Privacy choices

Choose what we may use.

The site works without optional tracking. Your choice is saved on this device and can be changed here anytime.

Necessary

Runs the site, protects forms, and remembers this privacy choice.

Always on

Sports surfaces

Artificial Turf Replacement Leads: Find Fields Before the Bid

Build a territory of athletic fields with documented replacement windows, identify the budget owner, and reach projects before the construction bid arrives.

The short answer

The best artificial turf replacement leads combine a confirmed synthetic playing surface, evidence of the current carpet's installation date, an owner and a funding path. Start with an 8 to 12 year screening window, then check condition records and replacement plans. Asset Search by PorchRocket finds fields with dated evidence and ownership research across your territory. Bid Control tracks the public opportunities. Prioritize funded projects your crew can deliver during the buyer's available closure window.

Find fields and courts

What matters most

  • An 8 to 12 year age band starts the search; inspection records and owner plans decide which fields need replacement.
  • Miami Beach's 2026 resolution identifies a $1.5 million artificial turf replacement project, a project budget rather than a national price per field.
  • Asset Search returns fits, rejects with reasons and unresolved sites with the field check needed to settle them.
  • A modeled $783,000 replacement at a 19% gross margin produces $148,770 in project gross profit before acquisition costs.

One athletic field can carry a seven-figure replacement budget. Miami Beach’s 2026 Normandy Isle Park and Pool resolution identifies a $1.5 million artificial turf replacement project, already funded through an approved capital budget amendment. An installer looking for the next contract needs to know which fields have that funding and when the buyer plans to purchase the work.

Asset Search by PorchRocket finds fields across a chosen territory and connects each site to dated evidence and ownership research. Your rep needs a replacement window. The estimator needs a buyer who can fund the specified work during a closure period that leaves enough time for your crew to remove the old surface and install the replacement.

Bid Control by PorchRocket covers the public purchasing side. Build the field inventory first. Then follow the funding decisions and solicitations tied to the surfaces your crew can serve.

How long does a synthetic turf field last?

Use 8 to 12 years as an initial prospecting window, then rank individual surfaces against the owner’s documented assessments and replacement plans.

The sources support a range. Cornell’s sports field management comparison uses 8 to 10 years before replacement. Castle Rock’s March 2026 Bison Park staff memo describes a typical 10 to 12 year cycle. Neither gives you an expiration date for every field in your territory.

For an inventory built in November 2026, I would begin researching surfaces installed from 2014 through 2018. Keep older fields in the search too. A surface beyond that band with an approved replacement project deserves attention before a younger field with no planned expenditure.

Count from the current carpet installation. When a campus history gives you a stadium opening date and a later athletics renovation, establish which work changed the carpet before using either date to put that field in the replacement queue. Log repairs separately.

Condition decides the next conversation. The District of Columbia’s field FAQ describes about 10 years of turf life, but says replacement follows evaluations and available funding rather than a fixed schedule. Ask for the owner’s latest assessment before recommending a replacement scope.

Use age to choose whom to call. Use the owner’s records to choose what to discuss. Maintenance has its own appointment. Reserve a replacement estimate for a buyer considering that scope, and offer a budget discussion when staff are still deciding how to fund the work.

Keep a future-year queue alongside immediate opportunities. A recently installed field can be a service prospect now and a replacement prospect later. Record its installation documents while they are easy to obtain, then assign a review date instead of calling the facilities office every month.

School turf field replacement cost in 2026

Compare budgets by scope and funding stage: Miami Beach’s $1.5 million project and Leander ISD’s $1.6 million two-stadium funding requirement describe different packages of work.

The Leander ISD January 2026 board report identifies the combined stadium turf requirement. Dividing that total in half would create a price the record does not establish. Ask for the individual scopes before treating either stadium as a comparable job.

Castle Rock’s Bison Park proposal offers a different distinction. Its construction amount was not to exceed $523,900, with $52,390 in town-managed contingency, for $576,290 total proposed authorization. The memo describes approximately 125,000 square feet of existing turf replacement. Preserve the difference between a staff proposal and a paid final invoice.

