Privacy choices

Choose what we may use.

The site works without optional tracking. Your choice is saved on this device and can be changed here anytime.

Necessary

Runs the site, protects forms, and remembers this privacy choice.

Always on

Solar service territories

Solar Farm Locations: Find Sites, Owners and Maintenance Work

Build a territory of utility, community and large rooftop solar sites your crew can serve. Match each location to a buyer, a dated record and a service scope worth quoting.

The short answer

Find solar farm locations with the USPVDB map and EIA-860 generator records, then check recent imagery, parcels and the organization buying maintenance. Asset Search by PorchRocket builds reviewed inventories of utility, community and large rooftop solar sites across the contiguous United States, including candidates beyond existing directories. Each site comes with dated evidence, owner information and a fits, rejects or unresolved decision. Define your service scope and drive-time limit before ordering the search.

Find solar sites

What matters most

  • EIA-860 covers plants with at least 1 MW of combined nameplate capacity; smaller solar systems need other sources.
  • USPVDB version 4.0, released April 14, 2026, contains 6,611 facilities, including ground-mounted, rooftop and canopy installations.
  • Record 3 buyer roles separately: the landowner, array owner and O&M manager can have different responsibilities.
  • The worked vegetation model produces $16,188 in annual gross profit per account and a $1,620 acquisition cost at three accounts won.
  • Asset Search returns every reviewed disposition, including rejected candidates and unresolved sites with a field check that settles the question.

A megawatt of solar represents years of service spending. DOE’s Q1-2025 PV-only utility benchmark puts annualized O&M at $20 per kWdc-year, or $20,000 per MWdc-year, in 2024 dollars. That broad cost includes field maintenance along with component replacement. Land lease, property tax, insurance and management are included too. See DOE’s benchmark files. Using 2018 and 2019 data, a separate 2023 study reports median total vegetation costs of $944 per MWdc-year for turfgrass (13 observations) and $1,658 for native vegetation (41 observations). See the vegetation cost study, Table 5.

The sales job is to locate the sites where your crew can earn its share of that spending. An electrical O&M provider needs a different territory from a mowing contractor. A panel-cleaning crew needs a different first conversation from a repowering estimator. A pin on a map does not tell any of them who controls the purchase order.

Asset Search by PorchRocket builds that territory around the work you sell. We find existing solar installations and cross-reference dated imagery with property and public records. Each returned site carries the evidence behind its decision. I would start with the service scope and the truck’s working radius before counting a single megawatt.

Utility, community and rooftop solar belong in different service lists

Separate solar prospects into at least four working groups: ground-mounted utility sites, community projects, large rooftop arrays and installations that combine solar with storage.

Use physical configuration and commercial arrangement as separate fields. DOE defines community solar by benefits flowing to multiple customers within a geographic area. It does not define the category by panel layout. You cannot reliably label a field of panels as community solar from its shape alone.

Build each list around the service your estimator can price. These are starting rules I would give the sales team:

Working group First service offer Evidence to collect before quoting Person to ask for
Ground-mounted utility PV Defined vegetation scope or scheduled electrical maintenance Array blocks, access, maintained areas and operating status Asset manager or O&M procurement lead
Community solar Local vegetation route or recurring inspection scope Program identity, operating entity and site requirements Project manager or contracted O&M lead
Large commercial rooftop Module cleaning review or rooftop PV inspection Building and array ownership, roof access and equipment records Facilities manager and solar asset manager
Solar with adjacent storage Solar scope with a separately defined storage boundary Equipment area, access restrictions and scope ownership Site O&M manager

Do not put every category into the same call queue. A vegetation company should rank ground-mounted arrays first and leave rooftop-only sites out of that campaign, while a rooftop service firm needs a list that excludes the open fields its crew cannot service. Keep the rejected category in the territory file. Save the next estimator that research.

For a mixed energy campus, connect the solar record to the battery storage site inventory. Keep the service scopes separate even when the entrance and buying organization are shared. Your proposal should say which equipment area it covers.

Installed equipment gets its own campaign. A proposed array belongs in a future handover queue with a different offer and follow-up date, because a conversation about maintaining an operating site needs different documents from a conversation about accepting a newly built one.

What does a solar O&M contract include?

A solar O&M agreement should assign four responsibilities explicitly: preventive work, performance reporting, corrective response and site upkeep, with separate allowances for work outside the recurring scope.

