Tennis Court Resurfacing Leads for HOA and Property Accounts
Find properties with outdoor courts, reach the person responsible for the budget, and sell a resurfacing scope the owner can approve. Follow a 30-day prospecting plan with the cost of winning an account worked out.
Find tennis court resurfacing leads by selecting properties with visible outdoor courts, then confirming the surface, last resurfacing date and budget owner. Ground Control by PorchRocket supplies matching commercial properties for $10 to $20 per building, delivered within 48 hours after payment, with credit back for wrong matches within 30 days. Start with HOAs, apartments and clubs; qualify pickleball conversions separately, and use Bid Control for school and park projects.
What matters most
- SportMaster's published guidance puts hard acrylic court resurfacing on a 4-to-8-year cycle, subject to use and maintenance.
- Ground Control costs $10 to $20 per commercial building, with owner and decision-maker research available as add-ons.
- The four-court model produces $21,488 in gross profit from a $63,200 resurfacing project before acquisition costs.
- USA Pickleball's 2026 rulebook distinguishes a 20-by-44-foot court from its larger surrounding playing surface.
- Two signed projects from the 120-property campaign produce $36,702 after its $6,274 acquisition budget.
Say a four-court HOA complex outside Charlotte pays $15,800 per court for resurfacing. That is a $63,200 project. At an assumed 34% gross margin, the job contributes $21,488 before selling costs and company overhead. A second resurfacing six years later at the same price and margin brings that address to $126,400 in revenue across two projects.
The sales problem is finding that address early enough to get into the owner’s budget. If one manager is still searching for maintenance records while another has last year’s repair map and a board meeting next month, the second account deserves your estimating time first, even when both complexes have four courts. Their buying schedules are different.
Ground Control by PorchRocket finds properties with visible outdoor courts so you can begin with the installed courts in your territory. Start with the surface and buying schedule, then decide whether tennis resurfacing, basketball work or a pickleball conversion belongs in the proposal.
How often do outdoor courts need resurfacing?
Hard acrylic tennis surfaces generally belong on a 4-to-8-year planning cycle, with the next job determined by maintenance records and inspection.
That interval comes from SportMaster’s resurfacing guidance, which ties timing to usage and maintenance. Apply it to the acrylic surface. Record the age of the underlying pavement separately. A coating date and a pavement construction date answer different estimating questions.
I would ask for the last invoice before asking whether the owner wants a price, because the date means little until you know which courts were included and whether the work covered the whole enclosure or only a small repair. Read the scope. A line-painting invoice should not restart your resurfacing clock.
Set a next-contact date for each property. For a recently coated court, request permission to check back before its next budget review. For a court approaching its planned renewal year, offer an inspection with a written repair scope. For an unknown history, start by collecting records and arranging access.
Give each account a stage. Otherwise, the sales file fills with repeated calls asking the same question. Record the owner’s answer in plain language: resurfaced in 2023 and discussing funding for 2028, or manager still searching for invoices.
Ask when to return to the subject. If the owner says the courts were resurfaced last year and the board will revisit them in four years, record that date and use the intervening calls to confirm responsibility when management changes. Save the truck visit.
Court resurfacing costs in 2026
SportMaster’s published planning range is $12,000 to $20,000 per tennis court, while a contractor’s quote needs measured quantities and a defined repair scope.
The manufacturer’s cost FAQ identifies drainage and pavement repairs among the issues that affect the price. Four courts at its published endpoints imply $48,000 to $80,000 by multiplication. That calculation does not account for shared mobilization or differences among the four surfaces.
For estimating, I would divide the job this way:
| Scope line | Quantity to establish | Decision the price should settle |
|---|---|---|
| Cleaning and preparation | Area and observed surface condition | What must happen before coating |
| Crack treatment | Measured repair lengths and selected method | Which repairs the base price includes |
| Low-spot work | Mapped repair areas and depth assessment | Which corrections receive a separate allowance |
| Resurfacing and color | Coated area and specified system | Number of applications and selected finish |
| Game lines | Approved layout for each court | Tennis only, basketball or shared use |
| Access and mobilization | Crew visits and equipment access | Cost of one closure versus phased work |
Give the buyer a total. Retain the quantities behind it so that, when the owner adds pickleball lines or asks to keep half the complex open, you can identify which crew visits change and put a price against the revised work. Price conversion work separately.