Use this comparison sheet when reviewing a public budget or discussing a private sports complex:

Cost question What to record Why it changes the comparison
Surface quantity Defined replacement boundary and measured area Playing lines alone do not define the entire work area
Removal Carpet, infill and haul-off responsibilities A supply-only number omits work your crew might carry
Existing base Investigation findings and specified repairs An allowance differs from a firm repair quantity
Replacement system Specified carpet, pad and infill Compare the required assembly, not color or appearance
Finish requirements Markings, testing and owner acceptance documents These belong in the estimate when the scope requires them
Budget status Estimate, authorization, award or final payment Each number answers a different question

There is also a difference between installation and replacement. DC’s March 2026 installation guidance gives an approximately $15 per square foot estimate, excluding potential below-grade remediation or grading. Do not relabel that figure as a national carpet replacement rate.

I would price a school’s field from its documents and an authorized site review. Follow the buyer’s format for uncertain work. Obtain current supplier and disposal quotes before presenting alternates, so the person comparing your proposal can tell which costs belong to the specified assembly and which depend on a decision still to be made. Keep those details after the job closes.

Follow the bond money before the bid posts

School replacement prospects move closer to purchase when a specific field appears in an approved funding decision, with a project scope and an intended construction period.

Leander ISD’s board approved reallocating savings from its 2023 bond program for stadium turf in January 2026. Watch changes inside existing bond programs as closely as new election proposals.

There are also broader funding signals. Yakima School District’s 2026 bond updates report approval of a $200 million bond in April and include stadium turf among the planned improvements. That district-wide total is not the turf budget. Follow the project line into later scope and purchasing decisions.

I keep four funding stages in a field account:

  • Proposed: a facilities recommendation or public discussion names the work.
  • Authorized: a documented action includes the field within an approved program.
  • Scheduled: the buyer identifies a design or purchasing period and a construction window.
  • Purchasing: the solicitation or other stated procurement process is underway.

Attach a source and a date to every stage change. Save the page or document title with the field record so another salesperson can check the claim without rebuilding the research.

The next call should match the stage. During planning, ask when staff need budget information. After authorization, ask how the district intends to procure the work and where it publishes instructions. During purchasing, direct questions through the contact and process stated in the solicitation.

Avoid reporting a whole bond program as available turf revenue. Your addressable work is the field package your company can pursue. Keep a proposed field in the planning queue until its funding path becomes clear, and keep a funded field out of the estimate queue until the scope is defined well enough to price.

The school district bids guide explains the broader buyer process. For turf prospecting, connect each funding record to the individual surface rather than leaving it in a folder labeled with the district name.

How to find artificial turf replacement leads near you

Start with a service territory and an agreed definition of a qualifying playing surface, then connect reviewed field locations to age evidence and ownership records.

The fastest way to build that territory is Asset Search by PorchRocket for fields and courts. Set the field types and geography with PorchRocket, including the evidence your team needs. Asset Search cross-references aerial and satellite views with property records and public datasets. Candidates receive human review before delivery. Every disposition comes back with dated evidence. Choose per accepted result when buying fields that meet the agreed search criteria, or per investigation for a full inventory. Start with a small paid pilot credited toward the full order, then expand using the agreed criteria.

Define the geography around how you deliver installations. Mark your supplier coverage and travel limits. Check warranty-service access too. A distant field with a large budget can consume more crew time than your estimate allows.

Specify the asset too. Separate indoor practice areas from outdoor surfaces. Define which football and soccer configurations belong in the search, with a separate rule for baseball work if your company serves it. Tell the search team which scopes require a partner.

Keep unclear surface types unresolved until the evidence settles them. A sports outline locates a candidate; dated records and closer review establish whether it belongs in the synthetic-surface campaign. Ask for one next check rather than a confident guess.

Public field inventories and district facilities pages can seed the search. Add capital plans. Check each starting record against the physical site and current surface, and retain newly discovered candidates when the evidence meets your rules.