The DOE operating and maintenance guidance covers monitoring and preventive work, including inspections. Its government O&M procurement templates can help you structure questions for the buyer. The national cost benchmark includes spending outside a field-service contractor’s scope.

I would divide the proposal into a scheduled service sheet and a corrective-work sheet. On the scheduled sheet, give each inspection or visit a deliverable with a named person who accepts it; on the corrective sheet, explain how a finding becomes an authorized repair and who supplies the replacement parts. Price the response expectation separately.

For an electrical maintenance provider, ask for equipment documentation and the existing maintenance plan before promising a scope. For a vegetation contractor, identify who controls the cutting specification and who authorizes extra visits. A general description such as “maintain the solar farm” leaves the visit count and extra-work approval undefined.

Write down the handoff between trades. Who reports a damaged fence? Who closes a work order after the vegetation crew spots an obstruction? Who approves access when another contractor is on site? Make the reporting path part of the offer rather than leaving it to the truck driver.

Public installations have their own buying route. For solar maintenance at public buildings, Bid Control by PorchRocket finds opportunities from cities and counties as well as school districts. Bid papers stay together with deadlines and addenda. Read the solicitation to judge whether your crew can handle the scope; talk to Rafael about the public bid when the packet needs help.

Track one sales outcome per site: the next authorized buying step. That might be a scope review, a vendor application or an invitation to an annual rebid. “Called the solar farm” is too vague to forecast.

Vegetation management starts with maintained acres

Price solar vegetation work from maintained acreage and the treatment schedule, then use MWdc to compare accounts after the work is measured.

The 2023 vegetation study examined 54 sites. Its median mowing activity cost was $121 per acre-year for native vegetation (39 observations) and $203 for turfgrass (four observations). Total vegetation spending includes other activities, and the individual activity medians should not be added together. Those figures describe the study’s earlier data, rather than a current local rate card.

For a 2026 estimate, draw the maintained areas separately from the array boundary. Have the owner mark which areas require mowing and which use another treatment before the site walk, so the estimator can spend time on the slopes or tight rows that determine crew speed rather than debating the work boundary. I would mark four areas separately: under-array work, open lanes, fence edges and drainage areas.

Ask for the vegetation plan first. Get the required finished height and treatment boundaries in writing. Price a fixed visit count only after the buyer explains who can authorize extra work during a heavy growth period and how quickly that approval will reach the crew when the contracted visits have been used.

Use four estimate lines:

  • Machine work, with maintained acreage and production hours per visit.
  • Hand work, with the obstructions or edges that create it.
  • Travel and mobilization, including access coordination.
  • Reporting and return visits, with a defined acceptance process.

Keep a separate record of areas excluded from your price. If the owner wants a drainage basin handled under another agreement, retain that boundary on the site sheet. If a grazing program is present, ask which remaining tasks the buyer wants your crew to perform.

The commercial landscaping contract guide covers the account-building side of recurring grounds work. For solar, I would make the first offer a site-specific scope review with marked work areas. Bring the operator a quote they can compare line by line with the current agreement.

Cleaning, inspections and repowering need different evidence

Use imagery to locate solar equipment and prioritize investigation; use operating records and authorized inspection to decide whether a site needs cleaning, repairs or a repowering study.

For module cleaning, ask for the owner’s current method and the module instructions. Section 5.7.1 of the PV O&M best practices report recommends following manufacturer guidance and evaluating cleaning against local soiling conditions and economics. Acreage alone cannot set that schedule.

A cleaning prospect needs an owner-confirmed next step, such as a site inspection or review of the existing cleaning scope. Before preparing the price, ask where the crew can stage water and equipment and how it will reach each array block, especially when a neighboring site on your route has an entrance on a different road. Save the access answers with the site.

For inspection work, request the last inspection report and the equipment schedule. Price the defined inspection and its report. Let the findings support a separate corrective proposal. That gives the owner an approval point before the repair scope grows.

DOE distinguishes refurbishment from repowering: refurbishment addresses deficiencies through inspection and repair, while repowering installs new modules and inverters. An older installation is a prospect to investigate, not an automatic replacement job.

I would rank repowering candidates using the documented operating year alongside equipment records. Ask the owner for production history and the date of its next capital review before sending an estimator to price replacement, because the first buying decision is whether to commission an assessment of the existing system. Get that assessment scope approved first.

