Privacy choices

Choose what we may use.

The site works without optional tracking. Your choice is saved on this device and can be changed here anytime.

Necessary

Runs the site, protects forms, and remembers this privacy choice.

Always on

Territory monitoring

Asset Monitoring Service for Territory Changes in 2026

Keep a territory book current with reviewed changes tied to properties and owners. Choose a refresh schedule your team can act on, then measure the accounts and field hours it produces.

The short answer

Asset Search by PorchRocket provides an asset monitoring service that rechecks a territory for new installations, removed equipment and changed sites. Each change comes with dated evidence, a property location and owner information, with decision-maker contact where it applies. Start with a scoped pilot, then choose a monitoring subscription and cadence. Monthly or quarterly editions suit many territory decisions; near-real-time alerts depend on daily satellite coverage and evidence clear enough for the asset.

Watch my territory

What matters most

  • Asset Search returns fits, rejects with reasons, and unresolved sites with the field check needed to settle them.
  • Keep 2 image capture dates separate from the review date so a fresh report does not disguise old evidence.
  • Start Asset Search with quarterly territory planning or monthly sales follow-up, then test the cadence against the buyer's response window.
  • The worked model values 2 accounts at $17,350 in gross profit across 5 expected service years, before acquisition costs.
  • Asset Search offers subscription, per accepted result and success-based terms, with scope and pricing agreed by quote.

Say a competitor adds 40 commercial tank sets across your five-county territory in a year. At an assumed $1,735 in annual gross profit per account and five expected service years, winning just two of those accounts would produce $17,350 in account gross profit before acquisition costs. Being the first outside company to call gives you a chance to learn the site’s requirements and buying timetable while the installation is still a current subject.

The first call needs an address, a reason and someone responsible for the equipment. A new tank on a map gives you the address. Ownership research and a dated comparison make the call worth preparing. The account still has to qualify, including who owns the tank and when the customer can consider another supplier.

Asset Search by PorchRocket keeps watching a territory after the initial inventory. We look for the installations that give a service network a reason to call, along with removals that tell an operations manager to revisit the book, and return the changes with dated evidence that either team can check. The decision sets the schedule.

What does an asset monitoring service do?

An asset monitoring service compares dated observations of a defined territory and reports which physical sites changed, giving sales or operations a current queue to investigate.

A one-time inventory establishes the starting book. It tells you which assets were found, where they sit and what evidence supported each record. Monitoring adds a sequence: an asset appeared, an existing site expanded, equipment disappeared, or the latest view could not settle the question. Keep that history attached to the original site.

Keep the site identifier. If every quarterly file starts over with a fresh set of addresses, the sales manager has to reconcile it with the old proposals and field notes before anyone can tell which accounts deserve another call. Ask for the changes as a separate queue and retain the current inventory beside it.

I would also separate two types of discovery. A newly found site may have existed for years but been absent from your records. A newly installed asset needs dated evidence that brackets its appearance. Both can deserve a call, but only the second belongs in an installation trend. The aerial asset inventory guide explains how to build that first reference set.

For utility programs, this sits inside a larger asset management process. The EPA’s 2024 utility management primer measures inventory coverage separately from condition assessment coverage. That distinction gives the operations manager two jobs: update the location record, then assign any required equipment assessment to the appropriate field team.

If you need an initial commercial prospect list using standard visible features, Ground Control by PorchRocket offers self-serve searches for properties with storage tanks and buildings with rooftop HVAC. Use Asset Search for a custom definition or an ongoing watch. A propane marketer watching removals across several counties has a different job from ordering a first list of tank locations.

Changes worth watching in each industry

The most valuable monitoring events are physical changes that trigger a specific next action, such as qualifying a new service account or updating an inspection route.

Start with the action. An aftermarket director watching for equipment the dealers can support and a stormwater manager assigning the next inspection route can look at the same industrial district, yet need different definitions of a change worth reporting. Give each team its own acceptance rule.