The asset inventory guide covers the wider search method. A turf dealer’s narrower brief should end with fields assigned to a territory rep, each with a reason to investigate and a next action.

Build an age record for each playing surface

A dependable field age record identifies the latest carpet installation, distinguishes confirmed dates from date ranges, and preserves the source behind every conclusion.

Request an installation acceptance document or replacement project record first. Warranty paperwork can support the date. Check its scope. A general campus renovation announcement needs more detail before it can establish carpet age.

Dated imagery helps bracket a visible change. If successive views show different layouts or a replacement underway, record the observation dates and the interval they establish. Do not replace that interval with an invented installation month.

Use a small evidence table that keeps sales notes separate from observations:

Record field Acceptable entry Follow-up when missing
Current surface installation Date plus acceptance or project document Ask facilities for the latest carpet replacement record
Dated views Observation dates and the change observed Review another date or request owner confirmation
Replacement assessment Report date and owner-stated recommendation Request the current assessment through the buyer’s process
Planned replacement Project year and source Ask when the next facilities plan is reviewed
Confidence Confirmed date, bounded interval or unresolved State the one document or site check needed

Keep separate timelines for the turf and its base. Give the surrounding track its own record. If your rep sees a fresh track in an aerial view, that observation should not reset the turf installation date. Likewise, a new logo does not establish a new carpet without supporting evidence.

For a dealer network, use the same date definitions across territories. Require the supporting document. A territory forecast loses meaning when branches enter stadium opening dates in the same column that other branches use for the acceptance date of a replacement carpet installed years after the original construction.

Use installed base mapping to retain evidence for the surfaces you can serve. Revisit the ones approaching a buying decision. Sort by the age of the current surface when supported, then by the strength of the funding signal.

Who owns the field and approves the replacement?

Build each field account around the recorded owner, the operating organization and the role responsible for capital purchasing, then confirm how those responsibilities connect.

Start with the parcel and owner record returned with the site. Ask who operates the facility and who can authorize the proposed scope. Keep a shared-use arrangement in the account when the buyer provides it; do not assume the organization scheduling games pays for replacement.

For a school account, I would ask the facilities office who maintains the surface record and which purchasing contact handles capital work. Then establish when athletic scheduling staff need to review access and closure plans. Record roles before building a contact sequence.

Ask a private sports complex the same operational questions. Who approves the expenditure? Who controls the installation window? Which person can supply the current surface documents? A conversation with a coach can identify the right route, but your estimate needs an authorized buyer.

Use this sample opening call:

“We install replacement athletic surfaces in your region. Who maintains the current turf installation records, and when do you review the field’s replacement budget? I would like to send the right person our scope checklist before requesting a site visit.”

Once the contact answers, make the request narrower. Ask for the current installation year or the next budget review date. A broad request for every facilities document creates work before you have established a reason for the conversation.

Separate the contact role from the field record. One purchasing office can handle several surfaces, while each field has its own age and schedule. Group those records for account planning without counting a shared contact as several independent buying decisions.

Asset Search includes owner information and decision-maker contact where it applies. Your rep’s first task is confirming the purchasing route and recording the next agreed conversation date.

Qualify replacement prospects before scheduling a visit

Give estimating time to fields with a supported surface match, a credible replacement discussion, an identified buyer and a construction window your company can meet.

I would use four gates rather than a score padded with weak signals. A field must pass each gate before it receives a full replacement estimate:

Qualification gate Evidence to request Action if it is missing
Work fits Surface type, project boundary and required installation qualifications Resolve the scope or refer it to the right service track
Replacement is being considered Owner assessment or a documented planning discussion Keep it in research rather than dispatching an estimator
Buying path exists Buyer role, funding stage and procurement route Schedule a budget conversation
Delivery fits Access, closure dates and required acceptance date Check crew availability before offering a proposal

At the site review, ask for permission to document the specified work areas. Trace equipment access from the delivery point to the field, marking the staging area and any restrictions that would change how your crew removes material or brings the replacement system onto the site. Put those observations into the estimate file.