Connect those records to an installed base map if you sell through a service network. Preserve the original installation and later expansion dates separately. A newer block beside an older array should not inherit the older equipment’s age in your campaign.

Where to find solar farm locations in 2026

Start with USPVDB for mapped arrays, annual EIA-860 for plant and generator records, and monthly EIA-860M for more recent status changes.

The USPVDB download page provides locations and array boundaries for PV facilities with capacity of at least 1 MW. Choose a tabular file or GIS format. Its April 14, 2026 version 4.0 memo reports 6,611 facilities. That release added rooftop and canopy systems as well as ground-mounted arrays.

As of November 5, 2026, the annual EIA-860 page provides 2025 data. The monthly EIA-860M page lists September 2026 inventory, released October 23, 2026. Record both the period covered and the publication date when importing either file.

Source What to take into your working file Coverage or timing check Next action
USPVDB Mapped location, array geometry and published attributes Check version and each site’s evidence date Review the physical site and service boundary
Annual EIA-860 Plant and generator IDs, operating status, capacity and ownership records Plants have at least 1 MW combined nameplate capacity Join plant, generator and applicable owner files
Monthly EIA-860M Current or proposed unit status updates Preliminary monthly inventory can be corrected Update the follow-up queue without discarding prior status
Local planning or program records Documents tied to a named site Confirm whether the document describes a proposal or installed work Match the address and parcel to dated imagery
Reviewed imagery and property records Visible installation, parcel relationship and observed changes Save the image date and unresolved questions Locate the organization buying your service

If you are choosing a region, the version 4.0 memo offers a starting comparison: California has 893 listed facilities, North Carolina 760, New York 637 and Minnesota 524. Those are facility counts in that release, not a ranking of service revenue or every rooftop system.

I would export the county or territory records before researching individual contacts. Retain the original source IDs so you can join later updates without rebuilding the list. Use a second field for your own site ID when several public records describe the same service location.

What EIA-860 and USPVDB leave for you to verify

Public solar inventories give you a starting population; they still need checks for smaller systems, recent changes, distinct service sites and the person who controls the work.

EIA’s 1 MW threshold applies to combined plant nameplate capacity, rather than a universal minimum size for every individual generator. Its annual files separate status groups: operable, proposed, and retired or canceled. The Operable tab also includes standby and out-of-service generators, so check the individual status before calling. The EIA-860 file descriptions explain that the owner file covers shared ownership and generators owned by someone other than the operator. A generator absent from that file is wholly owned by its operator in the reporting data. Start with the plant and operator records, then join any separate ownership entries.

USGS states that USPVDB has a publication lag tied to underlying data and that its records are not field verified. An array polygon also answers a different question from a vegetation takeoff. I would use it to locate the installation, then build the service boundary around the buyer’s work specification.

For the smaller and rooftop market, Berkeley Lab’s August 2026 distributed solar update contains roughly 5.3 million systems installed through 2025. Its scope includes rooftops on homes and nonresidential buildings, along with ground-mounted systems up to 5 MWac. Check the public file’s fields against your task before treating it as an owner-contact list.

Keep AC and DC capacity separate. DOE’s benchmark description distinguishes the module rating from inverter AC output. When you compare a per-MW service budget across sites, preserve the capacity basis beside every number and leave an unknown basis unresolved until a source establishes it; a spreadsheet should never quietly relabel MWac as MWdc.

Deduplicate at the level where you sell. Several generators can share a site visit. One owner can buy service for several sites. Preserve those relationships instead of counting every generator row as a new account or merging a whole portfolio into one unpriced stop.

A missing record deserves a documented search. Give the reviewer the parcel and candidate location, then ask whether dated evidence shows an installed array. Return the answer with a reason. “No match in this database” should stay distinct from “no solar installation observed.”

How to find solar farms near me by driving time

Build a solar service territory from the authorized entrance and your drive-time limit; use the USPVDB location control to identify nearby candidates before planning routes.

The USPVDB map help documents current-location search and filters for project attributes. Start there for a quick view of surrounding installations. Then place your shop and the candidate entrances on a road map.

I would set two travel bands. The inner band covers recurring visits that fit a normal working day; the outer band requires enough work or nearby stops to pay for the longer trip while still leaving time to load the truck and return to the shop. Build both bands from your crew schedule.