Buyer Physical change to investigate Information to join Next action
Propane or fuel marketer New visible tank, additional tank or removed tank Parcel owner and separately verified tank ownership Qualify supply needs and the next buying date
Generator service network New enclosure, added equipment row or removed installation Facility contact and existing service territory Confirm equipment identity and service responsibility
HVAC aftermarket team Added rooftop units or a changed equipment layout Building owner and facility manager Ask about service coverage and equipment records
Stormwater program New basin, changed visible footprint or clearing around a pond Asset register and responsible property contact Update the inventory and assign a field review
Utility asset team Visible additions at an established site or a new equipment enclosure Internal asset identifier and project records Reconcile the site with the work order history
Site selection team Cleared parcel, new building or expanded paved area Parcel identity and ownership record Revisit the location against the approved prototype
Industrial service network Added dock positions or an expanded yard Occupier contact and account responsibility Qualify the operating change and required service

For tank campaigns, keep the landowner, equipment owner and fuel customer in separate fields. Michigan’s guide to selecting a propane provider distinguishes customer-owned tanks from tanks leased through a supplier. I would ask who owns the tank before assigning a fuel proposal. The propane tank location data guide develops the property-to-account research further.

A manufacturer watching competitor installations should record the physical addition first. Verify the supplier separately. If the only evidence for a competitor association is the color of an enclosure, I would hold that label until records or a conversation with the site contact establish whose equipment the dealer is being asked to service. For generator campaigns, use the standby generator inventory workflow to define which visible arrangements warrant investigation.

Stormwater teams should connect monitoring to their inspection program. The EPA’s pond and wetland management guidebook treats inspections, maintenance and documented findings as ongoing work. I would use a visible change to prioritize that work and record who will investigate it.

For contractors selling the resulting service to public owners, Bid Control by PorchRocket covers the purchasing side: public opportunities, bid documents and addenda. Keep that queue alongside the asset watch so an identified site can be connected to the agency’s buying process.

Which monitoring cadence fits the decision?

Choose quarterly editions for territory planning, monthly editions for active sales follow-up, and faster monitoring when a short decision window and suitable imagery justify it.

Test that choice in the pilot. A dealer manager who reallocates counties at a quarterly meeting can work from a different schedule than a salesperson who needs to reach the facility manager before the service arrangements for a new equipment row are settled. Ask when the next decision happens.

Cadence Decision it can support How I would use it What to settle in the scope
One-time Establish the initial inventory Build a baseline before assigning territories Evidence dates and unresolved sites
Annual Reset a slow-changing territory book Reconcile the book before annual planning Which changes would be too old to act on
Quarterly Adjust dealer coverage or inspection routes Review additions and removals together Capture coverage across the full territory
Monthly Feed an active account development queue Assign accepted changes to the sales team Who works each edition and by when
Weekly Follow a short construction or installation window Watch a focused set of high-priority sites Whether new evidence supports weekly decisions
Near real time Follow an event or fast-moving site Request alerts where daily satellite coverage exists Usable observations and review-to-delivery timing

A weekly review can revisit the evidence available that week. A weekly observation requires a new usable view. Put both in the scope. The USGS Landsat acquisition schedule illustrates the distinction: in 2026, Landsat 8 and 9 each operate on a 16-day cycle, offset by eight days. Satellite monitoring has a collection schedule before a sales team has a notification schedule.

For a planning calculation, assume equally spaced usable observations, a change equally likely to happen anywhere between them, and an installation that remains visible through the next observation. Average time from the change to its first observation is half the interval: 45 days for a 90-day interval, 15 for 30 days, and 3.5 for seven days. Add processing, review and delivery time to estimate when the salesperson receives it. A temporary installation that appears and disappears between observations needs a different watch schedule.

An event watch needs a coverage conversation of its own. NOAA explains that its emergency aerial surveys begin when weather permits and can encounter collection delays. For a storm response queue, specify the event date and which sites have a usable later observation. A report delivered quickly is valuable when its images answer the event question.

I would begin with one cadence. Reserve faster checks for the small group of sites where the sales manager can explain what an earlier report would change, whether that means getting a survey booked before vendor selection or arranging a visit before a planning meeting. Review those outcomes before widening the faster watch.

How fresh does the imagery need to be?

The newest usable image must be recent enough for the buying decision, and detailed enough to distinguish the asset from nearby objects.

Check the capture dates first. If a report arrives in November but its newest usable view was captured in March, the salesperson needs March beside the evidence before deciding how to introduce the change to a facility manager who has been looking at it for months. Keep the review and delivery dates in separate fields.

Spatial resolution describes image detail; temporal resolution describes how often an area is observed. The USGS remote sensing introduction explains those as separate properties. For an asset buyer, the implication is straightforward: ask to see whether the available views support your smallest qualifying asset, at the frequency your decision needs.

