How to Get Commercial Paving Contracts With Two Prospect Lists
Build a private-lot prospect list and a public-bid list that fit the same crew. Learn which properties to approach, who approves the work and how to price the relationship beyond the first repave.
Get commercial paving contracts by working two lists: private properties with paved parking areas and public buyers advertising work your crew can perform. For private work, identify the person who controls the pavement budget, arrange a site walk and offer a measured scope with a closure plan. Ground Control by PorchRocket finds matching properties by area, business type and visible paved parking areas. For public work, use Bid Control to find paving opportunities, then check capacity, bonds and submission requirements before estimating.
What matters most
- Ground Control commercial lists cost $10 to $20 per building, with orders starting at 10 buildings and delivery within 48 hours after payment.
- Paving and concrete work appeared on 2,638 of 11,153 Texas board records in PorchRocket's Bid Control data (October 2026), a calculated 23.7% share.
- Across 156 recorded paving and concrete work awards, the median was $474,502 and 40.4% were below $250,000.
- Texas municipalities generally face the purchasing requirements in Section 252.021 above $100,000, following the September 1, 2025 change.
- The five-year account illustration starts with a $101,600 overlay and tests acquisition cost against $24,384 in first-job contribution.
For an 80,000 square foot lot, a mill-and-overlay cost illustration comes to $88,889 to $106,667, rounded to whole dollars, using the $10 to $12 per square yard range on Columbia’s pavement-management page. Divide 80,000 by 9 to convert square feet to square yards, then multiply by each rate.
Using a reconstruction multiplier of four to five, based on Hastings’ 2026 cost comparison, produces roughly $355,556 to $533,333 for reconstruction. These combined municipal benchmarks show the budget gap; they are not a 2026 private-lot price survey. Build each quote from the inspected scope and local costs. The sales opportunity starts with finding owners who can plan that decision before the pavement dictates it.
I would build two prospect lists around that work. Ground Control by PorchRocket supplies private properties that fit your territory and visible pavement criteria. Bid Control by PorchRocket handles the public opportunity search. One list starts with a property and a conversation. The other starts with an advertised scope and a deadline. Both should feed the same crew calendar.
Private lots and public paving bids compared
Private lots start with a budget conversation and negotiated scope; public paving jobs start with published requirements, bid security and a submission deadline.
For private work, I would lead with the owner’s operational problem: getting tenants parked, keeping deliveries moving or planning a capital expense. For public work, start with the specified work and decide whether your crew can perform it profitably within the contract window.
Use the comparison below to screen a job before spending estimating time.
| Decision | Private commercial lots | Public paving bids |
|---|---|---|
| Job size | Select a patch package, one lot or several properties within your capacity | Read the whole bid schedule, including alternates and estimated quantities |
| Margin | Price the agreed phasing, access and reporting burden | Cost every pay item and check what its measurement includes |
| Payment | Negotiate billing milestones and identify the entity paying | Read payment applications, retainage and the governing payment rules |
| Paperwork | Obtain vendor approval and a signed scope | Assemble the required forms, security and addendum acknowledgments |
| Seasonality | Ask which closure dates the owner can offer | Check the notice to proceed, allowed working days and final deadline |
| Repeat work | Schedule condition reviews and budget discussions | Track future solicitations and any awarded term-contract orders |
A negotiated private price does not guarantee a better margin. If a retail owner needs four separate closures, price every equipment move and the hours lost between work areas before comparing the job with a public site that your crew could pave in one continuous operation. Put each mobilization on the estimate.
A public award amount cannot pay this week’s fuel bill. Before accepting a job from either channel, put the payroll dates and supplier bills beside expected collections so you can see how much cash the business must carry while the crew is already working on the next site.
I would start with a small number of suitable private accounts alongside carefully selected public bids. An owner with one estimator should not accept unlimited site walks while that same person is preparing a time-sensitive bid packet. Give each channel a fixed place in the weekly schedule.
Which private properties belong on a paving list?
