’s SPCC applicability questions. The generator figures use only records marked operating, not standby or out of service; the methodology gives the filters.

Asset search and installed base terms

Define the asset and the unit being counted before setting the acceptance rule, then preserve that specification through delivery.

These are operational definitions for a commissioned search. Put the agreed meaning on the crew’s rule sheet.

Term Definition and reference
1. Asset Asset means the physical item or installation the search is intended to locate, such as a cooling tower or detention basin. Define its boundary before requesting a count in an aerial asset inventory.
2. Asset class Asset class means a group searched under a shared definition, such as aboveground tanks or loading docks. Write exclusions beside the category so adjacent equipment does not enter the same inventory category.
3. Asset inventory Asset inventory means an organized record of assets and their locations, with identifiers and supporting observations. A sales inventory should retain the relationship between equipment and the site where a rep will make contact; see the inventory workflow.
4. Installed base Installed base means equipment deployed in the field within a stated product, geography or service scope. Equipment sitting in storage needs a separate label from equipment serving a facility in an installed-base mapping program.
5. Candidate Candidate means a possible match awaiting a decision against the agreed search rules. Keep the evidence that caused it to enter review so another person can assess the same candidate site.
6. Search specification Search specification means the written definition of what counts, where to look and which exceptions require review. It should describe the buyer’s decision closely enough that the search team can explain each acceptance or rejection.
7. Evidence date Evidence date means the date attached to the observation supporting a site decision. Keep image capture dates separate from the research date and from a record’s publication date in the inventory handoff.
8. Disposition Disposition means the reviewed outcome assigned to a candidate under the specification. Asset Search returns fits, rejects with reasons, and unresolved cases with the field check needed to settle the question; see reviewed search delivery.
9. Unresolved Unresolved means the available evidence does not settle a required criterion. Name the missing fact and assign the deciding field check so the site investigation can move forward without quietly treating uncertainty as either acceptance or rejection.
10. Asset monitoring Asset monitoring means watching a defined territory or inventory for relevant physical changes and reporting dated updates. Match the delivery interval to the action your team will take through an ongoing monitoring program.

I would settle the counting unit first. A tower service department might need a site record with equipment observations attached, while a parts program needs separate installation records that still connect to the owner contact without forcing a rep to call the same facility repeatedly.

Imagery resolution and capture terms

Choose imagery by the detail and observation dates needed to decide the asset question, rather than by a broad aerial or satellite label.

The USGS guidance on image enlargement explains that enlarging a photograph adds no object detail. Ask whether the original observation resolves the feature that determines eligibility.

Term Definition and reference
11. Remote sensing Remote sensing means observing an object or surface without touching it, using a sensor at a distance. An asset search uses those observations to identify visible features; the USGS glossary supplies the broader technical definition.
12. Aerial imagery Aerial imagery means images acquired from an airborne platform, including aircraft or drones. Check scale, visibility and capture date for the individual observation when comparing aerial and satellite imagery for a small equipment search.
13. Satellite imagery Satellite imagery means observations acquired by an orbiting sensor, with detail and revisit characteristics that depend on the system. The platform label alone does not establish whether the image can answer a site-level asset question.
14. Orthophoto Orthophoto means an image corrected for geometric distortions so it can serve as a map-like view. Use it with its stated positioning information when relating an observed asset to a parcel in an imagery-based inventory.
15. Ground sample distance Ground sample distance, or GSD, describes ground spacing represented by image samples, commonly expressed as distance per pixel. It describes sampling detail rather than a guarantee that a particular object will be identifiable in the selected imagery.
16. Spatial resolution Spatial resolution describes the ground detail an imaging system can distinguish. USGS uses this term in its Landsat glossary; specify it alongside the asset’s distinguishing features when writing the evidence requirements.
17. Temporal resolution Temporal resolution describes how frequently observations are available across time. A planned repeat interval and the interval between usable views can differ, so retain the dates of the images used for change detection.
18. Acquisition date Acquisition date means when an image was captured, as defined in the USGS glossary. It establishes the observation date, while a website update or delivery timestamp describes a different event in the record’s history.
19. Nadir imagery Nadir imagery looks downward toward the surface beneath the sensor. It supports overhead layout review, while the visibility of a specific equipment arrangement still depends on resolution and obstruction in the imagery review.
20. Oblique imagery Oblique imagery looks at the surface from an angle rather than straight down. The angled perspective can supply another view of an installation, which should be reconciled with the overhead view during site review.