Carry travel and return visits in the direct job cost. Count the loading time too. An estimate that pays the crew only for hours holding a squeegee leaves the owner covering the hours spent loading material, reaching the site and returning for the next application out of the margin they thought they had. Confirm water and staging arrangements before pricing.
For a basketball court resurfacing business, use the same estimating discipline with the owner’s required layout. A tennis package price gives you no shortcut around measuring that enclosure. Bring the selected striping plan to the approval meeting and have the owner identify the version being purchased.
The ten-year value of a four-court HOA
The four-court model produces $21,488 in gross profit on its first project and $32,232 in expected project gross profit over ten years.
Here are the assumptions behind that account value. Each resurfacing costs the owner $63,200. Direct costs consume 66%, including installed materials and labor plus equipment and job travel. The first project occurs in year one; the next is considered in year seven. Prices and margins stay flat, and this simple model does not discount future money.
Customer lifetime value, or CLV, is the gross profit expected from an account over the period you choose. Keep project years visible. For resurfacing, add the first job to the probability-weighted value of later work; multiplying the initial contract by ten would treat a court that needs renewal once in that period as though you resurface it every year.
| Account calculation | Arithmetic | Result |
|---|---|---|
| First project revenue | 4 courts × $15,800 | $63,200 |
| Direct project cost | $63,200 × 66% | $41,712 |
| First project gross profit | $63,200 minus $41,712 | $21,488 |
| Second project contribution, assuming a 50% chance of winning it | $21,488 × 50% | $10,744 |
| Ten-year expected project gross profit | $21,488 + $10,744 | $32,232 |
If both projects are signed and delivered at those margins, their combined gross profit is $42,976. The probability-weighted figure is smaller because the second contract still has to be earned. Neither calculation includes annual cleaning income or a conversion sale.
I would use the first project’s margin to set the acquisition budget. Later work must be earned. Store the approved colors and repair map with the closing documents so that, when a new manager asks what was done six years earlier, the next proposal can begin with the job record instead of another search for invoices.
The contractor customer lifetime value calculator can help compare account assumptions. For this trade, keep the project timing visible beside the total.
Where pickleball conversion demand comes from
SFIA’s 2026 report counts 24.3 million Americans playing pickleball in 2025, giving court contractors a reason to ask owners about local demand.
The Sports & Fitness Industry Association’s June 2026 release also reports 7.5 million core participants, defined as people who played at least eight times during the year. Those are participation measures for 2025, published in 2026. They are not counts of funded court projects.
My next question would be what the property itself is seeing. Ask for reservation records. Before recommending a conversion to an apartment manager or an HOA board, find out whether residents have asked for pickleball and whether the people approving the work want to preserve tennis at the same location. Record the decision date.
Start with the least disruptive option the owner wants evaluated. That might be retaining tennis with an added layout and portable equipment. A dedicated conversion deserves its own plan, including the removal or relocation of existing equipment where required. Price each approved option separately.
Ask what can be approved now. If the HOA has authorized a resurfacing budget but is still collecting resident opinions about court use, prepare a tennis renewal scope that can proceed while the board considers the conversion as a separate decision. The conversion stays in its own proposal.
For a prospect file, use separate fields for resurfacing interest and conversion interest. One property can have an approved maintenance budget and an unapproved sport-change proposal. Keeping both under a single opportunity value makes the forecast hard to trust.
Tennis-to-pickleball conversion needs a layout first
USA Pickleball’s 2026 rulebook specifies a 20-by-44-foot court and a minimum 30-by-60-foot playing surface, so lines alone do not establish fit.
Sections 3.A.1 and 3.A.3 of the 2026 official rulebook establish those dimensions and recommend 34 by 64 feet for new construction. Distinguish the boundary lines from the surrounding playing surface when discussing how many courts fit. Measure the available space before giving the owner a court count.
Walk the proposed layout with the owner. Mark the existing net posts and gates, then trace how players would enter and reach each court while the other courts are occupied, including the activities the owner wants to keep available during shared use. Measure the enclosure before finalizing that drawing.
I would ask about sound before presenting a dedicated conversion. Mark neighboring homes on the site plan and ask the owner about existing complaints. Where sound is an unresolved approval issue, have the owner obtain a site-specific acoustic review and carry its scope into the budget.
Fence changes can affect the conversion estimate. If that work sits outside your crew’s service, coordinate a separate quote; the commercial fencing prospecting guide explains the adjoining account opportunity. Keep responsibility for gates and equipment clear in the proposal.