Retail centers, offices, medical properties, churches, multifamily buildings and industrial sites belong on the first list when their paved areas match your equipment and service radius.
Choose work you can deliver. Before approaching a warehouse with a truck yard or an office with passenger-car parking, write down the pavement materials your crew handles and the repair methods you can offer, then build a separate opening conversation for each property type.
| Property type | What I would investigate first | Buying question to resolve |
|---|---|---|
| Retail center | Entrances, storefront access and delivery paths | Who coordinates closures across the tenants? |
| Office building | Occupied parking areas and available work windows | Can any portion close during ordinary working hours? |
| Medical property | Patient drop-off and accessible routes | Who approves a temporary access arrangement? |
| Church | The event calendar and separate parking areas | Which person or committee approves the expenditure? |
| Multifamily | Resident vehicle relocation and visitor parking | Who issues notices and handles vehicles left in the work area? |
| Industrial yard | Dock approaches, turning areas and pavement transitions | Which routes must remain available to loaded trucks? |
Treat those questions as a reason to contact the property. Ask for the lot’s installation date and last resurfacing date; if the owner has drawings or repair invoices, use them to check the reported history before treating an age estimate as a reason to propose work. Write down where the date came from.
I would rank recurring trouble above an unsupported age estimate. If the manager reports that the same patch has failed twice or that trucks cannot use a loading area after rain, ask to inspect that location and mark your photographs on a plan so the estimator can investigate the cause. A distant image cannot settle that decision.
The Asphalt Paving Handbook’s preparation guidance explains why: failed pavement and base areas need repair before an overlay, with drainage addressed where necessary. New asphalt over an unresolved failure does not settle the underlying scope question.
Keep maintenance prospects on the list too. FHWA’s preservation guidance describes work that sustains or improves condition and generally does not add structural value. Apply that distinction when discussing a surface treatment versus a structural repair.
For a concrete paving crew, build a separate offer around the work you perform, such as slab replacement or curb repair. Do not attach asphalt sealcoating revenue to that account model. The parking lot sealcoating prospecting guide covers a narrower asphalt maintenance campaign.
Who approves a parking lot paving contract?
Start with the property manager or facilities contact, then identify the owner or authorized representative who can approve the pavement budget and sign.
Start with the property manager or facilities contact. Ask who is responsible for the specific paved area. A building address is only the starting point; you need to know which organization will buy the work and whose name belongs on the agreement.
I would ask four questions before sending an estimator:
- Who approves repairs, and who approves a larger repaving project?
- Is the owner collecting budget information or choosing a contractor now?
- Does the purchasing process require three quotes, another number of quotes or an approved vendor list?
- When does the next budget decision happen?
Treat three quotes as a question about the owner’s policy. When the buyer wants competing proposals, ask for a shared scope that identifies milling and any localized base repair, because an offer that includes those operations will be priced differently from one that merely adds asphalt over the existing surface.
Ask for vendor enrollment requirements early. Send the requested coverage language to your insurer with the buyer’s vendor form, then gather the tax paperwork and references after checking that each reference describes work your crew performed and that the customer permits you to discuss it. Keep that file ready for the next invitation.
I would also ask how the manager wants the decision presented. Some need a single replacement proposal. Others want repair work separated from a later capital project. Offer those alternatives only when your inspection supports them, and identify what each option leaves for later.
Agree on the deliverable before starting a takeoff. If the manager needs a repair plan to present at an owner’s budget meeting, confirm the required level of detail and the date of that meeting before spending hours pricing a replacement project nobody has authorized the manager to pursue. Put the reviewer and delivery date on the estimating calendar.
After sending the proposal, ask about the remaining approval step. A bid sitting with the owner needs a different follow-up from a proposal awaiting a second contractor’s estimate. Record the buyer’s answer in plain language. A status such as “capital meeting on December 8” gives your office more direction than “warm lead.”
Build the private list around pavement and access
Start with one manageable territory and visible paved parking areas, then use business type and building size to narrow the properties your estimator will review.