Preserve capture dates when importing the file into the dealer system. A rep needs the age of the evidence behind a match, even when the research was finished this week.

GIS locations and geometry

GIS records need an explicit coordinate reference and a geometry that matches the object, whether the delivery contains site points or measured boundaries.

An address helps the rep place the call. The asset identifier distinguishes equipment sharing that address.

Term Definition and reference
21. GIS GIS means geographic information system, a system for storing, analyzing and displaying geographically referenced information. The USGS lidar glossary describes the technical system; a buyer should also specify the geometry and fields needed for import.
22. Geocoding Geocoding means converting an address into a geographic location. The Census geocoding documentation explains that its coordinates are calculated along address ranges, so an address match should be checked before assigning equipment to a parcel.
23. Coordinate reference system Coordinate reference system means the framework that gives coordinates their location meaning, including the relevant coordinate system and datum. Preserve that information with a file so another GIS can position the records correctly; see the federal metadata glossary.
24. Datum Datum means a reference framework used to describe positions or elevations. Horizontal and vertical references answer different questions, so retain the applicable reference information described in the USGS lidar glossary.
25. Latitude and longitude Latitude and longitude describe geographic position as angular coordinates. State their order and reference framework when exchanging a CSV, rather than leaving the importing team to infer which field contains which coordinate; see geospatial metadata terminology.
26. Raster Raster means data represented by a grid of cells or pixels. An aerial image is a familiar example; the USGS Landsat glossary explains the representation used when interpreting image detail or classifying surface areas.
27. Vector Vector means a geospatial representation using coordinate-defined geometry rather than an image-cell grid. The USGS lidar glossary distinguishes this data family, which can hold site locations or asset boundaries alongside a separate imagery layer.
28. Point Point means a coordinate-defined location without an area boundary in the dataset. A site point can mark where to investigate, but it does not measure the equipment footprint or parcel extent; see the federal geospatial glossary.
29. Polygon Polygon means a closed area represented by a boundary. Use separate geometries when the parcel boundary and the observed asset boundary answer different questions, following the distinction between location and area in geospatial data terminology.
30. Spatial join Spatial join means attaching information between geographic layers using their spatial relationship. Assigning observed asset locations to service territories is one application; inspect boundary cases before using the result to allocate installed-base accounts.

Test the import. I would keep site identifiers separate from equipment identifiers so that replacing an installation or adding equipment updates the right record without creating another account for a facility the sales department already knows.

Accuracy and change detection terms

Evaluate false matches and missed assets separately, and keep uncertain observations outside either category until the deciding evidence is available.

The Census research paper’s confusion matrix and formulas distinguish precision from recall. Here TP means true positives, FP means false positives and FN means false negatives; establish the reference labels through an independent inventory check.

Term Definition and reference
31. Change detection Change detection means comparing observations of the same location across dates to identify differences. Report the observed addition, removal or rearrangement with both dates in a new-installation monitoring file, then assign follow-up according to the buyer’s rule.
32. Baseline Baseline means the starting inventory or observation used for later comparison. Freeze its date and search definition so a changed eligibility rule can be distinguished from a physical site change in an asset-monitoring program.
33. Ground truth Ground truth means reference evidence used to check an observation or classification, commonly established through independent verification. The USGS glossary defines the term; an authorized field inspection can provide reference evidence for a specific asset question.
34. Precision Precision means true positive matches divided by all positive matches, or TP / (TP + FP). The Census formulas support this measure of how many delivered positives survive comparison with the reference labels.
35. Recall Recall means true positive matches divided by all reference positives, or TP / (TP + FN). Use the Census formula with an independent reference sample when testing how much eligible equipment a search missed.
36. False positive False positive means a reported positive that the reference evidence classifies as negative. In a search audit, keep the failed criterion beside the record so a definition problem can be distinguished from an identification error.
37. False negative False negative means an eligible asset that the search did not identify as positive. Review geography outside the delivered hits when auditing inventory coverage, because checking accepted records alone cannot expose omitted installations.
38. Confidence score Confidence score means a system’s numerical indication of support for a classification. Ask how the score was calibrated before interpreting it as a probability, and keep the observed evidence beside the decision in the reviewed inventory.

Audit the misses. Asset Search searches beyond existing lists; people review each candidate against the agreed rules before delivery. An independent check of geography outside the delivered list tests a different question from checking whether its accepted records fit.