Public imagery programs show why the distinction matters. The USGS describes the National Agriculture Imagery Program as growing-season aerial acquisition with a refresh cycle of three years or less. That published schedule makes the capture date part of evaluating any particular view. Check it at the property under review.

Asset Search cross-references aerial and satellite views with property records and public datasets. Agree on which view establishes asset identity and which establishes a later change. The newer image must support the claimed change; a detailed older view cannot supply missing detail in a newer one.

Consider an empty equipment pad in a clear August view and a structure visible on it in October. Record the addition within that August-to-October interval. Confirm the installation or commissioning date from the site’s records if your campaign needs it. Use the observed interval to prioritize the call until then.

Test the difficult district too. Before accepting a monthly program, I would review samples from the busiest district and from the part of the territory with the weakest observations, then ask how much of each has usable comparisons inside the requested window. One excellent image cannot answer that question.

How are false changes removed?

Reliable change review checks image alignment and visibility before deciding whether a physical asset appeared, disappeared or changed within the agreed search rules.

An image difference is a candidate for review. The GLOBE Program’s change detection tutorial explains both seasonal differences and the need to align images for comparison. The buyer’s question comes afterward: does the observed difference satisfy the definition of a new tank, equipment row or cleared parcel?

Visibility needs its own check. USGS image quality documentation flags clouds, cloud shadows and snow among the conditions affecting image pixels. I would require a reviewer to account for those conditions before accepting a removal. A tank hidden in the later view stays unresolved until the evidence settles it.

Write acceptance rules using the assets your people recognize. For a tank watch, specify whether a second tank at an existing account counts as a separate change. For a generator watch, decide how to handle a portable enclosure appearing beside a building under construction. For a cleared-lot watch, define the amount and location of clearing that would reopen a site selection review.

We set those rules with the buyer’s experts, and people review every candidate before delivery. Asset Search reaches beyond directories to unlisted and newly built sites. The returned dispositions show the investigation’s answer.

  • Fits: the evidence satisfies the agreed rule, with the observed facts recorded.
  • Rejects: the candidate fails the rule, with the reason attached.
  • Unresolved: a specific field check remains before the answer can be settled.

Preserve the rejection reason. When a temporary storage container caused an earlier investigation, the next reviewer needs that decision beside the dated view so a later installation can be assessed against the site’s history without sending the sales team back to ask the same question.

I would test omissions as well as false positives. Give the pilot reviewer several dated installations your team already knows about, plus sites known to be unchanged. Ask which were recovered and which were missed, and why. Keep those test results separate from any broader accuracy claim. They tell you where to tighten the rules before paying to watch more territory.

What belongs in each change report?

A change report needs a stable site identity, dated before-and-after evidence, the observed difference and an assigned next action that survives import into the buyer’s records.

The person receiving the alert should be able to decide what to do without opening a second research project. Give the sales manager the site and responsible contact. Give the operations manager the asset identifier. Preserve the evidence for the person who later asks why the record changed.

Use the following as a requested delivery template. Agree on any fields specific to your CRM or asset register during scoping.

Field What it contains Why the receiving team needs it
Site identifier A persistent identifier for the physical location Keeps later editions attached to the same history
Asset or change identifier The item within a site that changed Separates two installations at one property
Location and parcel Address, coordinates and parcel reference Places the observation on the correct account
Earlier capture date Date of the comparison image Establishes the starting observation
Later capture date Date of the newer image Establishes the later observation
Observed change New, removed or altered, with a factual description Explains why the row was delivered
Review disposition Fits, rejects or unresolved Determines which queue receives the record
Owner and contact Property owner and decision-maker contact where applicable Starts qualification with the responsible people
Evidence and remaining check Dated views and the question still to settle Supports acceptance or a focused site visit
Buyer action fields Assigned employee, next step and due date Keeps the follow-up from disappearing in the inbox

We return CSV, Excel, GIS-ready files or an import for a CRM or dealer system. Ask the receiving employee to choose. A regional sales lead who assigns accounts in Excel and a utility analyst who joins location records to an existing map should each get a file they can work without rebuilding it after every edition arrives.

Specify the delivery rhythm separately from the alert threshold. I would put accepted changes in the working queue and leave rejected or unresolved investigations available in the accompanying history. Ask for each edition to distinguish a reviewed site with no qualifying change from a site awaiting a usable later observation. Those statuses answer different planning questions.