For a first commercial-property search, I would choose the territory from your production constraints. Plot the route from the asphalt supply point to each group of properties and consider where the equipment will move afterward, especially when two addresses inside the same county require very different truck trips. Check the route before expanding the radius.
Set the paved-parking filter first. Add retail or office properties if those are the lots your crew handles. Industrial yards and loading docks can help narrow a truck-oriented campaign. Ask about traffic demands when you reach the buyer.
Building size helps narrow the property mix. A 25,000+ square foot building filter might fit one campaign, while a crew serving larger industrial accounts might begin at 50,000+. Choose the band for the kind of account you want. Obtain pavement measurements separately during the site visit or from suitable owner plans.
Keep the requested filters and the later sales findings in different columns:
- Property address, business type and the reason the building matched.
- Owner and decision-maker information, when ordered and found.
- The buyer’s reported pavement history and budget timing.
- Measured work area, proposed scope and estimating status after the site walk.
That separation prevents an unverified sales note from looking like a property-record fact. It also gives the next person in the office a clear place to add information.
I would qualify buying responsibility and timing before dispatching the estimator. If one manager controls several suitable properties, ask whether the proposed conversation should cover the portfolio. Keep an address-level record for each lot, but avoid sending the same person several unrelated introductions in a week.
Start with 10 buildings if that is what your office can work properly. Before ordering more, assign someone to contact the accounts and keep the response history; otherwise the estimator inherits a spreadsheet of addresses with no record of who has been called or why a visit is scheduled. For several markets or a requirement beyond the listed filters, use Ground Control’s custom-request option.
The first list should teach you which properties deserve a second conversation. Track reasons for rejection: unsuitable work, no buying responsibility, an unavailable construction window or a project outside your capacity. Use those findings to tighten the next order.
Patch, overlay or reconstruct one 80,000 square foot lot
An overlay needs sound support beneath it; inspect localized failures and base condition before offering surface repairs or a full reconstruction.
For the worked examples that follow, say a five-person asphalt crew near Columbia is assessing an 80,000 square foot retail lot. Job prices, production allowances and sales outcomes are assumptions for this illustration.
Use the opening municipal comparison to understand scale, then build the owner’s quote from your costs. The sample uses the stated quantities and assumes ordinary access; it excludes separate drainage redesign, utility relocation or accessibility reconstruction. Price those items separately if the survey identifies them. The treatment rows are alternatives, not charges to add together.
| Possible scope | Assumed pricing basis | Arithmetic | Sample amount |
|---|---|---|---|
| Localized asphalt patching | 3,600 square feet at $7.40 | 3,600 × $7.40 | $26,640 |
| Mill and overlay | Entire lot at $11.43 per square yard | 80,000 ÷ 9 × $11.43 | $101,600 |
| Full pavement reconstruction | Entire lot at $49.23 per square yard | 80,000 ÷ 9 × $49.23 | $437,600 |
| Later sealcoating, if appropriate | Entire lot at $0.27 per square foot | 80,000 × $0.27 | $21,600 |
The $11.43 overlay rate falls inside the opening street-work range. Build your quote from the pavement section and material quantities, then cost trucking and milling against the work sequence. Include labor burden and equipment cost. At a $101,600 selling price and assumed direct costs of $77,216, contribution is $24,384, or 24% of revenue. Adding a 24% markup to those costs would produce $95,747.84 and a different margin. Divide costs by 0.76 when the target contribution margin is 24%.
Take a phase plan to the site. Mark the paver’s entrance and truck waiting area, then walk the route the owner needs to keep open while your crew works. Measure the work limits. If milling exposes more failed base than the estimate allows, the foreman needs an agreed way to document it and obtain approval, so put that procedure beside the extra-work price before the owner signs.