The first sale can be a measured conversion plan with a resurfacing option attached. Put the drawing beside the quoted scope and identify the decisions still needed. Wait for an approved layout before ordering the materials tied to it.
Who owns the courts and approves the budget?
For HOA and apartment court work, identify the party responsible for the court parcel and confirm who can authorize the proposed capital expense.
I would build the contact map below before scheduling an estimate. Treat the titles as starting points to verify with each property.
| Property | First person to ask for | Approval question | Record to request |
|---|---|---|---|
| HOA recreation complex | Community manager or board contact | Who approves resurfacing and any change of use? | Court budget line and last project invoice |
| Apartment property | Property manager | Does this expense go to an owner or asset manager? | Capital request schedule |
| Private club | Facility manager or general manager | Who approves the closure and project spend? | Maintenance history and activity calendar |
| School | Facilities department | Which procurement process covers this project? | Published solicitation or planned project scope |
| Public park | Parks department and procurement office | Where will the request be advertised? | Capital plan and purchasing notice |
| Private home | Owner | Who approves access and the final scope? | Previous coating and repair records |
A management office address is a contact location. Separate it from the job address. When one manager handles several communities, give each court site its own record under the shared contact, with the entity responsible for that site attached to its proposal so the contract goes to the right signer.
The multifamily service account guide covers that portfolio approach. For court work, ask for the next property only after you have a scope or inspection the manager can evaluate. Do not price five sites from the condition of the first one.
There is also a shared buying conversation with pool service prospects. Ask who coordinates the recreation budget when the property has both amenities. Keep the court proposal focused on the work your crew delivers, with the correct owner attached to it.
Finding outdoor courts near your crew
Ground Control can select commercial properties and homes with visible sport courts in your chosen area, giving the sales team addresses to qualify.
Start with a territory your estimator can cover between current jobs. I would draw the first boundary around an afternoon survey route, then expand after the team has worked the initial accounts. Use travel time from your yard when choosing that boundary.
For commercial prospecting, begin with multifamily properties and other relevant property types, then select visible sport courts. For home courts, use the residential options. Gather court counts and surface details during your own review and site qualification; enter them beside the property record.
Give standalone HOA recreation parcels special attention. If your territory request needs those parcels, club-specific research or a custom classification, describe the requirement through Ground Control’s custom request option. Include what counts as a suitable property and the geography you want covered.
Use public property records to check the parcel against the court location. Then confirm responsibility by phone. If a court sits between an apartment property and an HOA recreation area, ask the contact to identify which organization operates that enclosure before you put either organization’s name on an inspection request or a proposal.
The broader territory method in the building-product market data guide starts with installed assets and the accounts responsible for them. Apply it within one service radius. Expand when the team has qualified the first territory.
Keep your territory sheet small enough to work. Each row should carry an address, responsible contact, last known resurfacing date and next action. Add scope observations after inspection. A hundred blank follow-up dates tell you the team needs time on the phone before it needs another hundred properties.
What is the fastest way to build a court prospect list?
Ground Control by PorchRocket is the fastest way to build a court prospect list by visible outdoor courts and service area. Choose relevant commercial property types and the sport-court filter. Prices are $10 to $20 per commercial building, with orders starting at 10 buildings and delivery within 48 hours after payment. Every property includes why it matched; wrong matches receive credit back within 30 days. Owner information and decision-maker research are separately priced add-ons. These are target properties whose owners have not asked for a quote; your team starts the conversation and qualifies the resurfacing opportunity.
Home data costs $0.72 to $1.20 per home, with the exact price shown before payment. Choose the market that matches your crew’s work in Ground Control’s property search. A residential court campaign and an apartment capital-project campaign need different contact lists and follow-up schedules.
For adjoining amenity work, properties with pools and commercial grounds lists provide other starting points. Add those filters only when they serve a defined offer. The court itself should remain the reason this prospect belongs in the resurfacing campaign.
A 30-day playbook: 8 steps to court resurfacing leads
Work one territory through eight steps over 30 days, ending with inspected opportunities and dated budget follow-ups instead of a larger unworked list.
- Days 1 and 2: define the job. Write down your surface systems, smallest profitable project and travel boundary. Decide whether this campaign sells resurfacing, shared-use lines or conversion planning. Give the estimator one qualification sheet for that offer.
