Parking Lot Striping Leads: Price the Lot and Build Repeat Work
Find commercial lots inside your service area, quote the markings without missing the extras, and give property managers a reason to call you back.
Find parking lot striping leads by selecting properties with paved parking areas inside your route, then reaching the person who approves pavement maintenance. Ground Control by PorchRocket filters commercial properties by business type, building size and visible parking areas for $10 to $20 per building, delivered within 48 hours after payment. Confirm quantities on a site walk, price preparation and markings separately, and agree on a future condition review to earn repeat restriping work.
What matters most
- Ground Control costs $10 to $20 per commercial building, with orders starting at 10 buildings.
- An 84-space retail parking facility generally needs four accessible spaces, including at least one van space, under the 2010 ADA Standards.
- The worked strip-center quote totals $1,715.60 after preparation, mobilization and specialty markings are included.
- The campaign model counts $2,880 in list and sales costs, giving a $1,440 acquisition cost when two accounts sign.
Say you quote an 84-space strip center at $8.25 per stall. The stall-line subtotal is $693. Measure the same layout at 2,352 linear feet and charge $0.30 per foot, and it becomes $705.60. Those are estimating assumptions for this example. The $12.60 difference matters less than an unpriced return trip or the preparation you left out.
Parking lot striping leads pay when the lot fits your crew and the buyer can approve the work. Ground Control by PorchRocket finds commercial properties with paved parking areas in the territory you choose, filtered by business type and building size. Your next job is to qualify the purchasing contact and measure the markings.
I would build the line striping business around nearby repeat accounts, with a written scope for every visit. One strip center can lead to its manager’s other properties and later sealcoating work. Start with a job you can deliver at a margin.
Which striping jobs should a new contractor pursue?
Existing commercial layouts with clear purchasing authority are a sensible first target because you can define the quantities and access requirements before committing a crew.
Choose the work your equipment and estimating process can support. I would start with retail and office lots in a compact territory where the estimator can return to settle a layout question without spending half a day on the road, then add demanding layouts as the crew builds a production record.
| Job type | First question for the buyer | What to put in the estimate | Reason to decline or rescope |
|---|---|---|---|
| Existing-layout restripe | Is the current layout approved to remain? | Measured boundaries, colors and specialty markings | Buyer expects a redesign inside a repaint price |
| Layout after sealcoating | Who preserves the layout and releases the surface? | Layout work, paint and the return mobilization | Coating and painting dates have no agreed handoff |
| Accessible-space changes | Who approves the revised plan? | Field measurements, markings and any sign work | The proposal leaves required surface or route work unassigned |
| Fire-lane refresh | Which local detail applies? | Curb faces, stripe length and lettering | Buyer asks for unapproved changes to the designated lane |
| New parking layout | Who supplies the dimensioned plan? | Layout labor, installation and acceptance review | No one has approved the drawing |
A restripe proposal should identify the drawing or marked-up photograph the buyer accepts. Walk the lot together when the old lines conflict. Mark every removal or relocation on that plan. Get it approved.
Keep removal work visible in the quote. Ask the buyer to approve the method and appearance before you price an old layout out of the job, because the stall price you agreed for repainting has to leave room for the labor and equipment needed to remove markings.
Decide who holds the contract, too. Working directly for the property manager gives you the follow-up relationship. Working for a paving contractor can fit an open night on your calendar. The broader commercial paving contract guide explains how to approach both private properties and public buyers.
Parking lot striping pricing per stall and per foot
Build the striping price from measured quantities and direct costs with separate allowances for mobilization and specialty items, giving the owner the same scope to compare across quotes.
Shared lines count once. For the 84-space strip center, measure stall boundaries on site and keep a separate schedule for symbols and other specialty markings so your per-stall summary does not accidentally charge twice for paint on a divider that serves two vehicles.