Give accessibility its own review. Under the U.S. Access Board’s parking guidance, resurfacing and resealing constitute alterations that must include the required accessible spaces. Sections 208 and 502 of the 2010 ADA Standards address scoping and technical requirements. Accessible spaces and their access aisles have a maximum slope of 1:48 under Section 502.4. Verify grades and the proposed layout before carrying forward the old stripes.
After repaving, schedule condition reviews. The Asphalt Institute’s engineering FAQs say well-designed and well-built low-traffic pavement generally should not require sealing for approximately two to five years, depending on climate and workmanship. That is a reason to inspect before selling the next application.
The proposal should identify the accepted pavement design and work limits. State the reopening requirements separately. An owner should be able to see which decision increases the bill and who can authorize it.
What is one paving account worth over five years?
The retail-lot model yields $152,500 over five years at full retention, or $134,685 when later scopes receive a 65% probability.
Continue the retail-lot illustration with the overlay option. Assume the owner approves a $3,780 localized repair in year 2, a $21,600 sealcoat in year 3, $3,920 of crack work in year 4 and another $21,600 sealcoat in year 5. Set the inspection dates in the account calendar and obtain approval for the work they support.
The follow-on total is $3,780 + $21,600 + $3,920 + $21,600 = $50,900. At full retention, five-year revenue is $101,600 + $50,900 = $152,500.
For the forecast, assign a 65% chance to each later scope after the first job has been signed. Expected follow-on revenue becomes $50,900 × 0.65 = $33,085. Add the first job and the model reaches $134,685, before discounting future dollars.
At an assumed 24% contribution margin after direct job costs, that is $134,685 × 0.24 = $32,324.40. Acquisition cost and office overhead still have to come out before tax. Use different margins for different services when your cost records support them. A sealcoating job and a milling job do not need to carry the same assumption.
Test the downside too. If the first job produces no repeat work, its modeled contribution is $101,600 × 0.24 = $24,384. The acquisition decision still has to make sense against that number.
Keep dated photos with the measured repair areas in the account file. Ask when the owner prepares the following year’s budget and agree on an inspection date that leaves enough time to scope any needed work before that decision, rather than calling after the budget has already been approved. Leave unsigned work out of the backlog.
What public buyers purchase, and how large the awards are
Cities, counties and school districts buy street overlays, parking-lot repaving and term work; Bid Control’s recorded paving awards had a $474,502 median across 156 awards.
Paving and concrete work represented a calculated 23.7% of Texas board records in PorchRocket’s Bid Control data (October 2026), giving this trade a substantial public-work search pool.
That share is 2,638 trade-tagged records divided by 11,153 Texas board records. It describes the October inventory, including past opportunities, rather than jobs still open on November 4. Trade tags can overlap. Count a matching notice once in your own pipeline.
In the separate multistate award sample, the median paving and concrete work award was $474,502 across 156 awards, and 40.4% were below $250,000. The award analysis retained recorded amounts from $1,000 to $200 million. These figures describe the records available, not every paving award nationwide.
Search city purchasing pages for street overlays or patching packages. Look at counties for road maintenance and paving work. School districts are another search target for parking lots or bus-area projects. Add curb work and pavement markings if your crew or established subcontractors perform them. Search for the work description as well as the word “paving.”
Separate installed work from material supply. A notice asking for asphalt delivered to an agency’s crew deserves a different estimate from one asking you to mill, pave and reopen the road. Underline the scope verbs before looking at the advertised quantities.
For a term contract, read how orders are issued and whether the buyer guarantees a minimum quantity. I would reserve production time only against an authorized order or another enforceable scheduling commitment. An estimated annual quantity is a planning input until the contract tells you otherwise.
Texas buyers also need a current purchasing-rule check. As of November 2026, Local Government Code Section 252.021 generally triggers its purchasing requirements when a municipality will spend more than $100,000. The 2025 amendment raised the threshold from $50,000 effective September 1, 2025. The statute provides permitted methods and exemptions; that municipal threshold does not govern every county or school purchase.