- Days 3 and 4: pull the properties. Order commercial properties with visible sport courts in Ground Control for $10 to $20 per building, with delivery within 48 hours after payment. Select the area and property types; request contact research where needed.
- Days 5 through 7: establish the account. Match the court location to its owner or manager. Remove duplicates before assigning calls. Keep separate site records when one contact represents several complexes, and record who has authority to approve an inspection.
- Days 8 through 12: ask about timing. Request the last resurfacing date and next budget discussion. Ask whether tennis stays and whether pickleball is being considered. Give every conversation a next action, including a future callback when the project belongs to another budget year.
- Days 13 through 17: inspect qualified sites. Measure the work area and document repair needs. Confirm access and the requested layout. Leave with enough information to price the scope or identify the additional evaluation needed before quoting.
- Days 18 through 21: prepare the decision. Send a base resurfacing scope and separately priced options. Include the repair quantities and proposed closure sequence. Ask the contact to confirm which approval meeting will receive the proposal.
- Days 22 through 26: resolve the open items. Follow up on scope questions and missing approvals. Arrange any requested board presentation. If the project is postponed, record the reason and the date it returns to the agenda.
- Days 27 through 30: review the spend. Count conversations, inspected sites, proposals and signed jobs. Enter selling hours and research costs. Reorder after the signed-work margin supports another batch; otherwise fix the stage where prospects stopped moving.
Assign the next-action column to one person. If the estimator owns both measurements and every callback, cap the survey schedule at the number of proposals that person can deliver before the managers’ budget deadlines, even when there are more owners willing to arrange visits. Finish the estimates already promised.
Selling an HOA board a fundable scope
An HOA resurfacing proposal should connect the inspected work to the association’s responsibility, funding schedule and next approval meeting.
The Community Associations Institute’s explanation of reserve study standards describes component planning around association responsibility, reasonably anticipated expenses and estimated project costs. Ask for the court’s current budget entry and provide a scope the board can compare with it. Let the association’s advisers handle its funding decisions.
I would put a one-page decision sheet in front of the detailed estimate. Name the courts included. Give board members the inspected scope and its total, with the proposed closure sequence beside any options they must vote on, so someone who missed the survey can understand the purchase without reconstructing it from several emails. Attach the proposed layout.
For the four-court model, the decision sheet starts with $63,200 for the agreed resurfacing scope. A shared-use line option gets a separate amount after measurement and layout approval. A dedicated conversion gets a separate scope. The board can select the work it has authority and money to approve.
Get the meeting date. Work backward from the manager’s document deadline and leave time to answer questions before the packet goes out. If a revised closure sequence changes mobilization costs, update the total before the board receives it.
Weather affects the installation schedule. SportMaster’s Acrylic Resurfacer data sheet requires air and surface temperatures above 50°F during application and for at least 24 hours afterward. It also directs installers not to apply when rain is forecast or imminent. Build the schedule around the selected system’s instructions and state how a weather delay will be communicated.
Send the property manager a revised decision sheet when the scope changes. Keep the superseded estimate in your records, with the revision date visible on the version going to the board.
A property manager call that leads to a survey
Ask the property manager for the resurfacing history and approval schedule, then offer an inspection tied to the next budget decision.
Here is a suggested opening for a call, adapted to the court location you have verified:
Our crew handles outdoor court resurfacing in this area. Who coordinates the budget for your courts, and when were they last resurfaced? We can prepare a measured repair scope for the next funding discussion, including a separate pickleball option if that is on the agenda.
Let the manager answer. When there is an incumbent contractor, ask whether the property needs another budget proposal or backup capacity before offering a visit that would take your estimator away from an account already preparing to choose a contractor. If the answer is no, request a suitable callback date. Move to the next account.
Before agreeing to a survey, establish what happens afterward. Who will review the estimate? Ask whether a funding decision is expected this year, and agree on what the visit will produce: a measured repair scope for that decision or a more detailed investigation that needs its own scope and fee. Put the deliverable in writing.
Keep related work organized. If your business also handles parking lot striping accounts, ask about that budget separately. The same manager can need both services, but court layout approval and parking work should each have their own quantities and acceptance criteria.
Track the language the manager uses. A request for a price before Thursday’s meeting needs a different response from a request to check back next spring. Put the promised deliverable and due date in the record before making the next call.
What does a targeted court list return?