Use the owner’s assessment and required tests to define the work. An image of a worn-looking surface does not answer whether a pad can remain or what base repairs are needed. Assign those questions to the specified investigation before pricing the assembly.

The Synthetic Turf Council’s technical resources include guidance on base systems and shock pads as well as performance and maintenance. Its maintenance guidance supplements the warranty provider’s instructions. Use the documents applicable to the proposed system rather than treating all synthetic fields as interchangeable.

Ask what would stop the project. The buyer might still be deciding the scope or looking for an acceptable closure period. Record that unresolved decision and who owns it.

A qualified replacement prospect ends with a dated next step: document review, authorized inspection, budget discussion or formal bid decision. “Interested in turf” is too broad to justify holding an installation slot.

Finding sports field construction bids with Bid Control

Use Bid Control to follow school and municipal turf projects from early funding signals into published solicitations, then evaluate the scope and submission requirements before bidding.

Search beyond one phrase. Use synthetic turf replacement and athletic field renovation. Add stadium improvements to catch broader packages. Read the scope to see whether turf is the main package or part of larger construction work. Assign every matching notice to the field record so your sales and estimating teams share the same project history.

The Dover Area School District January 2026 turf RFP illustrates the detail involved. Its opening requirements called for a 10% bid bond and performance and payment bonds each equal to 100% of the contract sum. The attached bid form also listed cashier’s and certified checks as security options. That discrepancy belongs in a written clarification request. The packet included addendum acknowledgments, required scheduling site visits through the facilities director, and set August 21, 2026 as final completion. Use it as a historical example when reviewing a new solicitation.

Start the bid decision with the specified surface and available work period. Check installation qualifications. Before assigning an estimator, confirm your supplier can support the proposed system within the work period and ask the buyer’s stated contact about any discrepancy between the scope and the documents provided. Retain the written response.

Public funding can lead to purchasing routes other than an open competitive invitation. Castle Rock’s Bison Park memo proposed a cooperative purchasing route. Confirm the route for the particular project before treating an approved budget as a bid your company can submit.

Bid Control’s public contract tracking collects the project documents. It tracks deadlines and addenda alongside early project signals. Use past award information to understand comparable work, then build your own scope-based number. Bid Team can work the estimate and forms with you when your company wants that support. You make the final call on your number, sign and send.

Keep the field-search budget and bid-preparation hours visible separately. One buys territory coverage; the other pursues a particular contract after it passes your bid decision.

Courts and pools belong in a separate sales track

Group nearby courts and pools under the same facilities account, with separate scope records and buying timelines for each asset your company can serve.

The reason to include adjacent assets is account coverage. If your company resurfaces courts or works through a qualified partner, ask who plans those projects during the facilities conversation. Do the same for pool work only when your team can serve it.

Never copy a turf age band into a court record. Request the latest court work and owner assessment. Then check the next planned project. Record line painting apart from resurfacing, and flag a reconstruction scope for the estimator rather than leaving it under a general court-work label.

The sport court resurfacing prospecting guide covers that sales track. For standard property prospecting, Ground Control by PorchRocket can find properties with visible features such as sport courts and pools. The pool property list is the self-serve starting point when a visible pool is the main filter.

Choose Asset Search when the assignment needs reviewed evidence joined to ownership records across several asset types. Include every disposition in the handoff. A regional sports-surface dealer might request fields first, then add courts under the same owner groups.

Give each asset its own next action. A campus-wide meeting can save travel, but the field project should advance on its own qualifications. Count additional contract value only after the buyer identifies the work and a purchasing path.

What one qualified field is worth to a contractor

A replacement prospect earns its place in the pipeline through expected gross profit after acquisition costs, rather than the project’s headline budget alone.

Say a north Texas sports-surface contractor reviews 96 field records, qualifies 72 for outreach, holds 18 buying conversations and nine planning meetings, then prices five funded opportunities and wins one. Assume that replacement sells for $783,000 at a 19% gross margin after job costs. Those costs include removal, materials and installation labor, with production travel and subcontract work included.