Read smaller notices just as closely. Before assigning an estimator, check the purchasing method and qualifications in the solicitation alongside the deadline, then decide whether the office has enough time to prepare the required response while keeping its existing proposals moving. The public paving contracts guide works through unit-price schedules and quantity risk.
Bonds, insurance and the bid packet
Arrange project-specific bond and insurance reviews before estimating deeply: 92.1% of 355 reviewed Texas paving and concrete work packets in PorchRocket’s October 2026 data required a bid bond.
Use that packet sample to prepare the surety conversation, then read the security clause on the bid in front of you for its required form and acceptable delivery method.
Bid security and the bonds supplied after award answer different requirements. Under Texas Government Code Section 2253.021, a covered public-work contract requires a performance bond above $100,000. The payment-bond threshold is above $25,000 for most covered governmental entities, or above $50,000 for municipalities and qualifying joint boards. The required performance and payment bonds are each in the contract amount.
Send the surety agent the owner forms and your estimated contract range. Include the proposed schedule alongside existing commitments. Ask whether the agent can support both the bid and the final bonds. The bid bond guide explains the process and the distinction between a bond’s face amount and its premium.
Get the insurance review started too. Send the solicitation’s coverage limits and endorsement wording to your agent along with its subcontractor provisions, and ask the agent to identify any change needed before you promise the buyer that your existing policy meets the contract. Keep the response with the bid file.
Use a short packet checklist with an assigned owner for every item:
- Confirm the mandatory meeting or site visit, including its attendance record.
- Check every pay-item unit and enter each requested price.
- Read all addenda and use any replacement forms.
- Arrange the specified bid security, signatures and notarization.
- Review wage schedules and payroll documentation wherever the packet requires them.
- Test portal access and save the submission receipt before the deadline.
Carry the payment process into the cash plan. Under Texas Government Code Section 2251.021, the general clock makes payment overdue on day 31 after the latest applicable receipt of goods, completion of services or receipt of the invoice. Certain political subdivisions meeting monthly or less often have a day-46 rule. Read the applicable terms and any dispute provisions before assuming a collection date.
For estimating discipline, use the government bid pricing guide to connect direct costs with overhead and margin. A requirement that consumes crew or office time belongs in the cost model even when the bid schedule has no separate line for it.
The last review should compare the submitted files with the buyer’s checklist. Have a second person check the final number and attachments when possible. Save the version submitted. Your office needs a record of exactly what left the door.
One paving season, two sources of work
Use awarded public work with confirmed dates as the production base, then fit approved private jobs into the remaining crew days with room for weather and repairs.
A submitted bid does not book the crew. I would keep it in the estimating pipeline until the buyer awards the work, then confirm the required authorization to start before treating a particular week as committed or offering that same week to a private property owner. Mark released work separately.
For the sample crew, assume a 20-day production month. Reserve 10 days for an awarded public job, 4 for an approved retail-lot project, 3 for smaller private repairs and 3 as weather or equipment allowance. The total is 20 days. Keep the allowance available until the scheduled work has cleared its weather and equipment risks.
| Calendar allocation | Assumed crew days | What must be resolved before release |
|---|---|---|
| Awarded public paving | 10 | Start authorization, work limits and required traffic arrangements |
| Approved private lot | 4 | Signed scope, vehicle relocation and closure dates |
| Smaller private repairs | 3 | Confirmed quantities and grouped equipment moves |
| Weather or equipment allowance | 3 | Reassign only when the preceding work is secure |
Private lots fill a gap only when the owner has agreed to the available window. Get that agreement before carrying the work as flexible. A medical property with one acceptable closure date has to be scheduled against that date.
Put subcontractors on the same calendar. If the milling crew cannot arrive until Thursday, check what your paving crew can do on Wednesday and confirm that the revised sequence still leaves time for the specified testing and striping before the owner’s agreed reopening date. Resolve that conflict before dispatch.
I would plan cash beside days. Assume the month’s direct cash outlays include $42,600 for mix and trucking, $18,900 for payroll and $9,700 for equipment and subcontract services. That totals $71,200. If only $20,000 will be collected before those bills are due, the remaining requirement is $51,200. Confirm how the business will fund it before accepting another job in that window.