Two signed four-court projects leave $36,702 in gross profit after a $6,274 acquisition budget, converting about 1.67% of contacted accounts into customers.
Continue the four-court account model with 120 properties representing 120 distinct buying accounts, at an assumed $16 per property within Ground Control’s published commercial range. Each signed account buys one $63,200 project at the same 34% gross margin. Add a $480 research allowance, with contact add-ons priced at checkout. Budget 26 outreach hours at $41, twelve surveys at 1.75 hours and $72 per hour, and eight proposals at 2.25 hours and $72 per hour. The hourly assumptions include the employer’s labor cost. Assume no other campaign expenses; include any paid advertising or additional selling time when adapting this budget.
Acquisition spend is $1,920 + $480 + $1,066 + $1,512 + $1,296 = $6,274. Survey time includes travel. The campaign uses 65 sales hours.
Assume outreach reaches all 120 accounts and produces 30 conversations, a 25% conversation rate. Twelve conversations become surveys, a 40% rate; eight surveys become proposals, a two-thirds rate. At a 25% proposal close rate, two projects sign. Customer acquisition cost, or CAC, is total acquisition spend divided by customers won: $6,274 / 2 = $3,137.
Lead-list ROI is (project gross profit minus acquisition spend) / acquisition spend. Count the first projects here and hold the $6,274 campaign budget fixed. The low and high cases change only the signed-job count, with the same project value and margin. ROI percentages are rounded to the nearest whole percent:
| Outcome | Signed projects | Project gross profit | Gross profit after acquisition | ROI |
|---|---|---|---|---|
| Low | 1 | $21,488 | $15,214 | 242% |
| Base | 2 | $42,976 | $36,702 | 585% |
| High | 3 | $64,464 | $58,190 | 927% |
Compare the same 65 hours with a broad-list campaign that requires 45.5 hours of screening and outreach. Assume it produces six surveys and four proposals, with the same time per survey and proposal as the court-targeted campaign. Both campaigns close 25% of proposals. The comparison allocates time; the acquisition budget above belongs to the court-targeted campaign.
| Use of the same sales time | Broad-list allocation | Court-targeted allocation |
|---|---|---|
| Account screening and outreach | 45.5 hours | 26 hours |
| Surveys, including travel | 10.5 hours for 6 | 21 hours for 12 |
| Proposals | 9 hours for 4 | 18 hours for 8 |
| Total hours | 65 | 65 |
| Signed projects at 25% of proposals | 1 | 2 |
The extra production comes from moving hours into qualified surveys and proposals. The closing assumption stays the same. Replace these stage counts with your own campaign records in the lead-list ROI calculator.
Two initial jobs generate $42,976 / $1,920, or about 22.4 times the property-file cost in gross profit. Including the full acquisition budget gives ($42,976 minus $6,274) / $6,274, or about 585% ROI. Over ten years, two accounts at $32,232 expected project gross profit each total $64,464 before acquisition and overhead, using the earlier 50% chance of winning each account’s second resurfacing.
My reorder rule is one signed project whose estimated gross profit covers the entire campaign spend, plus enough estimating capacity to work the next batch. If there are no wins, inspect the stalled proposals before buying more records.
Finding school and park court bids
School and park projects need a public procurement search alongside property prospecting, with each solicitation checked for its own scope and submission instructions.
Beaufort County’s Shell Point Tennis/Pickleball Court Resurfacing notice listed solicitation 102026 with an October 20, 2026 deadline. That deadline has passed. The notice is a recent example of the exact work category to search, including both sports in one project title.
Search court repair and athletic surfacing alongside tennis resurfacing. Read the documents before assigning an estimator, including any site-visit instructions. Check the requested repair system, pricing schedule, qualification documents and addenda. Keep the purchaser’s submission deadline separate from your internal estimate deadline.
The school district bidding guide covers the public buying process. If a recreation package includes fields as well as courts, the athletic-field replacement prospecting guide can help you evaluate the adjoining scope. Choose the portion your team can deliver and confirm whether the solicitation allows that approach.
Bid Control by PorchRocket finds public jobs by trade and area, with bid documents and addenda together. Bid Team can help work the estimate and prepare the forms; you make the final call on your number, sign and send. A 15-minute conversation with Rafael can help establish which school and park projects fit your crew.
Building your court territory in Ground Control
Ground Control gives a court contractor a file of matching properties to work, with area selection and optional contact research attached to the order.