Use the linear-foot version of the opening example for this quote. The assumed $0.30 rate covers one coat of four-inch stall boundary lines, including accessible-space boundaries. The specialty items below cover the additional work.
| Scope item | Quantity and assumed rate | Extended price |
|---|---|---|
| Stall boundary lines | 2,352 linear feet x $0.30 | $705.60 |
| Mobilization | One visit | $275.00 |
| Surface preparation | Agreed cleaning scope | $165.00 |
| Accessible-space pavement symbols | Four x $68 | $272.00 |
| Access-aisle hatching | Two x $85 | $170.00 |
| Directional arrows | Four x $32 | $128.00 |
| Total | Existing signs retained; no layout removal | $1,715.60 |
The quote assumes the four accessible spaces share two access aisles in an approved layout, with a 132-inch van space beside a 60-inch aisle. Section 502.3 permits two spaces to share an aisle. Confirm their placement and route connections before using this quantity schedule. The total excludes sales tax; add any applicable tax separately.
The per-stall version would total $1,703. Reconcile that small difference before sending the proposal. I prefer measured feet on the estimate sheet and a lot total on the customer proposal, with the quantity schedule attached.
Check the cost floor before accepting either version. Assume two workers at 7.5 hours each, covering travel plus loading and cleanup, at a loaded labor cost of $34 an hour: $510. Add $218.60 for paint and supplies, $180 for vehicle and equipment costs, and $120 for access staging. Direct cost is $1,028.60. Subtract it from $1,715.60 and the job produces $687 in gross profit, before sales costs and general overhead.
Set your own minimum mobilization from those costs. For the next estimate, replace every assumed rate with your crew’s records and current material quote. A per-stall price is a shorthand for a defined layout, so attach the dimensions that make it work.
What belongs in a striping proposal?
A parking lot striping proposal should settle the installation scope and site access before the crew arrives, including who pays for a return trip caused by parked vehicles.
Give the buyer an annotated plan showing the work area and a quantity schedule identifying each stencil. State the paint, line widths and colors, and coat count for each marking. Price preparation and removal separately so a layout change has a visible cost.
For fire lanes, use the jurisdiction’s current detail. For example, McKinney’s Fire Code, Section 503.3, specifies six-inch red boundary striping and four-inch white lettering at 25-foot intervals. Where a curb is available, striping goes on its vertical face. The city adopted this code on August 19, 2025, effective October 1, 2025. Get the corresponding detail for the town where you are quoting.
Then resolve the operating window. Have the manager designate an on-site contact and arrange vehicle removal. Agree on how tenants will reach their entrances while sections are closed. Put a weather rescheduling procedure in writing. Include a price or approval process for another mobilization if the promised work area is unavailable.
Let the material set the application window. SealMaster’s Fast Dry Traffic Paint instructions require a surface that is clean and dry. Surface and air temperatures should not drop below 50°F or exceed 120°F during a 24-hour period. Schedule your job using the specified material’s instructions.
Finish with acceptance and payment terms. Name the person who walks the finished markings with you and receives the photographs. State whether sign replacement is included, along with the agreed treatment of damaged pavement. Revise the plan and price together before the crew loads.
ADA parking counts under Section 208
A typical 84-space retail parking facility requires four accessible spaces, including at least one van space, under Section 208 of the 2010 ADA Standards used in 2026.
The Department of Justice’s restriping guidance says businesses and state or local governments restriping a parking facility must provide accessible parking required by the 2010 Standards. That gives you a specific scope discussion: confirm the required spaces before repainting the layout.
Use Table 208.2 and the van-space rule in Section 208.2.4 for ordinary commercial parking facilities. The accessible total includes the van spaces; do not add the van column to it.
| Spaces in one parking facility | Minimum accessible total | Minimum van spaces within that total |
|---|---|---|
| 1 to 25 | 1 | 1 |
| 26 to 50 | 2 | 1 |
| 51 to 75 | 3 | 1 |
| 76 to 100 | 4 | 1 |
| 101 to 150 | 5 | 1 |
| 151 to 200 | 6 | 1 |
| 201 to 300 | 7 | 2 |
Calculate each parking facility separately. Under Section 208, at least one of every six required accessible spaces, or fraction of six, must accommodate vans. Separate scoping rules apply to certain health-care facilities and residential parking. Establish the use before choosing a row.