MS4, ERU and stormwater terms

MS4 names a drainage system, ERU names a billing reference, and basin terminology describes facilities that need their own location and maintenance records.

The crew needs an asset location. A system-level permit can cover an outfall and its upstream pond, while the two structures require different work orders.

Term Definition and reference
39. MS4 MS4 means municipal separate storm sewer system, a publicly owned stormwater conveyance or system that discharges to waters of the United States, separate from combined sewers and sewage treatment. EPA’s definition covers a system that can contain many drains, pipes and ditches rather than one structure.
40. NPDES NPDES means National Pollutant Discharge Elimination System, the discharge-permitting program that includes regulated municipal stormwater discharges. EPA’s municipal stormwater guidance connects the permit program to MS4 operators and their stormwater management programs.
41. BMP BMP means best management practice, a measure used to manage stormwater runoff or its pollutants in this context. A structural BMP belongs in the inventory under its specific type, such as the dry detention pond described by EPA.
42. Impervious surface Impervious surface means a surface that substantially prevents water from soaking into the ground, such as a conventional paved lot or roof. Apply the relevant program’s classification rules when building an impervious-surface inventory.
43. ERU ERU means equivalent residential unit, a stormwater billing reference generally based on residential impervious area. New Jersey’s utility guidance explains the rate structure; the reference area comes from the utility adopting it, rather than a nationwide conversion factor.
44. Dry detention basin Dry detention basin means a facility that temporarily stores runoff without a large permanent pool of water. EPA’s dry-pond fact sheet notes that small pools can occur at inlets and outlets, which matters when classifying a dated aerial view.
45. Wet pond Wet pond means a stormwater pond with a permanent water pool and storage for incoming runoff. Distinguish its designed operation from water visible after a storm when assembling a pond inventory for a maintenance crew.
46. Forebay Forebay means a pretreatment area near a facility’s inlet that collects sediment before flow reaches the main treatment area. Preserve its location within the larger pond or basin record so the maintenance scope can identify the work area.
47. Outfall Outfall means the location where a drainage system discharges into a receiving water or another defined receiving feature. Record the observed outlet and the network relationship separately when preparing a drainage asset inventory.
48. Culvert Culvert means a conduit carrying water through an embankment or beneath a crossing. Its visible ends can support a culvert location inventory, while records and a field inspection establish the alignment and dimensions needed to specify work.

Find the authorized gate. Request its location separately from the pond boundary when the route crew needs permission to enter elsewhere on the property.

RTU, power and energy storage terms

Name the reporting unit before using an energy count to size a service market, then check operating status and capacity units separately.

Term Definition and reference
49. RTU RTU means rooftop unit, generally packaged HVAC equipment mounted on a building’s roof. New York City’s mechanical glossary describes a single package serving all or part of a building; record the roof location separately from the equipment count.
50. Cooling tower Cooling tower means equipment that rejects heat by cooling a water stream, often as part of a chilled-water system. The city mechanical glossary distinguishes it from other HVAC components that could appear beside it.
51. Substation Substation means an electrical installation that switches, controls or transforms power within a network. Set the installation boundary before counting the separate equipment visible inside a substation search, especially when the buyer services only one equipment category.
52. Transformer Transformer means electrical equipment that changes voltage levels. A transformer location search should distinguish a visible enclosure candidate from equipment whose identity and rating have been established through records or an authorized inspection.
53. Generator Generator means equipment that supplies electrical output; its reporting unit depends on the dataset. In the EIA generator workbook, identify records by plant ID plus generator ID rather than assuming every row represents a separate fenced site.
54. Power plant Power plant means a facility containing electricity-generating equipment. For this reference’s EIA analysis, a plant count means distinct reported plant IDs, an administrative grouping that should remain separate from parcel boundaries and imagery-derived site definitions.
55. Nameplate capacity Nameplate capacity means the equipment’s rated output capacity under the reporting definition. The EIA workbook reports this in MW, which should stay separate from energy produced over a period or storage energy capacity.
56. MW MW means megawatt, a unit of power that describes an output or charging/discharging rate. EIA’s storage explanation distinguishes power capacity from the amount of energy a storage installation can hold.
57. MWh MWh means megawatt-hour, a unit of energy rather than power. A battery inventory needs the energy-capacity field separately from MW to describe storage capability, as explained in EIA’s energy storage reference.
58. BESS BESS means battery energy storage system, equipment that stores energy in batteries and later supplies electricity. Keep the compound, reporting-unit count and capacity fields distinct when specifying a battery storage site inventory for service outreach.