Public bidding needs office time ahead of production. In PorchRocket’s October 2026 Texas records, 1,651 paving and concrete work solicitations with qualifying dates gave a median of 26 calendar days from posting to deadline. That is the advertised window, not the time left after you find the notice.
At the weekly scheduling meeting, review the next two weeks of production and the next month’s estimating commitments. Remove dates that depend on an unsigned agreement. Put the next required action beside each remaining job, with one person responsible for it.
Property manager outreach that earns a site walk
Ask for permission to discuss a named property’s pavement budget and work window, then offer one defined next step that matches the buyer’s stage.
The first call should establish responsibility. Keep the sales claim small enough to support with what you know. Use the following templates for your own outreach.
I am calling about the parking area at [property address]. Our crew handles [work you perform] in [service area]. Who manages pavement repairs and repaving budgets for that property? If that is you, are you gathering a future budget or choosing a contractor for planned work?
If the manager is budgeting, offer a scoped site walk and ask what the owner needs for the decision. If the work is already specified, request the documents and check whether your company can meet the schedule before volunteering a price.
An email can make the same request without pretending you found a defect:
Subject: Pavement planning for [property address]
Hello [role or verified contact],
Our paving crew serves [territory] and handles [specific services]. I am checking who coordinates parking-area repairs and repaving at [property address].
If you are planning work, I can arrange a site walk to define repair areas and possible construction phases. We would first confirm your access requirements and the information needed for the budget decision.
Is there a vendor approval process or a planned quote date we should follow?
[Sender and business details]
Advertisement from [business]. [Business mailing address]. To stop marketing emails from us, reply “stop.”
Use a working opt-out process. The FTC’s commercial-email guide requires accurate sender information and subject lines, clear advertising identification, a valid postal address and an easy opt-out. Honor opt-outs within 10 business days and keep the mechanism working for at least 30 days after sending. Record suppression requests so another person in the office does not restart the sequence.
When a manager already has a paving contractor, I would ask about backup capacity or the next scheduled bidding opportunity. Do not manufacture urgency from an aerial image. Offer only work your crew is prepared to inspect and price.
After a site walk, send the agreed deliverable and a decision date. If the owner is postponing the project, ask permission to return at budget time. If the work is going elsewhere, record the reason when the buyer will share it. “Needed overnight work” is a reason to change your targeting or offer. “No reply” is a different problem.
Measure cost per signed account before expanding
Compare signed accounts against all prospecting costs, including estimating hours, because a cheap address becomes expensive when it sends a skilled estimator to an unsuitable property.
For the sales comparison, assume the office has 100 hours available at a loaded cost of $52 an hour. Value the owner’s estimating time at that rate too. Assume a wasted visit consumes 1.75 hours and $24 of travel expense. Its cost is 1.75 × $52 + $24 = $115 before any detailed takeoff.
Losing 12 visits that way costs $1,380 and uses 21 of the available hours. Those are hours that cannot also be spent reviewing suitable sites or preparing public bids.
Now compare two campaigns using the same 100-hour labor budget. Assume both begin with 100 prospects. The broad campaign’s list costs $200, while the property-filtered campaign budgets $20 for each of 100 Ground Control buildings, or $2,000. Neither scenario purchases contact add-ons. Both include manual contact research within the 100 hours.
| Campaign assumption | Broad address list | Property-filtered list |
|---|---|---|
| Prospects worked | 100 | 100 |
| Labor cost, 100 hours × $52 | $5,200 | $5,200 |
| List cost | $200 | $2,000 |
| Travel and incidental expense | $600 | $360 |
| Total acquisition spend | $6,000 | $7,560 |
| Signed accounts, assumed | 2 | 3 |
| Prospect-to-account rate | 2% | 3% |
| Cost per signed account | $3,000 | $2,520 |
The filtered campaign spends $1,560 more and assumes one additional account from the same labor hours. Under those assumptions, cost per signed account falls by $480. The extra account raises account output by 50%, while cost per account falls by 16%: $480 ÷ $3,000. Track both measures alongside total contribution.