For an immediate alert, use a short factual subject such as: “New equipment enclosure observed at site 027; September and October views attached.” Then state the observed difference and the assigned employee. Save the longer evidence record with the site. The new-installation change detection guide covers the comparison that should sit behind that message.

Software, sensors, or a managed monitoring service?

Choose Asset Search for discovering visible changes across a territory, equipment monitoring for operational readings, and asset management software for organizing the records and work that follow.

These choices start with different questions. A territory sales manager asks which properties added equipment. A maintenance manager asks what the equipment is doing. The U.S. Department of Energy’s operations and maintenance guide describes vibration analysis among equipment condition assessment techniques. That work uses equipment evidence suited to the maintenance question.

Put employee time on the buying sheet. When comparing physical asset monitoring software with a managed service, assign someone to the whole internal workflow, from acquiring suitable views through reviewing uncertain changes and joining the property record to handing an accepted result to the employee who will act. Budget that person’s hours.

With Asset Search, you receive the reviewed investigation. The buyer supplies the asset definition and decides what to do with the result. No imagery purchase or analyst hiring is required to start. A manufacturer with a national dealer footprint can ask for a defined equipment watch and receive files its territory managers can use.

An internal workflow is worth considering when a staffed geospatial team already performs the required comparisons and needs direct control of the analysis. Device-based monitoring fits when operational readings drive the action. I would still require one site identifier across the records so an installation discovery can later be linked to the equipment’s service history.

For aftermarket planning, connect that history to installed-base mapping. Record where equipment is installed, how the territory is covered and which sites have changed since the previous edition. The dealer manager can then review coverage against the current book.

How do asset monitoring fees work?

Asset Search scopes ongoing monitoring as a subscription, with per accepted result or success-based terms available when the buyer’s acceptance process or outcome supports them.

In 2026, the quote should define the territory and asset class, required evidence, cadence and delivered format. A county tank watch and a national search for small rooftop equipment need different scopes. Most buyers start with a small paid pilot credited toward the full order.

Fee model Buyer situation it fits Definition to settle before starting
Subscription A continuing sales territory or operations inventory Area watched, cadence, editions and review coverage
Per accepted change A team buying qualifying additions to its account queue What counts as acceptance and how repeat observations are handled
Per completed investigation A fixed set of locations needing an answer Required evidence and how unresolved results are returned
Success-based terms A buyer and provider agreeing on a measurable outcome Outcome, attribution window and records that establish it

I would choose a subscription for the five-county territory in the opening. The buyer wants continuing coverage, including periods with few changes, and a history that stays current. Per accepted change fits when the buyer has a disciplined acceptance process and mainly wants additions that meet a narrow sales definition.

Settle the counting unit. If two tanks appear on one parcel and both remain visible in the following edition, the acceptance rules should tell the buyer whether the original find counts as one site or two assets, and how the repeated observation links to that find. A later removal gets its own dated event.

For success-based terms, define the commercial record that establishes the outcome and how existing opportunities are treated. The same lead should not receive new credit because it appears in another edition. Your sales manager needs a clear way to identify accounts already under discussion when monitoring begins.

Keep quote comparison tied to the work delivered. Ask whether the baseline investigation is included, how the pilot credit applies, and what happens when you add a county or change the asset specification. Those answers let you compare the annual program with the value of the decisions it supports.

The value of reaching a new installation first

In the 40-installation model, two signed accounts produce $17,350 in gross profit across five expected service years, giving the owner a basis for evaluating monitoring spend.

Use customer lifetime value, or CLV, to value the account relationship: annual account gross profit multiplied by expected paying years. For the tank territory, assume annual account revenue of $10,840 and direct costs of $9,105. Those costs include delivered product, service labor and route time. Annual gross profit is $10,840 minus $9,105, or $1,735.

Five expected paying years gives $1,735 x 5 = $8,675 per signed account. Hold annual revenue and direct costs flat, with no separate equipment purchase or installation expense charged to acquisition. The five-year expectation incorporates account retention; gross profit is undiscounted. Use your own retention history to set expected years and your delivered costs to set the margin. The customer lifetime value calculator lets you compare those inputs before choosing a territory budget.