The original counts below use OP-status records in the September 2026 file. Each row counts reported generating units; it is not a count of visible components.

EIA technology Operating generator records Distinct plant IDs Nameplate MW Source
Solar photovoltaic 8,335 7,651 170,562.5 PorchRocket analysis of September 2026 EIA-860M
Batteries 1,125 1,071 55,574.5 PorchRocket analysis of September 2026 EIA-860M
Onshore wind turbine 1,561 1,373 165,931.4 PorchRocket analysis of September 2026 EIA-860M

The 477 shared plant IDs belong to both technology groups. Deduplicating them produces 8,245 plant IDs, without establishing a shared parcel or purchasing contact. For building-based denominators, use our commercial-building statistics and rooftop-unit statistics; for replacement planning, use the building-system service-life reference.

Storage tank and SPCC terms

Tank inventories need a visible asset description plus records for contents and capacity before anyone applies an oil-storage rule to the facility.

Term Definition and reference
59. AST AST means aboveground storage tank, describing the tank’s placement rather than its contents. EPA’s AST guidance explains that oil-holding tanks may fall within SPCC; a visible vessel alone does not establish the stored product or applicability.
60. UST UST means underground storage tank system, which under EPA’s definition includes connected underground piping and has at least 10 percent of its combined volume underground. Keep underground-system records separate from a search for visible aboveground tanks.
61. Tank farm Tank farm means a grouped storage installation containing multiple tanks and supporting infrastructure. Define whether the buyer wants the whole facility or each visible vessel when requesting aboveground tank locations, then preserve the parent-site relationship in the delivery.
62. Bulk storage container Bulk storage container means a container used to store oil in the SPCC context. EPA distinguishes these containers from oil-filled electrical, operating or manufacturing equipment, even though that equipment can still affect facility storage-capacity calculations.
63. Secondary containment Secondary containment means a backup means of containing a discharge, such as a containment area around storage. EPA’s explanation distinguishes general containment from specific bulk-container requirements; a mapped berm is an observed feature that needs assessment against the applicable requirements.
64. SPCC SPCC means Spill Prevention, Control, and Countermeasure, EPA’s oil-discharge prevention program. Its applicability questions combine storage-capacity thresholds with facility activities, discharge potential and exclusions, so a tank count alone cannot answer whether a facility is covered.

Ask what the vessel holds. Product records or an authorized site check can establish contents and capacity; I would attach those findings to the dated observation before deciding which tank-service campaign gets the account.

Parcels, IOS and real estate terms

Property records describe land and buildings, while an asset search records the visible installations that make a location fit a service or equipment offer.

Term Definition and reference
65. Parcel Parcel means a defined land unit recorded in the relevant property system. Relate the parcel to the operating site before treating it as an account, because a property-owner investigation can involve several parcels or buildings.
66. APN APN means assessor’s parcel number, an identifier assigned within an assessor’s system. Sacramento County’s APN explanation shows its local recordkeeping role; preserve the jurisdiction beside the number when combining counties into a territory file.
67. Building footprint Building footprint means the area occupied by a building in plan view. It answers a different sizing question from total floor area, so label the measure when using commercial-building statistics to set a target-building band.
68. Gross floor area Gross floor area means the combined floor area counted under a stated building-data definition. Retain that definition when comparing buildings with different numbers of stories, and keep roof-related measures separate in a building market analysis.
69. Site coverage Site coverage means the share of a defined site occupied by the specified improvement or surface. State both the numerator and the site boundary before using the ratio in a site-selection screen; local zoning definitions may use a narrower measure.
70. IOS IOS means industrial outdoor storage, land used for outdoor storage of equipment, vehicles, containers or materials. A visible yard starts an IOS site investigation, while permitted use and access determine whether it suits the intended operation.
71. Zoning Zoning means the local rules governing land use and development within mapped districts. Check the applicable district and approvals during site selection, since an observed outdoor activity does not by itself establish permission for a proposed use.
72. Recorded owner Recorded owner means the person or entity shown as owner in the property record being consulted. Trace the commercial property’s ownership and management before assuming that the recorded name also identifies the person who approves equipment service spending.