If the filtered campaign also signs only two accounts, its cost becomes $7,560 ÷ 2 = $3,780 each. That outcome would call for a review of the property selection and sales process before a larger purchase.
Against the earlier first-job contribution of $24,384, acquisition at $2,520 leaves $21,864 before office overhead and tax. Acquisition at $3,780 leaves $20,604. Use the contribution of the job you signed; a small repair order cannot support the acquisition allowance of a full-lot overlay.
Count qualified conversations and authorized site walks separately from proposals. Then count signed accounts. When a campaign ends with suitable properties but few conversations with the people who approve the work, review the contact research and opening message before concluding that your paving price is the reason the campaign failed. Check where the hours went.
The fastest way to find lots that fit
Ground Control by PorchRocket finds commercial paving prospects by territory, business type and visible paved parking areas, with delivery within 48 hours after payment, often sooner. Add industrial yards or loading docks for truck-oriented properties, and building-size bands to narrow the search. Buildings cost $10 to $20 each, with orders starting at 10; owner information and decision-maker research are paid add-ons. Each property says why it matched. Request a credit for a wrong match within 30 days. This is a target list of properties whose owners have not asked for quotes. Start the buying conversation, then measure the proposed work during an authorized visit.
I would place the first parking-property order only as large as the office can follow up, then adjust the filters using the reasons prospects qualify or drop out.
Keep public paving opportunities in Bid Control
Bid Control keeps the public list moving alongside your private outreach by organizing paving opportunities and their bid documents around your trade and area.
Use Bid Control for paving contractors and the Texas paving bid listings to begin that search. Bid Board brings opportunities and past results together; Bid Builder adds guided forms using your company file. Bid Team works through the paperwork with you, and you make the final call on your number, sign and send. A 15-minute conversation with Rafael can focus on the job sizes and production windows your crew wants. Keep the public search tied to that capacity.
Two lists, one crew: Ground Control for private lots
Ground Control gives your office a defined private prospect list to qualify before sending the estimator out for a site walk.
For a paving order, I would ask for the territory and property mix the crew can serve this season. Then check the delivered file against that request before assigning outreach.
- Buildings with visible paved parking areas in the area you selected.
- Business-type and building-size filters suited to your target accounts, with industrial yards or loading docks when requested.
- A reason each property matched, so the office can explain why it belongs on the list.
- Owner information and decision-maker contacts when ordered and found, with no charge for a contact that is not found.
- CSV and Excel files that load into the sales process you already use.
- Properties held to Ground Control’s 90%+ match-confidence standard, with a wrong-match credit available within 30 days.
Put those accounts beside the public opportunities your crew can bid. Assign a next action and an owner to each record, and let approved work earn its place on the production calendar.
Build both lists around the work your crew can price confidently and deliver profitably.
Quick answers
What is the best way to get commercial paving contracts?
Start with private properties that have pavement your crew can service and public bids whose scope fits your equipment and finances. Confirm buying authority before a private site visit. For public work, review the bid packet before estimating. Ground Control supplies matching property prospects; Bid Control brings public opportunities and their documents together.
How much do commercial asphalt paving leads cost?
Ground Control charges $10 to $20 per commercial building, with orders starting at 10 buildings. Owner information and decision-maker research cost extra. These are property prospects, so include your own outreach and estimating costs when calculating cost per signed account. The file arrives within 48 hours after payment, often sooner.
Who should I contact about repaving a commercial parking lot?
Ask the property manager or facilities contact who controls the pavement budget and who signs a repaving agreement. Confirm whether the owner, tenant or another entity is responsible for the specific paved area. Request the vendor approval requirements and budget calendar before preparing a detailed proposal. A manager's interest alone does not establish spending authority.