There is also a scope distinction worth handling at the estimate. The Access Board’s parking guide describes repainting a few existing spaces in place as normal maintenance unless usability is affected. Resurfacing or resealing constitutes an alteration; adding spaces is an alteration or addition. Define the scope at the walk. Record whether the buyer wants a limited touch-up, a full restripe or a revised layout, then work from the applicable requirements. Maintenance classification does not erase existing obligations: DOJ also describes ongoing barrier-removal duties for public accommodations and program-access duties for public entities.
Stall widths, access aisles and signs
Section 502 sets dimensions for accessible stalls and access aisles along with other physical requirements, so measure the site before assigning a price to the work.
The 2010 ADA Standards, Section 502, give these dimensions for the field sheet:
- Car spaces: at least 96 inches wide, with an adjacent access aisle at least 60 inches wide.
- Van spaces: at least 132 inches wide with a 60-inch aisle, or a 96-inch space with a 96-inch aisle.
- Access aisles: extend the full length of the space, adjoin an accessible route and carry markings that discourage parking.
- Surface slopes: no steeper than 1:48 in accessible spaces and aisles.
- Van clearance: at least 98 inches over the space, aisle and vehicle route serving them.
- Identification: required signs include the accessibility symbol; van signs also say van accessible. The bottom of the sign is at least 60 inches above the ground.
Measure marked widths from the centerlines, subject to Section 502.1’s exception for an outside boundary without an adjacent space or aisle. Add the measurements to the layout photograph so the manager can see what the quote covers.
For the strip center, locate accessible spaces on the shortest accessible routes to the entrances they serve, dispersing them when multiple accessible entrances are served under Section 208.3. Keep access aisles out of vehicle lanes; angled van spaces need the aisle on the passenger side under Section 502.3.4. Photograph the signs and note who handles replacements. The Access Board explains that pavement symbols do not replace required above-ground identification signs. Assign any route or surface changes to a priced scope before scheduling paint.
Bring the field sheet back. A note saying accessible parking checked leaves the estimator guessing about what the crew measured, while a sheet with dimensions beside the slope readings and sign heights lets someone reviewing the estimate compare the installation with the approved plan.
When should you contact an owner about restriping?
Set a parking-marking review date with each owner, starting with an annual inspection, then schedule repainting from the observed condition and the property’s operating calendar.
I would sell the inspection date before selling a fixed replacement cycle. Ask who last striped the lot and when. Find out whether a paving or sealcoating project is already budgeted. Request the last layout and invoice.
Build the follow-up around a decision. Record the next budget review and preferred closure window beside the date you can inspect again. If the buyer says next spring, agree on a month for the walk and a separate month for the proposal.
Use dated photographs from the same positions on later visits. Compare the layout and marking visibility. Ask the manager about areas they want reviewed rather than assuming a whole-lot repaint is the next purchase.
The operating calendar belongs in the sales record. Ask retail managers about tenant hours and deliveries. Ask office managers which days the lot can be cleared. Get that answer first. Otherwise the estimator can spend an evening developing a phased closure plan around a Friday night that the buyer has already ruled out because tenants need the parking until morning.
Do not build the follow-up list from memory. Every accepted job should leave an installation record that states the material used and next contact date. Put properties waiting on a resurfacing decision in a separate queue, with a named person responsible for updating you.
Where to find parking lot striping leads near you
Start with retail and office properties that have paved parking areas inside a compact territory; qualify purchasing authority and the work window before arranging a site walk.
Choose a territory you can visit repeatedly. I would draw it around existing jobs and roads the crew already uses, then group prospects by business type. Keep outlying properties on a separate route until there is enough work to justify the trip.