Build the sales funnel from 40 accepted installation changes at 40 distinct prospective accounts, excluding current customers and duplicate events:

Stage Annual count Assumed conversion from the preceding stage
Changed sites assigned for outreach 40 Starting queue
Substantive conversations 16 40% of assigned sites
Qualified site reviews and proposals 8 50% of conversations
Signed accounts 2 25% of proposals, or 5% of the starting queue

Qualification includes equipment ownership and the customer’s buying timetable. The eight proposals go to accounts that can consider the offer. The team works the other records toward a dated next step or closes them out. First contact earns no account value by itself.

Budget the team’s time as well. Allow 24 minutes of research and outreach for each of 40 sites: 16 hours at a loaded office rate of $45, or $720. Allow eight combined site reviews and proposals at 2.5 hours each: 20 hours at a loaded field-and-vehicle rate of $67, or $1,340. Add four hours of administration at $45, or $180.

That is 40 staff hours and $2,240 in follow-up cost. Two accounts produce $17,350 in lifetime gross profit; subtracting $2,240 leaves $15,110 before monitoring spend. Call that spend Q: pilot payments plus the remaining baseline charge and first-year subscription charges after applying the pilot credit. Count each payment once. Attribute the stated follow-up budget entirely to these accounts, with no other acquisition spending in this model. Then calculate:

  • Acquisition cost per signed account = (Q + $2,240) / 2.
  • Account-cohort ROI = ($17,350 - Q - $2,240) / (Q + $2,240).
  • CAC payback months = acquisition cost per account / ($1,735 / 12).

The payback calculation assumes gross profit arrives evenly through the year. For seasonal fuel accounts, use the expected delivery-month gross profit to find when cumulative profit covers acquisition spend.

The ROI follows the accounts acquired from one year’s monitoring across their expected service lives. Assess later spending against the accounts and operating benefits it supports. Keep the first-year acquisition worksheet intact so subsequent subscriptions do not disappear from the budget.

For a project-only buyer, replace the five-year account value with project gross profit. Entering $18,400 of job revenue and $13,180 of direct costs gives $5,220 for one basin maintenance project. Carry only the work you have priced into that version of the worksheet; a future maintenance agreement gets its own retention assumptions.

Low, base, and high returns on the same territory

The same 40-site queue produces very different returns at one, two or three signed accounts, so test conversion before expanding the monitoring area.

Keep the model’s five-year account value and 40 staff hours fixed, including the same eight proposals in each outcome. One, two or three wins imply proposal conversion of 12.5%, 25% or 37.5%. Assume the previous annual-book approach wins one account with the same follow-up budget and no monitoring expense. The table separates all acquired account value from the additional value associated with the changed-site approach.

Outcome Signed accounts Share of 40 sites Lifetime account gross profit After $2,240 follow-up, before monitoring Additional gross profit versus one account
Low 1 2.5% $8,675 $6,435 $0
Base 2 5% $17,350 $15,110 $8,675
High 3 7.5% $26,025 $23,785 $17,350

In the base case, the same 40 hours sign twice as many accounts. The additional account contributes $8,675 over its expected life before incremental acquisition spending. With follow-up costs equal, incremental ROI is ($8,675 - Q) / Q. Positive incremental ROI requires Q below $8,675; at equality, the program breaks even. This compares monitoring with the existing approach, while the account-cohort formula measures the full acquired group.

Date the report and the proposal. To judge whether earlier discovery helped, the sales manager needs to follow the accepted change through the first substantive conversation and the site visit, then see whether the proposal reached the owner before the buying decision was made. Record calls to the wrong office as wasted time.

My decision rule is to expand only when the expected additional gross profit exceeds the additional monitoring and follow-up costs, with room for the low case. If the team works changes late, repair the follow-up process first. If timely calls produce few qualified accounts, adjust the asset definition or the offer.

Route density belongs in that decision. If new accounts require longer runs, replace the assumed direct costs with the route’s costs before approving the next county. Use the route density calculator to work through the travel inputs. Keep the service department’s margin in the worksheet alongside the sales team’s conversion rate.

How to start territory monitoring in 30 days

Start with one territory and one decision, then use an eight-step pilot process to test the evidence, delivery format and follow-up work before expanding.

This is the buyer’s launch schedule. Agree on the pilot’s delivery date in the scope so the observation requirements and the team’s review calendar fit together.