The assumed stage rates are 72 / 96 = 75% accepted for outreach, 18 / 72 = 25% reaching a buying conversation, nine / 18 = 50% reaching a planning meeting, and five / nine = about 55.6% reaching a funded proposal. Work backward through those stages when setting the territory size.

The project gross profit is $783,000 x 19% = $148,770. The overall close rate is one contract from 72 eligible fields, or about 1.4%. The bid-stage close rate is one from five, or 20%.

Budget 90 staff hours for record review, outreach, meetings and estimating at a loaded internal cost of $68 per hour. Add $1,440 in nonlabor site-review and travel expenses, separate from the labor already counted. Staff and expense cost is $6,120 + $1,440 = $7,560. Treat this as the full acquisition budget for the campaign, with no separate advertising or commission expense. Assume existing estimating templates and supplier relationships; increase the hours if the five proposals require more work.

Let Q represent the total scoped Asset Search quote, counting the pilot credit once. Total acquisition cost is $7,560 + Q. Customer acquisition cost, or CAC, is that total divided by contracts won; with one win, it remains $7,560 + Q.

Lead-list ROI is gross profit minus acquisition cost, divided by acquisition cost. For this campaign, calculate ($148,770 - $7,560 - Q) / ($7,560 + Q). Enter the quote before deciding whether to expand the territory. The lead-list ROI calculator provides a place to work through acquisition spending and account returns.

For account lifetime value, count the project gross profit first. If a separately won maintenance agreement produces $6,700 a year at a 35% gross margin for four years, assume the account stays for all four years, with no price changes or discounting. It adds $6,700 x 35% x 4 = $9,380. Combined gross profit becomes $158,150. Keep that maintenance value out of the initial replacement decision until you have a reason to expect the agreement.

I would use the project-only return for the pilot decision. Future replacements remain in the inventory forecast until their timing and purchasing path are supported.

A low, base and high case for the same sales hours

Test the field campaign at 14%, 19% and 24% project gross margins while holding one win, the $783,000 contract and acquisition effort constant.

The margin assumptions reveal how much room the account has for acquisition spending. They also show why an estimator needs to include production travel and disposal work before sales celebrates a large contract.

Campaign result Low margin Base margin High margin
Contracts won from five proposals 1 1 1
Project gross margin 14% 19% 24%
Project gross profit $109,620 $148,770 $187,920
Staff and nonlabor acquisition expense $7,560 $7,560 $7,560
Contribution after acquisition, including search quote Q $102,060 - Q $141,210 - Q $180,360 - Q

Compare targeting with spending those same 90 hours on a loose list. Hold the five-proposal campaign as the focused case. Suppose the loose list produces only two funded proposals because more conversations concern newer surfaces or work outside your scope. At the same 20% bid-stage win assumption, expected wins fall from 1.0 to 0.4 across repeated campaigns.

At the base margin, expected project gross profit falls from $148,770 to $59,508. That is a 2.5-fold difference in expected gross profit for the same staff time. The improvement comes from reaching more opportunities the crew can bid, without increasing the assumed win rate.

Track it during the pilot. Count eligible fields. Compare buying conversations with funded proposals, logging hours against each stage. If the accepted prospects produce too few budget conversations, revise the age or funding criteria before ordering another territory.

For my decision rule, the low-margin case must cover the scoped quote and internal acquisition cost while leaving the company’s required contribution. A campaign with no win produces a loss equal to its acquisition spend. Control that exposure with a small pilot and a defined estimating budget before expanding.

How to build a turf replacement pipeline, step by step

Build the first turf territory in eight steps, ending with assigned accounts and documented next actions rather than an unworked spreadsheet of sports locations.