Does a private property manager have to obtain three paving quotes?
No single three-quote rule covers every private property. Ask about that owner's purchasing policy. Find out how many proposals the buyer wants, whether the scope is already written and who compares the offers. When several contractors are quoting, request the same measured area, pavement section and access assumptions for every proposal.
How large are public paving contracts?
The median was $474,502 across 156 paving and concrete work awards in PorchRocket's October 2026 records, and 40.4% were below $250,000. Those multistate records include different scopes, so match the advertised work to your equipment. Compare the pay items, production window and working-capital needs before deciding which contract size to pursue.
Do I need a bond for a commercial paving job?
Read the owner's contract requirements. In Texas, Section 2253.021 requires a performance bond for covered public-work contracts above $100,000. Payment bonds apply above $25,000 for most covered entities or above $50,000 for municipalities and qualifying joint boards. Bid security is a separate requirement to check in the solicitation. Private owners set their own contract requirements.
How often should I offer sealcoating after repaving?
Use pavement condition and the specified product's requirements to decide. The Asphalt Institute says well-designed, well-built low-traffic pavement generally should not need sealing for approximately two to five years. Schedule a review instead of promising automatic annual sealing. Document any repair need separately so the owner can approve the appropriate work.
How do I get parking lot square footage for a paving estimate?
Measure the pavement during an authorized site visit or obtain suitable owner plans before estimating. Ground Control filters for visible paved parking areas, business type and building size. Treat building square footage as a property-selection filter. Your estimator still needs the paving limits and access conditions for the proposed work.
Sources used in this guide
Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.
- Pavement Management: treatment cost comparisonCity of Columbia, Missouri: Publishes a $10 to $12 per square yard mill-and-overlay range for streets. Used as a municipal benchmark in the opening illustration, not a 2026 private-lot price survey; checked November 2026.
- 2026 mill-and-overlay letter to homeownersCity of Hastings, Minnesota: Compares mill-and-overlay costs with full reconstruction. Its four-to-five cost factor is combined with Columbia's range as an explicitly calculated illustration; checked November 2026.
- Guidance on Highway Preservation and MaintenanceFederal Highway Administration: Current guidance distinguishes preservation from adding capacity or structural value and supersedes the 2005 definitions; checked November 2026.
- Engineering FAQs on asphalt maintenanceAsphalt Institute: Explains condition-based sealing and an approximately two-to-five-year initial wait before sealing for well-built, low-traffic pavements; checked November 2026.
- Asphalt Paving Handbook, section 5.3National Asphalt Pavement Association: Supports repairing failed pavement and base areas before overlaying, including attention to drainage; checked November 2026.
- Texas Local Government Code, Chapter 252Texas Legislature: Section 252.021 sets the municipal purchasing trigger above $100,000; the amendment took effect September 1, 2025. Checked November 2026.
- Texas Senate Bill 1173, enrolled textTexas Legislature: Sections 3 and 12 confirm the municipal threshold increase from $50,000 to $100,000 and its September 1, 2025 effective date; checked November 2026.
- Texas Government Code, Chapter 2253Texas Legislature: Section 2253.021 sets public-work performance and payment bond thresholds and amounts; checked November 2026.
- Texas Government Code, Chapter 2251Texas Legislature: Section 2251.021 explains the general payment clock and the exception for political subdivisions meeting monthly or less often; checked November 2026.
- Guide to the ADA Standards, parking spacesU.S. Access Board: Explains parking alterations, accessible space scoping and the Section 502.4 maximum slope; checked November 2026.
- CAN-SPAM Act compliance guide for businessFederal Trade Commission: Supports sender identification, advertising disclosure, postal addresses, opt-outs and the 10-business-day and 30-day deadlines. Confirmed through web search in November 2026; curl returns a 403 bot restriction.
Put suitable commercial lots in front of your estimator.
Choose your territory and the property types your paving crew serves. Ground Control returns matching buildings with paved parking areas, plus owner and decision-maker research when ordered.