  1. Days 1 and 2: write the buying decision. Choose a specific result, such as qualifying new commercial tank installations within the current delivery area. Name the employee who will accept the changes and the employee who will work the accounts. Give them a decision deadline.
  2. Days 3 and 4: draw the territory and define the asset. Mark the counties or boundary, include existing accounts, and list examples that count or fail. Decide whether an added tank at an existing site is a new event. Include the edge cases your field team encounters.
  3. Day 5: request an Asset Search monitoring pilot. Use the two-minute territory monitoring request to tell us what to find and where. Request dated comparisons, parcel and owner information, reviewed dispositions and your preferred file format. Ask for the pilot credit and subscription scope in the quote.
  4. Days 6 to 10: agree on the observation and acceptance rules. Set the cadence against the available evidence. Define how new installations differ from newly discovered older sites. Specify the unresolved field check, the unit being counted and how unchanged or obscured sites appear in each edition.
  5. Days 11 to 15: review the agreed pilot delivery. Compare the results with known installations and unchanged sites supplied by your team. Inspect the difficult cases with the person who knows the equipment. Record corrections against the site identifier, then settle the definitions before the next edition.
  6. Days 16 to 20: load the file and assign follow-up. Import the accepted changes into the CRM or dealer system. Preserve the investigation history. Give every accepted site an employee and a next step; send unresolved records to the person who can settle the stated question.
  7. Days 21 to 25: work the first queue. Start with the observed change, confirm who handles the equipment, and ask about the buying timetable. Log conversations, qualified reviews and proposals. Record hours spent so the acquisition worksheet includes the team’s time.
  8. Days 26 to 30: choose the continuing cadence. Review evidence coverage and how quickly employees acted. Reconcile the quote with the account-value model. Approve the subscription scope that the team can work, and set the date for the first renewal review.

For the first call, I would use a short script: “We are updating our service coverage around your property. Who handles the tank equipment and fuel supply arrangements there?” Follow with a question about the next review date. That gives the contact room to explain the arrangement before you propose a visit.

Save the answer beside the site record. A contact who expects to review supply next spring should enter a spring follow-up queue, while a site that needs a proposal now goes to the salesperson this week. Let those dates drive the team’s calendar.

When to change the rules or expand the watch

Revisit the asset definition when the buyer’s service capability changes, and expand the territory after two successive editions show that the team can work the accepted changes.

Check the queue at both reviews. I would want the receiving manager to show that employees worked the accepted changes on time and that unresolved records reached someone able to settle them before adding counties that send more work to those same people. Name the next county’s account owner first.

We can re-answer previously searched sites when a new specification, building prototype or repair method changes what qualifies. Existing dated evidence can often answer the revised question without waiting for another image. Record that as a rule change with a review date. Preserve the original capture dates.

For example, an aftermarket team may widen the equipment arrangements its dealers support. Recheck rejected sites against the new definition before buying another territory. A site selection team may revise its prototype and need a different answer from parcels already investigated. Keep both decisions in the site history.

Separate that reclassification from physical change. A property can qualify today because the buyer changed its rules even though nothing visible changed on the ground. Sales may want the account either way; the territory trend should identify the reason it entered the queue.

At renewal, review accepted changes worked, proposals generated and account gross profit alongside observation coverage. I would reduce an unworked queue before raising the cadence. Expand the county boundary when the sales manager can name who will own the next batch of accounts.

Asset Search is the fastest way to start a managed territory watch: submit the asset and area in a two-minute form, then agree on a scope and quote. We establish the search rules with your experts and review candidates using aerial and satellite imagery cross-referenced with property and public records. A monitoring subscription delivers changed sites with before-and-after dates and owner information. Choose quarterly or monthly editions for territory work, or near-real-time alerts where daily satellite coverage supports the question.

For a tank marketer, dealer network or infrastructure program, the scoped delivery gives the receiving team six things to work with:

  • Locations and parcels for the assets that meet the search definition, from one county to the contiguous United States.
  • Dated evidence showing new installations, removals or visible alterations at the watched sites.
  • Owner information, with decision-maker contact where it applies to the investigation.
  • Fits, rejects with reasons, and unresolved sites with the field check that settles the answer.
  • CSV, Excel, GIS-ready files or an import shaped for the CRM or dealer system receiving the work.
  • Continuing refresh editions and revised answers when the buyer changes the qualifying rules.

Start with a small paid pilot credited toward the full order. Put the territory manager and the equipment expert on the same review, choose the cadence their team can act on, and keep the account-value worksheet beside the quote. The first edition should leave the salesperson with a defined set of calls and the operations manager with records ready to update.