Ask the operator which entrance service vehicles should use. Record gate arrangements only through the authorized contact, and confirm where a trailer can park. Do not route a crew to the middle of an array polygon and call the access planning finished.

Here is the route calculation I would use during estimating: suppose two workers cost $41 each per loaded hour, and a paired route removes 70 minutes of driving per visit cycle. Labor saved is 2 x $41 x 70 / 60, or $95.67 per cycle. Using the unrounded cycle saving, six cycles save $574 before vehicle costs. Put the assumptions beside the estimate.

Use the route density calculator to compare a standalone trip with a grouped service day. Keep mobilization visible in the price. A large project beyond your radius should earn the travel cost rather than borrowing margin from closer accounts.

Mark every qualified site with its route group. If a second nearby account signs, revise the travel allocation before the next renewal. That lets the sales team see where another signed site would improve the existing crew’s schedule.

How to find solar farm owners and maintenance buyers

Identify the parcel owner, solar asset owner and maintenance buyer separately, then confirm which organization issues purchase orders for your exact service scope.

Start with the EIA plant and operator identities, then add any separate generator ownership records. Cross-check those names against the parcel and project documents. Keep each source date beside the corresponding name so the caller can distinguish land ownership from ownership of the generating equipment.

I would give land ownership its own contact field, with two more for array ownership and current service procurement. Leave a field unresolved until a record or direct conversation establishes it. A name copied into every box creates more confusion than an empty field with a research task.

The first call should route the scope. Say: “We provide recurring vegetation service for ground-mounted solar sites in this area. Who handles the maintenance scope for this installation, and when do you review outside contractors?” For electrical O&M, substitute that specific service. Keep the question short enough to answer.

Once you reach the right person, ask for the next buying event. Is the owner reviewing the annual agreement? Does the current O&M provider invite local subcontractors? Is there a vendor qualification process before a site walk? Record the answer and the date you should return.

For a portfolio buyer, link each installation to the same account while keeping separate service quantities. Ask which other sites fall inside your territory. Price a portfolio only after you have the work schedule and travel requirement for each location.

Send a follow-up with the identified site and a defined request: a scope review, an authorized walk or the vendor application. Avoid sending a large proposal before you know who will read it. The estimator needs the buying path as much as the coordinates.

The solar site record your estimator needs

Give each investigated location one stable site ID, dated evidence, parcel and owner fields, service criteria and a reviewed fits, rejects or unresolved decision.

The broader asset inventory method starts by defining what counts before the search. Evidence stays attached to every disposition. For solar, add separate fields for array configuration and the service the record supports.

I would approve a pilot against this handoff sheet:

Field group What belongs in the record How the estimator uses it
Identity Site ID, public source IDs, location and parcel Prevent duplicate research and connect updates
Physical evidence Dated views, visible array blocks and observed changes Decide which scope deserves investigation
Technical facts Documented capacity with AC/DC basis and sourced operating dates Compare accounts without mixing units or age
Buying path Owner information and decision-maker contact where applicable Route the scope to the person who can approve it
Service fit Buyer-defined geography, configuration and other acceptance criteria Prioritize quoting work the crew can deliver
Disposition Fits, rejects with reason, or unresolved with a settling field check Assign the next action without repeating the review

A fits result means the site meets the agreed search criteria. Keep sales qualification in separate columns: contacted, scope confirmed, walk authorized and proposal requested. The location search and the buying conversation answer different questions.

For an unresolved result, name one settling check. “Confirm trailer access with the operator” is an assignable task. “Needs more research” is an unfinished note. Retain a rejection reason with equal care, especially when the array exists but falls outside your service rules.

People review Asset Search candidates before delivery, and every disposition comes back. Have your estimator review the pilot’s edge cases against the acceptance rules before extending the search across the territory.

What one solar vegetation account can be worth

A signed solar vegetation account can repay substantial prospecting effort: the model below produces $16,188 in annual gross profit from a $42,600 service agreement.