Ground Control for standard property filters

Ground Control by PorchRocket is the fastest way to buy a standard building list by business type, building size, rooftop HVAC presence or visible storage tanks. Commercial records cost $10 to $20 per building and arrive within 48 hours after payment, with wrong matches credited back within 30 days. Each property explains its match; owner and decision-maker research are add-ons. Start with Ground Control, rooftop-HVAC building lists or storage-tank property lists. The owners have not requested quotes.

Government contracting terms

Public-work documents define the offered scope and submission rules, so use their terminology when an asset inventory becomes a maintenance or replacement bid.

These federal meanings come from the FAR. Preserve each buyer’s wording and submission rules.

Term Definition and reference
73. Solicitation Solicitation means a government request for offers or quotations. FAR 2.101 distinguishes the documents used under different purchasing procedures; retain the agency identifier so later amendments attach to the correct opportunity.
74. IFB IFB means invitation for bids, the solicitation used for federal sealed bidding. FAR 2.101 separates an IFB from negotiated-proposal procedures, which matters when a contractor decides how to prepare the response and check submission requirements.
75. RFP RFP means request for proposals, the federal solicitation used under negotiated procedures. The FAR definition identifies the document type; the solicitation supplies its evaluation factors and the instructions the contractor should use to assemble a response.
76. RFQ RFQ means request for quotations, commonly used in federal simplified acquisition. FAR 2.101 explains that a quotation differs from an offer, so preserve the document type rather than labeling every response a sealed bid.
77. Addendum Addendum means a formally issued change to solicitation documents in many public-bid workflows. Federal sealed-bid rules use amendment terminology in FAR Part 14; keep each issued change with the packet and follow its acknowledgment instructions.
78. Responsive bid Responsive bid means a bid that complies with the invitation’s material requirements in federal sealed bidding. FAR 14.301 within Part 14 supplies that standard; price alone does not establish whether the submission meets it.
79. Bid tabulation Bid tabulation means a record organizing submitted bids and their prices for comparison. Federal bid-opening and abstract rules appear in FAR Part 14; preserve the stated quantities and scope when using a tabulation to research pricing.
80. IDIQ IDIQ means indefinite-delivery, indefinite-quantity, a contract structure covering orders within stated limits over a fixed period. FAR 16.504 in Part 16 distinguishes the required minimum from the maximum, which should stay separate when recording potential contract volume.

When a city, county or school district needs the work, Bid Control by PorchRocket finds public opportunities and connects the bid documents with deadlines and changes. Use the bid-package checklist to carry an inventory-based scope into the required submission.

How to write an asset-search brief, step by step

Build the brief around one decision and test the counting rule in a pilot before expanding the search across the full territory.

  1. Write the action the file must support. A cooling-tower repair crew needs a queue for authorized assessments; an equipment maker may need a territory coverage audit.
  2. Pick the asset and delivery units. State whether one record represents a site, an installation or a visible component, and explain how linked records should connect.
  3. Draw the geography. Supply the counties, service boundary or dealer territories, then decide which rule governs a site that crosses a boundary.
  4. Submit the specification to Asset Search. Request a small paid pilot with dated views, parcel and owner information, and all reviewed dispositions; the pilot is credited toward the full order.
  5. Have your technical lead review edge cases. Include an accepted site and a rejected configuration, then write the deciding test for any unresolved case before releasing another batch.
  6. Test the handoff in the destination file. Open the CSV, Excel, GIS-ready delivery or CRM import and confirm that the people placing calls can retrieve the supporting evidence.
  7. Assign field checks and account ownership. Keep technical eligibility separate from dealer assignment and from the contact who can authorize a visit.
  8. Set the refresh rule. Choose a quarterly territory edition when that fits account planning, or specify a faster monitoring decision and the coverage it requires.

Keep the pilot’s rule version. If the buyer later accepts another equipment arrangement, the team can re-answer sites already searched, often using existing evidence.

The cost of a poorly defined target

A precise search definition protects sales hours by moving equipment qualification into a reviewed record before the rep starts arranging visits.

Say a cooling-tower service department in Fort Worth budgets 42 hours for territory research and first-touch preparation at a sales labor cost of $47 an hour. Assume an unreviewed address takes 21 minutes to qualify and prepare, compared with 7 minutes for a reviewed fitting site. Hold the labor budget fixed.