  1. Set the delivery territory. Choose the counties your installation crew can serve, and write down travel and warranty-service limits. Set the surface types and project sizes you will consider before reviewing candidates.
  2. Define acceptance evidence. Require a confirmed synthetic surface and owner record. Specify whether the current carpet’s installation date must be documented, whether a bounded installation interval is acceptable, and how unresolved age should be returned.
  3. Run the Asset Search pilot. Submit the territory and field criteria through PorchRocket’s field search. Choose per accepted result for sales prospects, or per investigation for an inventory. Review dated evidence and all dispositions before expanding the scope.
  4. Attach age and funding records. Research current carpet installations, board actions and the field’s project line. Keep proposed work separate from approved expenditures, with a source date on each entry.
  5. Confirm the buyer and calendar. Ask facilities who handles capital purchasing and which periods are available for inspection and construction. Record the person responsible for resolving each open question by role.
  6. Qualify before estimating. Apply the four gates for work fit, replacement discussion, buying path and delivery. Request an authorized site review only when the account is ready for that expense.
  7. Follow the public purchasing process. Track the project in Bid Control, read the solicitation and review every addendum. Confirm requirements with the stated contact and make the bid decision before assigning a full estimate.
  8. Measure the pilot and refresh. Compare funded proposals and acquisition hours with the low-margin case. Resolve weak evidence, assign review dates to future projects, and expand only the criteria that produced qualified buying conversations.

For the first month, I would reserve the opening week for scope and pilot acceptance. Use the second week to validate buyer roles and funding records, then spend the remaining weeks on scheduled conversations and qualified site reviews. Let the buyer’s purchasing calendar govern proposal dates.

Your handoff should identify the account owner and next action for every accepted field. A newer surface might receive a future review date. A funded replacement might receive a solicitation alert and an estimating appointment. An unclear surface gets its defined field check.

Have the estimator review the first set of accepted prospects with sales. If the scope rules admit jobs your installation team would decline, change those rules while the pilot is still small. Keep the rejection reasons so the next search starts from the revised criteria.

Keep the field inventory current through the season

Use a quarterly territory refresh for replacement planning, with weekly checks on active public projects and prompt updates whenever the buyer supplies a new decision.

Those are operating cadences I would choose for this campaign. The inventory changes on a different clock from a bid deadline. A future replacement can wait for a scheduled review; an active addendum needs attention during the purchasing period.

Asset Search can re-check sites as new imagery becomes available and re-answer previously searched locations when your criteria change. Choose a monitoring subscription when the territory needs continuing updates, with changes linked to before-and-after dates.

Update the surface record after a confirmed replacement. Move the field out of near-term replacement outreach and preserve the new installation evidence. Keep the owner account open for service work within your company’s scope.

Revisit rejects when your capabilities change. A dealer adding another installation method or qualified service partner can ask Asset Search to reconsider the existing territory against the new requirements. Keep the prior decision and the reason it changed.

The asset monitoring guide covers ongoing territory work. For athletic surfaces, the sales manager should be able to see when each field was last checked and why it remains in the current queue.

What Asset Search returns for a turf territory

Asset Search delivers reviewed field records with dated evidence and ownership information, so a sports-surface contractor can assign prospects and decide which opportunities deserve estimating time.

Start the scope with your delivery area and the field types your crew serves. Agree on which visible observations and supporting records establish a match. PorchRocket reviews candidates against the rules set with your experts. Your sales team then adds installation documents, funding decisions and the buyer’s purchasing calendar to the returned field records.

Your team gets:

  • Field location and parcel information connected to an owner record, with decision-maker contact where it applies.
  • Dated views and observed facts addressing the agreed surface and territory criteria.
  • Fits, rejects with reasons and unresolved sites with the one field check needed to settle the question.
  • A CSV, Excel, GIS-ready file or CRM import organized for the sales territory.
  • A paid pilot credited toward the full order, with pricing structured per accepted result or per investigation to match the purchase.
  • An option for scheduled refreshes and monitoring as surfaces change or your service criteria expand.

The standard search covers the contiguous United States, from a county pilot to a dealer network’s territories. Submit the field requirements through the two-minute scope form; PorchRocket returns a scope and quote, then ships the pilot in your format.

Give the next estimator a field with a documented reason to call and a buyer with a decision to make.

Questions people ask

Quick answers

Where can athletic field contractors get artificial turf replacement leads?