Give your team the changed sites, the evidence and the next owner conversation while the work is still worth pursuing.

Questions people ask

Quick answers

What is the best asset monitoring service for a sales territory?

Choose Asset Search when you need reviewed physical changes tied to properties and owners, delivered for your sales team to work. Define the assets, territory, evidence requirements and response window first. A monthly or quarterly subscription can keep the book current, while a pilot tests whether the reported changes produce qualified conversations.

How much does an asset monitoring service cost in 2026?

Asset Search is quoted for the territory, asset definition, evidence requirements and refresh cadence. Ongoing monitoring fits a subscription; per accepted result or success-based terms can suit other buying arrangements. Most buyers start with a small paid pilot credited toward the full order. Compare the quote with incremental account gross profit and your follow-up costs.

Can satellite asset monitoring find a new tank or generator?

Yes, when the available imagery resolves the asset clearly enough and a comparable earlier view establishes the change. Asset Search reviews candidates and returns dated evidence. A new visible enclosure can prompt a generator investigation; the site contact or a field check settles any remaining identification question.

Can I monitor competitor installations?

Yes, you can watch a territory for physical additions and then establish the operator or supplier through records and follow-up. Keep a competitor association separate from the visible change until it is supported. For tanks, confirm equipment ownership and the customer's service arrangements before treating a new address as an account you can pursue.

Is remote site monitoring available in real time?

Near-real-time alerts are available where daily satellite coverage exists and the evidence supports the asset question. Collection opportunities, usable observations and delivery times are separate parts of the schedule. Agree on those terms for the territory, along with how obscured sites and gaps will appear in the reports.

How is imagery monitoring different from physical asset monitoring software?

Imagery monitoring finds visible changes across sites and territories. Device-based monitoring supplies readings from equipment, while asset management software organizes the records your team maintains. Choose according to the decision: discovering new installations, following equipment readings, or managing work against known assets. A service network can use all of these together.

What happens when a reported change cannot be confirmed?

An unresolved Asset Search result identifies the field check needed to settle the question. A rejected candidate carries its reason. Preserve both in the investigation history, and keep them separate from accepted changes in the sales queue. That gives the next reviewer the evidence and prevents the same uncertainty from being counted repeatedly.

Where does Asset Search provide monitoring?

The contiguous United States is the standard coverage area, from one county to a national territory. Other regions are available on request. The monitoring scope sets the asset definition and cadence for the area, and the pilot establishes whether the available dated views support the decision you want to make.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. USGS introduction to remote sensing resolutionU.S. Geological Survey: Distinguishes spatial resolution from temporal resolution; checked November 2026.
  2. Landsat acquisition schedulesU.S. Geological Survey: Landsat 8 and 9 each have a 16-day cycle with an 8-day offset; checked November 2026.
  3. National Agriculture Imagery Program archive descriptionU.S. Geological Survey: Public aerial imagery example with growing-season acquisition and a refresh cycle of three years or less; checked November 2026.
  4. Landsat Collection 2 quality assessment bandsU.S. Geological Survey: Documents image quality flags including clouds, cloud shadows and snow; checked November 2026.
  5. Change Detection TutorialThe GLOBE Program: Explains seasonal image differences and aligning images for comparison, pages 2 and 13; checked November 2026.
  6. NOAA emergency response imageryNational Oceanic and Atmospheric Administration: Explains weather-dependent aerial collection and before-and-after imagery for disaster response; checked November 2026.
  7. Effective Utility Management, 2024 primerU.S. Environmental Protection Agency: Distinguishes inventory coverage from condition assessment coverage, page 42; checked November 2026.
  8. Stormwater Wet Pond and Wetland Management GuidebookU.S. Environmental Protection Agency: Section 2 covers inspection, maintenance and documentation; checked November 2026.
  9. Operations and Maintenance Best Practices GuideU.S. Department of Energy: Chapter 6 describes equipment condition assessment using techniques including vibration analysis; checked November 2026.
  10. Selecting a propane providerMichigan Public Service Commission: Explains customer-owned and supplier-leased tanks and the distinction when changing providers; checked November 2026.
Your next best move

Get the changes your territory team can act on.

Tell us what to find and where. Get a scope and quote for a paid pilot credited toward the full order, then keep the territory current with a monitoring subscription.

Watch my territory