Choose the territory in Ground Control’s parking-area search, then select commercial properties with visible paved parking areas using the business-type and building-size filters. The parking lot property list describes the available search. Select the buildings first; count stalls and measure paint quantities during the authorized field survey.
Give each prospect a qualification record with its address and route cluster. Record the responsible manager’s purchasing authority beside the expected work window and next action. Keep building size distinct from the lot measurements you collect later. A building-size filter helps define the search; your field quantities price the work.
For the contact, begin with the recorded owner or the management office and ask who handles pavement maintenance. Request owner information or decision-maker contact research as an add-on when ordering. Confirm the role in conversation before sending a proposal.
The building-first commercial prospecting method is the general playbook for this work. For related property-service relationships, review commercial snow removal contracts and parking lot lighting retrofit leads. Ask those service providers about an introduction after agreeing on which properties and work each company serves.
Save a reason for every inclusion. Paved parking at an office inside Tuesday’s route is enough to start research. Advance the property when the responsible manager accepts a survey date inside a suitable work window. That appointment goes on the estimator’s calendar.
How to get striping contracts in 30 days
Run a small territory test over 30 days and track conversations through accepted proposals, giving your next list order evidence from your own sales process.
- Days 1 and 2: choose the first job type. Write down your service radius and minimum job value. Pick one opening scope, such as an existing-layout retail restripe. Set aside the crew windows you can offer this month.
- Days 3 and 4: prepare the quote sheet. Set fields for measured lines, stencils, preparation and mobilization. Add the accessible-parking field sheet. Choose who approves a revised layout and who estimates removal when the existing plan changes.
- Day 5: order the property list. Pull commercial buildings with paved parking areas in your chosen area through Ground Control, using business type and building size to narrow the search. Commercial records cost $10 to $20 per building, with a 10-building minimum, and arrive within 48 hours after payment.
- Days 7 to 10: qualify purchasing contacts. Group the file by route. Identify who handles pavement maintenance, who signs the order and when quotes are reviewed. Record a next action for each conversation. Keep contact-research add-on costs in the campaign budget.
- Days 11 to 17: book measured walks. Ask permission and send a short agenda. Measure the markings, check the applicable accessibility requirements and confirm how vehicles will be cleared. Collect the approved layout before pricing changes to it.
- Days 18 to 22: send comparable proposals. Attach the quantity schedule and a marked-up plan. Give the buyer the lot total, the work window and the person to call about revisions. Set a date for reviewing the quote together.
- Days 23 to 27: resolve the open decisions. Follow up on access arrangements, layout approval or purchasing authorization. Record the buyer’s reason for postponing or declining. Keep estimating hours against the property even when it does not close.
- Days 28 to 30: decide the next order. Count signed accounts and gross profit, then include every sales hour in acquisition cost. Put accepted jobs on the route, request a future condition-review date and expand the territory that produced the strongest accounts.
Use one stage per property. A conversation is a conversation; a requested proposal needs a scope and a review date. Keep later sealcoating opportunities attached to the same account without counting them as signed striping revenue.
A call and email for the parking lot budget owner
Ask the property manager for a defined next step, such as a measured walk before budget review, and make the request about their lot and operating window.
I would use this call opener as a script:
We stripe commercial parking lots in this area. Who handles the pavement-maintenance budget for this property? I would like to ask when you review restriping and whether you want a measured quote for the next work window.
Once you reach that person, ask about the last layout and planned surface work. Establish the approval process. An incumbent contractor need not end the conversation if the manager compares proposals at budget time or wants another crew available for a defined scope that falls outside the current provider’s schedule. Ask for the next review date.
Here is an email template to adapt after verifying the property:
Subject: Striping quote for [property address]
This is an advertisement for our commercial parking lot striping service. We can prepare a measured scope for the lot at [address], including stall lines and the accessible parking layout.