For this campaign, the pieces to use are:
- Visible sport courts: select properties with the feature your resurfacing offer needs, then qualify the surface and project timing.
- The service area: choose the geography your estimator and installation crew can cover profitably.
- Relevant property types: start with multifamily and other suitable commercial properties, or choose homes for a residential court campaign.
- The reason for each match: carry that information into the first call and your property record.
- Owner and decision-maker research: add it when the campaign needs help reaching the responsible buyer; contacts not found are not charged.
- CSV or Excel delivery: load the file into your sales process and add inspection dates, proposal status and the next budget conversation.
Open a free account, choose your area and review the price before payment. Order the court properties your estimator can work this month, then put a dated budget conversation beside each address.
Quick answers
Where can I buy tennis court resurfacing leads?
Ground Control sells lists of commercial properties with visible outdoor courts for $10 to $20 per building. Owner information and decision-maker research are add-ons. Delivery is within 48 hours after payment. These are properties to approach, so qualify the court surface, buying contact and project timing before sending an estimator.
How often should an HOA resurface its tennis courts?
About every 4 to 8 years is SportMaster's published guidance for hard acrylic courts, depending on use and maintenance. Ask for the last resurfacing invoice and inspect the surface before recommending work. Put the coating project and any larger pavement repairs into separate scope lines so the board can budget for each.
How much does tennis court resurfacing cost in 2026?
SportMaster's published FAQ lists $12,000 to $20,000 per tennis court. Treat that as a manufacturer's planning range. Your estimate should price measured area, preparation, crack treatment, low spots, the selected coating system and lines. This guide's four-court model assumes $15,800 per court, or $63,200 for the project.
Can every tennis court become four pickleball courts?
No. Measure the available playing surface and check the proposed layout against the 2026 USA Pickleball rulebook. A lined pickleball court measures 20 by 44 feet, while the minimum playing surface is 30 by 60 feet. Existing posts, circulation and surrounding obstacles also need attention before promising a court count.
Who should I contact about apartment court resurfacing?
Start with the property manager and ask who approves capital work for the court parcel. Get the current owner or asset manager involved before preparing a detailed proposal. Confirm the budget year and required vendor documents, then offer a measured scope that the manager can forward for approval.
Can a basketball court resurfacing business use the same prospect list?
Yes, if the properties have outdoor courts that fit your surface systems and crew. Confirm the sport and substrate during qualification. Ask the owner which striping layout is required and whether equipment work belongs in your scope. Price that job from its measurements instead of applying a tennis-court package price.
How do I find school and park court resurfacing bids?
Use Bid Control to find public opportunities by trade and area, then read the buyer's current solicitation and addenda. Search for court repair, athletic surfacing and tennis or pickleball projects. Check the site-visit instructions and submission requirements before committing estimating time, including projects bundled with other recreation work.
Can aerial photos tell me when a court needs resurfacing?
No. Use the visible court to identify a property worth contacting. Establish resurfacing timing from the owner's maintenance records and a site inspection. Ground Control provides the property match; your crew confirms the surface system, repair quantities and work required before pricing the job.
Sources used in this guide
Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.
- Tennis court resurfacing costs and maintenance cycleSportMaster: Manufacturer's published $12,000 to $20,000 cost range, 4-to-8-year cycle and repair considerations; checked November 2026.
- Acrylic Resurfacer technical data sheetSportMaster: Surface preparation and air and surface temperature requirements during application and the following 24 hours; checked November 2026.
- 2026 Pickleball Single Sport Report releaseSports & Fitness Industry Association: June 2026 release reports 24.3 million participants in 2025 and 7.5 million core participants; checked November 2026.
- 2026 official pickleball rulebookUSA Pickleball: Sections 3.A.1 and 3.A.3 specify court dimensions, minimum playing surface and recommended new-construction dimensions; checked November 2026.
- An explanation of reserve study standardsCommunity Associations Institute: 2025 explanation covers association responsibility, anticipated component expenses and funding schedules; checked November 2026.
- Shell Point Tennis/Pickleball Court Resurfacing noticeSouth Carolina Division of Procurement Services: Beaufort County solicitation 102026 had an October 20, 2026 deadline; historical procurement example checked November 2026.
Find the next court complex your crew can serve.
Choose your area and visible outdoor courts. Get matching properties with the reason each fits, then add owner or decision-maker research for your outreach.