Start with a territory inventory of synthetic fields, then add the current carpet's installation date, owner, replacement plans and funding status. Asset Search by PorchRocket supplies reviewed field locations and dated evidence. Use Bid Control for public projects and qualify each opportunity against your installation capacity before committing estimating time.

How long does a synthetic turf field last?

About 8 to 12 years is a sensible initial screening window. Cornell's extension comparison gives 8 to 10 years, while Castle Rock's 2026 replacement memo describes 10 to 12 years. Field condition, use and maintenance affect the decision. Check the current surface's installation records and the owner's assessment before assigning a replacement year.

How much does school turf field replacement cost in 2026?

Price the specified work. Leander ISD's January 2026 report identifies $1.6 million needed for turf at two stadiums, without establishing an equal price for each. Compare removal responsibilities and the specified replacement system before using a public budget as an estimating reference.

Can satellite or aerial imagery show when a field needs replacement?

Dated views help locate fields and bracket visible surface changes. They do not establish surface performance or the condition of buried components. Join imagery with installation records and owner reports. Asset Search marks unresolved sites with the field check needed to answer the agreed question, rather than assigning an unsupported replacement date.

Do school bonds pay for artificial turf replacement?

Yes, where the approved program includes that work. Leander ISD approved reallocating existing bond savings for stadium turf in January 2026. Follow the individual field's project line and purchasing decisions rather than treating a district-wide bond total as turf revenue.

Are synthetic field replacement leads the same as open construction bids?

No. A replacement prospect is a field that fits your territory and service, with evidence worth investigating. An open bid is a published purchasing opportunity with instructions and a deadline. Keep the prospect inventory and solicitation tracker connected so your team can follow projects from early planning through the buyer's formal process.

What does Asset Search charge for field replacement prospects?

Asset Search scopes and quotes the work around your territory, evidence requirements and delivery format. Per accepted result suits a sales team buying fields that meet its agreed search criteria; per investigation suits an inventory requiring every disposition. A subscription fits ongoing monitoring. Most buyers begin with a small paid pilot credited toward the full order.

Should turf dealers also prospect tennis courts and pools?

Yes, if their company or service network can deliver the additional work. Keep courts, fields and pools in separate sales tracks with their own scope and budget questions. A shared campus can support one coordinated facilities conversation, while each asset retains its own record, buying timeline and qualification requirements.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. Miami Beach Resolution 2026-34283City of Miami Beach: Identifies the $1.5 million Normandy Isle Park and Pool artificial turf replacement project and approved FY 2026 capital funding. Checked November 2026.
  2. Bison Park synthetic turf replacement, RES 2026-029Town of Castle Rock: March 2026 staff proposal distinguishes construction from contingency, describes approximately 125,000 square feet of replacement and gives a typical 10 to 12 year cycle. Checked November 2026.
  3. Artificial turf and grass fields FAQDistrict of Columbia Department of General Services: Describes about 10 years of turf life, condition-based replacement decisions and a March 2026 installation cost estimate. Checked November 2026.
  4. Synthetic turf sports field managementCornell University: Extension comparison includes 8 to 10 years before replacement. Its historical construction prices are not used as 2026 estimates. Checked November 2026.
  5. January 22, 2026 board briefs, stadium turf fundingLeander Independent School District: Reports approved reallocation of existing bond savings for two stadium turf replacements requiring $1.6 million. Checked November 2026.
  6. 2026 bond program and construction updatesYakima School District: Reports April 2026 approval of the $200 million bond and includes stadium turf among district improvements. Checked November 2026.
  7. Synthetic turf technical guidelinesSynthetic Turf Council: Lists base, performance, shock-pad and maintenance guidance; maintenance guidance supplements warranty-provider instructions. Checked November 2026.
  8. Middle school stadium turf replacement RFP, January 30, 2026Dover Area School District: Historical solicitation documents scheduled site access, August 2026 completion, bond requirements and addendum acknowledgments. Checked November 2026.
Your next best move

Know which fields belong in your replacement pipeline.

Tell us your territory, surface criteria and replacement window. Asset Search returns reviewed field locations, owners and dated evidence in a file your sales team can work.

Find fields and courts