When do you review that property’s pavement-maintenance budget? If it fits your schedule, I can meet for a short walk and return a quantity sheet with the price and closure plan. Please point me to the person who approves this work if it sits with someone else.
[Sender name, business contact and valid postal address]
Reply stop if you do not want further marketing emails from us.
The FTC’s CAN-SPAM business guidance applies to business-to-business commercial email. Use accurate sender information and subject lines, identify the message as advertising and include a valid postal address and an easy opt-out. Honor opt-outs within 10 business days and keep the opt-out method working for at least 30 days after sending.
Keep the follow-up brief. Send the requested scope or confirm the agreed review date. A manager who has no budget this quarter belongs on a dated follow-up list, with the reason recorded beside the address.
Bundle restriping with sealcoating without losing margin
Offer striping as a separately priced part of a sealcoating scope, with an agreed surface-release time and responsibility for each return visit.
Ask about surface plans during the first striping walk. If the manager is reviewing sealcoating, prepare separate prices for the coating and markings, with a combined schedule. If the lot needs another pavement treatment first, get that scope decided before finalizing the striping date.
Preserve the approved layout before the surface work begins. Photograph the markings and keep a dimensioned drawing. Put responsibility for rebuilding that layout in the striping scope, with enough labor allowed for the work.
Check the paint instructions before promising the handoff. For the Fast Dry Traffic Paint cited earlier, SealMaster directs freshly sealed surfaces to cure for at least 24 hours under ideal conditions of 70°F and low humidity before painting. Use the specified coating and paint instructions to set the return date and reopening plan.
The strip-center model already includes $275 for one mobilization. If a coating sequence requires another trip, estimate that trip before offering a combined price. A shared customer does not make loading and travel free. Track those hours in job cost.
If you subcontract the striping, agree on who releases the surface for paint and who clears vehicles. Name the person accepting the finished markings. Include the same plan in both scopes. Record which contractor answers a tenant’s scheduling question on work day.
The parking lot sealcoating lead guide covers the follow-on campaign. I would approach the first buyer with the job they are ready to purchase, then put a dated pavement review on the account. Price the next service when its quantities and work window are known.
The ten-year value of a striping account
One striping property produces $3,435 in undiscounted ten-year gross profit in this model, assuming five paid visits that each earn $687 after direct costs.
For planning, place the initial visit in year 1 and repeat visits in years 3, 5, 7 and 9. Keep revenue and direct costs constant, and exclude sealcoating sales. Assume the buyer retains your crew for all five visits and pays each invoice in full, with routine condition reviews covered by general overhead. Schedule each return from the condition review and the buyer’s approval.
Project customer lifetime value means gross profit per project multiplied by the paid projects you expect to retain. Here, $687 x five visits = $3,435. With the same scope and economics at each property, the portfolio arithmetic is:
| Properties approved by one manager | Paid visits over ten years | Gross profit at $687 per visit |
|---|---|---|
| One | 5 | $3,435 |
| Two | 10 | $6,870 |
| Four | 20 | $13,740 |
After the first job is accepted, ask which other properties the manager wants quoted. Survey and price each added location. Keep its work dates and invoices separate so you can see whether the relationship is producing profitable visits.
A 10-building pilot at $20 per building costs $200 for the property file. If an account from that pilot grows to four comparable properties, its $13,740 lifetime gross profit equals 68.7 times the file cost. Put sales costs beside that number before deciding how much to spend acquiring the account.
Use the contractor customer lifetime value calculator with fewer visits if retention is uncertain. Two visits produce $1,374 per property; five produce $3,435. Your next review date and retained work belong in the account record alongside the original sale.
What does a targeted striping campaign cost?
An 80-building striping campaign costs $2,880 in this planning case, including the property file and sales labor; two signed accounts make acquisition cost $1,440 each.