Workflow input or output Unreviewed addresses Reviewed fitting sites
Available sales hours 42 42
Minutes of qualification and preparation per record 21 7
Records the team can work 120 360
Sales labor budget $1,974 $1,974

The arithmetic is 42 x 60 / 21 = 120 records and 42 x 60 / 7 = 360 records. Under those inputs, the same hours support 3 times as many prepared accounts. The search quote remains a separate acquisition cost; count it when comparing the approaches.

For account value, assume a signed maintenance account produces $3,870 of annual gross profit after service costs and remains for an expected 4 years. Customer lifetime value measured as undiscounted gross profit is $3,870 x 4 = $15,480 per account. Use account-level costs that include travel when building your own figure.

Sensitivity case Signed accounts assumed Four-year account gross profit before acquisition costs
Low 1 $15,480
Base 2 $30,960
High 3 $46,440

Compare the expected gross profit from each workflow after subtracting its full acquisition cost, including research, outreach, visits and proposals. This model spends the same sales hours in both cases: the benefit is more prepared accounts, so do not add a cash saving for those hours. Buy the research when the added account gross profit exceeds the added acquisition cost. Lead-list ROI is (account gross profit minus acquisition cost) / acquisition cost; test your inputs in the lead-list ROI calculator.

All workflow and account-value figures in these tables reproduce from the calculation script and appear in the CSV as model rows. They are separate from the EIA counts.

Methodology

The original analysis uses EIA’s September 2026 EIA-860M workbook, released October 23, with plant IDs deduplicated separately from generator records.

The input is the archived September generator workbook. Read the Operating sheet using its third row as column headings, retain a nonblank Plant ID, and filter Status to exactly (OP) Operating. Exclude standby/backup and both out-of-service categories even though they appear on that sheet. The geography is the 50 states and District of Columbia; Puerto Rico appears on a separate sheet and is excluded.

Count generator records using the Plant ID and Generator ID pair and check for duplicates. Filter Technology to Solar Photovoltaic, Batteries or Onshore Wind Turbine for the technology table. Count distinct Plant IDs within each group and sum Nameplate Capacity (MW), rounding the sum to one decimal place. The combined solar-or-battery count is the union of the two plant-ID sets; the shared count is their intersection. Count plants with multiple records by grouping each technology on Plant ID and retaining groups larger than one.

EIA-860M is preliminary and covers reporting power plants with at least 1 MW of combined nameplate capacity; it does not enumerate every small installation. Plant IDs and generator records are reporting units, so neither establishes a parcel count, individual wind-turbine count or service-account count. The shared solar/battery calculation establishes co-reporting under a plant ID, without establishing a shared interconnection.

The CSV separates official reference values from the sales-workflow model, with a source and method attached to each row. Battery MW measures power capacity.

The retained calculation script records the workbook’s source URL and SHA-256 hash, then writes the published CSV using these filters. It also reproduces the sales-time model and account-value table. Keep building counts separate from generator records.

How to cite these statistics

Cite PorchRocket as the analyst for the original EIA cuts, and retain the September 2026 data month and the plant-versus-generator counting unit.

Suggested citation: PorchRocket, “Geospatial Asset Terms Glossary 2026: 80 Definitions,” 2026, https://porchrocket.com/asset-search-glossary

Reuse the definitions and calculations with a link back. Download the reference statistics and calculation outputs as CSV, including source URLs and methods. Retain USGS or EPA attribution when quoting their specifications or thresholds.

Asset Search applies your technical definitions to a reviewed search for visible physical assets, from one county to the contiguous United States.

Use the two-minute Asset Search form to define the territory and target. Your team helps set acceptance rules; every candidate receives human review supported by dated evidence. The delivery connects site locations with parcel and owner information, including decision-maker contact where applicable, and returns every disposition: fits, reasoned rejects, or unresolved sites with the deciding field check. Choose CSV, Excel, GIS-ready files or a system import. Per-investigation terms fit an audit; monitoring subscriptions fit an ongoing territory book, with a small paid pilot credited toward the full order. Tell us what to find.

Questions people ask

Quick answers

What does installed base mean for an equipment service business?

Installed base means equipment deployed in the field within a defined product, territory or service scope. Specify whether you count units, systems or sites. A service department can map equipment it maintains alongside eligible equipment outside its customer file, then use records and authorized inspections to establish equipment identity and service responsibility.

What is change detection in asset search?

Change detection compares observations of the same location across dates to identify additions, removals or altered arrangements. Keep both capture dates and the evidence behind the decision. The interval between observations bounds when the visible change happened; a commissioning date requires a separate record or confirmation.