Use the upper end of Ground Control’s commercial range: 80 buildings x $20 = $1,600. Add 20 hours of outreach and owner research at $40 an hour, or $800. Allow eight site walks at 1.25 hours each, including travel and estimating, at $48 an hour, or $480. The hourly allowances include payroll burden and allocated sales expenses; the field rate also includes vehicle expense. Assume existing sales tools and no additional advertising or purchased contact research. If you buy contact research, add the quoted amount before calculating CAC or ROI.
The reverse funnel starts with two accounts. At one win per three proposals, you need six proposals. If three of four walks produce proposals, book eight walks. At one walk per two conversations, you need 16 conversations, reached by talking with 20% of the 80 target accounts. The overall signed-account rate is 2.5%. Each stage rate is a planning assumption. Count one property per signed account in this campaign; the four-property expansion discussed above is a separate opportunity.
Calculate customer acquisition cost, or CAC, by dividing all acquisition spending by accounts won. Calculate lead-list ROI from gross profit after direct costs: subtract acquisition spending from account gross profit, then divide by acquisition spending. Keep the ten-year, five-visit assumption from the account model for this sensitivity table. Hold the $2,880 campaign budget constant across outcomes and round ROI percentages to one decimal place.
| Outcome from 80 buildings | Accounts signed | Acquisition cost per account | Ten-year gross profit | Profit after $2,880 acquisition spend | Lead-list ROI |
|---|---|---|---|---|---|
| Low | 1 | $2,880 | $3,435 | $555 | 19.3% |
| Base | 2 | $1,440 | $6,870 | $3,990 | 138.5% |
| High | 3 | $960 | $10,305 | $7,425 | 257.8% |
Now test the value of better fit against the same 30 sales hours. Suppose a broad list produces eight conversations leading to four walks. Three proposals follow; one account signs. Use the same 20 hours at $40 and ten hours at $48, spending the five field hours left after those four walks on qualification and follow-up. With no purchased file, its labor cost is $1,280 and its ten-year profit after acquisition is $2,155. The targeted case signs twice as many accounts in those hours and leaves $3,990, an additional $1,835 after paying for the file.
That comparison also shows the cash requirement: $1,440 of acquisition cost exceeds the first job’s $687 gross profit. I would run this campaign for retained maintenance accounts and start with a smaller pilot while the follow-up book develops. One wasted 1.25-hour site walk consumes $60 of the field budget.
Test your own proposal rate and retention in the lead-list ROI calculator. Expand when signed work and available cash support the next order. Count the hours spent on declined quotes, too.
Public parking lot striping bids
City, county and school parking work belongs in a separate bid pipeline, where the published scope and submission dates determine your next estimating task.
Find trade-and-area jobs with Bid Control by PorchRocket for public paving opportunities, which brings bid papers and addenda together with due dates. Review the specified marking material and quantities. Check site-visit instructions and the access schedule before committing estimate time. Bid Builder guides the forms; Bid Team works the estimate and packet with you. You make the final call on your number, sign and send. The public paving contract guide covers the purchasing process alongside your private-property campaign.
Build a striping territory with Ground Control
The fastest way to build a parking lot striping target list is Ground Control by PorchRocket: select commercial properties with paved parking areas by business type and building size in your territory. Commercial records cost $10 to $20 per building, with orders from 10 buildings. The file arrives within 48 hours after payment. Ground Control sends properties it is 90%+ sure match and credits a wrong match within 30 days. These are target properties whose owners have not requested quotes; your team starts the conversation. Add owner information or decision-maker research when you want contact help.
For a striping campaign, you receive or choose:
- A territory based on the areas where you want to sell and schedule work.
- Commercial property selections such as retail or office, with the building-size band you choose.
- Properties with visible paved parking areas, each carrying the reason it matched.
- Owner information and decision-maker contact as priced add-ons, with no charge for a contact that is not found.
- CSV and Excel files you can load into your sales process and group by route.
- The exact order price before payment, with delivery and the wrong-match credit terms stated above.
Start with a compact striping territory and put the first measured walks on your calendar.
Quick answers
What is the best way to get parking lot striping leads?
Start with commercial properties that have paved parking areas inside a manageable service area. Ground Control finds matching buildings for $10 to $20 each. Identify the pavement budget owner, offer a measured scope and record the next review date. Prioritize nearby lots where your crew can meet the required access schedule.
How much do parking lot striping leads cost in 2026?
Ground Control commercial property records cost $10 to $20 per building, with a minimum order of 10 buildings. Owner information and decision-maker research are add-ons. Budget outreach and site-walk time separately, then divide the full acquisition spend by signed accounts to compare the cost of different lead sources.
Should I price striping per stall or per linear foot?
Use measured linear feet for your estimate and a per-stall summary when the layout is consistent. Count shared lines once. State line width, material and coat count, then add preparation, mobilization and specialty markings separately. New layouts and removal of old markings need their own priced scope.
How many ADA parking spaces does an 84-space lot need?
Four accessible spaces, including at least one van-accessible space, are required for a typical 84-space retail parking facility under Table 208.2 of the 2010 ADA Standards. Calculate each parking facility separately. Certain health-care and residential facilities have different scoping requirements, so establish the facility's use before applying the table.
Does restriping a parking lot trigger ADA requirements?
Yes. The Department of Justice says businesses and state or local governments restriping parking facilities must provide accessible parking under the 2010 Standards. The Access Board distinguishes repainting a few existing spaces in place as normal maintenance unless usability is affected. Define whether the scope is touch-up, full restriping or a layout alteration.
How often should a commercial parking lot be restriped?
Use a condition review rather than promising the same repaint interval for every lot. Schedule an annual inspection as a starting service plan, photograph the markings and move the work date forward when visibility or the approved layout needs attention. Agree on the next inspection date when the first job is accepted.
Can I get striping work from sealcoating contractors?
Yes. Offer a defined subcontract scope with quantities, the approved layout and a weather-dependent return date after the coating is ready for paint. Agree on who clears vehicles, supplies signs and accepts the finished work. Keep the striping price visible so an extra mobilization does not disappear inside the bundle.
Where can I find public parking lot striping contracts?
Use Bid Control for city, county and school opportunities in your trade and area. Review the bid papers for material, quantities, access windows and submission requirements before estimating. Compare lot markings with the work your crew performs, then follow the buyer's stated process and addenda through the deadline.
Sources used in this guide
Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.
- ADA Compliance Brief: Restriping Parking SpacesU.S. Department of Justice: Accessible parking obligations when restriping, van spaces and facility-specific counts; checked November 2026.
- 2010 ADA Standards, Chapter 2, Section 208U.S. Access Board: Table 208.2, van-space scoping and separate requirements for certain health-care and residential facilities; checked November 2026.
- 2010 ADA Standards, Section 502U.S. Access Board: Accessible space and aisle dimensions, slopes, van clearance and signs; checked November 2026.
- Guide to the ADA Standards: Parking SpacesU.S. Access Board: Maintenance versus alterations, connecting routes and parking-sign guidance; checked November 2026.
- Fast Dry Traffic Paint application instructionsSealMaster: Clean, dry surface requirement, temperature limits and cure time after sealcoating; checked November 2026.
- Fire Code of the City of McKinney, Section 503.3City of McKinney: Current local example of fire-lane stripe width, lettering and spacing in the code effective October 1, 2025; checked November 2026.
- McKinney Fire Code adoption and effective datesCity of McKinney: Council adoption on August 19, 2025, and effective date of October 1, 2025; checked November 2026.
- CAN-SPAM Act: A Compliance Guide for BusinessFederal Trade Commission: Business-to-business commercial email requirements, sender identification and opt-out handling; checked November 2026.
Put the right parking lots on your next route.
Choose your area and property types. Ground Control sends buildings with paved parking areas and the reason each matched, within 48 hours after payment.