What is an MS4?

MS4 means municipal separate storm sewer system. EPA describes publicly owned stormwater conveyances, such as drains, pipes and ditches, that discharge to waters of the United States and are separate from combined sewers and sewage-treatment systems. A municipality's MS4 can include many assets and outfalls under its permit program.

What is an ERU in stormwater billing?

ERU means equivalent residential unit, a billing reference generally based on residential impervious area within a stormwater utility's service area. The utility sets its own reference area and charging rules. Use its adopted schedule when converting a parcel's measured impervious area into billing units.

What is IOS in real estate?

IOS means industrial outdoor storage, land used for activities such as equipment storage, trailer parking or container storage. An aerial view can help identify the yard and its arrangement. Confirm permitted use, site access and operating requirements with the relevant records before treating a candidate as suitable for a proposed operation.

What is the difference between a dry detention basin and a wet pond?

A dry detention basin temporarily holds stormwater without a large permanent pool. A wet pond maintains a permanent pool with additional storage for runoff. Small inlet or outlet pools can occur in a dry basin, so classify the designed facility using drainage documents and dated observations.

What does SPCC stand for?

SPCC stands for Spill Prevention, Control, and Countermeasure. EPA's oil-pollution program includes an aboveground storage applicability threshold greater than 1,320 gallons, with containers smaller than 55 gallons excluded from that calculation. Facility activities, discharge potential and other exclusions also affect applicability; visible tank count alone does not decide it.

What is an RTU on a commercial building?

RTU means rooftop unit, generally packaged HVAC equipment serving a building or part of it. Specify the roof location and whether the inventory counts equipment units or buildings. Visible equipment supports a prospecting filter, while a technician or equipment record establishes capacity and model.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. September 2026 preliminary monthly electric generator inventoryU.S. Energy Information Administration: Raw EIA-860M workbook released October 23, 2026; Operating sheet, OP status only; downloaded and analyzed November 2026.
  2. Landsat glossaryU.S. Geological Survey: Remote sensing, acquisition dates, temporal and spatial resolution, and raster terminology; checked November 2026.
  3. Lidar Base Specification glossaryU.S. Geological Survey: 2025 revision A reference for GIS, datum, vector data and ground truth; checked November 2026.
  4. Landsat 8 technical and orbit factsU.S. Geological Survey: 30-meter multispectral and 15-meter panchromatic resolution, 16-day cycle and 8-day offset; checked November 2026.
  5. Federal geospatial metadata glossaryU.S. Geological Survey: Geospatial coordinates, points, polygons and data representation; checked November 2026.
  6. Census geocoding API documentationU.S. Census Bureau: February 2026 documentation defining address geocoding and interpolated coordinates; checked November 2026.
  7. Census research paper CES 25-13, classification metricsU.S. Census Bureau: February 2025 working paper, tables 2 and 3: confusion matrix, precision and recall formulas; checked November 2026.
  8. Stormwater discharges from municipal sourcesU.S. Environmental Protection Agency: MS4 definition and NPDES stormwater program context, updated May 20, 2026; checked November 2026.
  9. Stormwater utility fees, credits and exemptionsNew Jersey Department of Environmental Protection: Equivalent residential unit rate structures and local impervious-area reference values; checked November 2026.
  10. Dry detention ponds BMP fact sheetU.S. Environmental Protection Agency: December 2021 reference distinguishing temporary detention from a large permanent wet pool; checked November 2026.
  11. SPCC facility applicability questionsU.S. Environmental Protection Agency: Aboveground oil capacity greater than 1,320 gallons, exclusion of containers smaller than 55 gallons and other applicability conditions; checked November 2026.
  12. Aboveground storage tanksU.S. Environmental Protection Agency: AST and bulk storage container terminology, including the oil-filled equipment distinction; updated March 13, 2026, checked November 2026.
  13. Underground storage tank questionsU.S. Environmental Protection Agency: UST system definition includes connected underground piping and the 10 percent underground-volume test; checked November 2026.
  14. Federal Acquisition Regulation definitionsFederal Acquisition Regulatory Council: Federal solicitation, offer, invitation for bids and request for proposals terminology; checked November 2026.
Your next best move

Define the asset. Find the territory.

Tell us which physical assets count and where to search. Asset Search returns reviewed site decisions and dated evidence in the format your team uses.

Tell us what to find