For this worked model, assume an 18 MWdc site with 126 maintained acres, six annual mowing visits and a quoted $47 per acre per visit. Add $7,068 annually for defined hand work and reporting. Assume direct service costs, including crew travel and equipment, consume 62% of revenue. Annual renewal probability is 80% after each retained year, with no restart after a cancellation. Evaluate four years without discounting, price increases or changes in margin. Use $4,860 as the all-in campaign acquisition budget, including research, outreach, travel and 80 sales and estimating hours. Hold annual revenue, the four-year horizon and campaign spending constant across the scenarios below; vary only accounts won, margin and renewal.

Annual account calculation Arithmetic Amount
Machine work 126 acres x 6 visits x $47 $35,532
Hand work and reporting Agreed annual scope $7,068
Service revenue $35,532 + $7,068 $42,600
Direct service costs $42,600 x 62% $26,412
Gross profit $42,600 - $26,412 $16,188

Customer lifetime value, or CLV, is the gross profit expected from the account across the planning period. Renewal weighting gives 1 + 0.80 + 0.64 + 0.512 = 2.952 expected contract-years. CLV is $16,188 x 2.952 = $47,786.976, or $47,786.98 rounded to cents. Keep future repairs and repowering out of this calculation until separately sold.

Work backward from three signed accounts. At a 25% proposal close rate, you need 12 proposals. Assume 75% of authorized scope reviews reach proposal, requiring 16 reviews; two-thirds of substantive conversations reach review, requiring 24 conversations; and 20% of researched sites reach conversation, requiring 120 sites. Overall conversion is 3 / 120 = 2.5%. Customer acquisition cost, or CAC, is $4,860 / 3 = $1,620 per account.

Using the unrounded account value, three accounts produce $143,360.928 in expected four-year gross profit, or $143,360.93 rounded to cents. Lead-list ROI uses the whole acquisition campaign: ($143,360.928 - $4,860) / $4,860 = 28.498133… times net return, rounded to 28.5x. Gross profit divided by spending rounds to 29.5x. This return is before company overhead and taxes.

For each scenario, multiply $42,600 by gross margin, accounts won and the renewal factor (1 + renewal + renewal squared + renewal cubed). The factors are 2.533 for low, 2.952 for base and 3.186625 for high. Round dollars only after calculating the portfolio total and multiples to one decimal place:

Four-year scenario Accounts won from 120 sites Gross margin Annual renewal Expected gross profit across accounts Gross profit / $4,860 acquisition spend
Low 1 30% 70% $32,371.74 6.7x
Base 3 38% 80% $143,360.93 29.5x
High 4 42% 85% $228,060.38 46.9x

Expand after the pilot reaches the right buyers and field estimates support the margin. Count signed scopes separately from open proposals when deciding whether to fund the next territory. If the required work makes direct costs exceed the plan, change the price or reject the scope before counting its lifetime value.

Use the lead-list ROI calculator with your own accepted acquisition cost. Also compare profit per sales hour: if the same 80 hours win one account from a broad list and three from a reviewed fit list, first-year account gross profit rises from $16,188 to $48,564. That is $202.35 versus $607.05 in first-year account gross profit per sales hour. Assign every research and follow-up hour to the campaign so the comparison uses the same labor allowance.

How to build a solar O&M prospect list, step by step

Plan a 30-day sales pilot around reviewed sites, buyer conversations and field-priced proposals, with the Asset Search delivery date agreed during scoping.

The schedule below is a planning example. Shift the review and outreach dates to the agreed delivery and the buyer’s availability.

  1. Days 1 and 2: choose one service. Write a one-page offer for vegetation, electrical O&M, cleaning or repowering assessment. Specify what your crew delivers and what the buyer must provide before quoting. Give the campaign one primary outcome, such as an authorized scope review.
  2. Days 3 and 4: draw the service territory. Set the working drive-time band from the shop and mark any outer areas that require grouped visits. Decide which site configurations qualify. Give the estimator authority to reject a location that cannot carry its travel cost.
  3. Days 5 through 7: scope the Asset Search pilot. Submit your solar service criteria and territory through Asset Search. Ask for utility, community or large rooftop systems as appropriate, including candidates beyond directories. Agree on dated evidence, parcel and owner fields, dispositions, the delivery date and the file format before the paid pilot begins.
  4. Days 8 through 12: review the returned decisions. Have the sales lead and estimator examine fits, rejects and unresolved records together. Test the edge cases against the written criteria. Put a named field check against every unresolved site your team intends to pursue.
  5. Days 13 through 17: reach the buying organization. Use the site evidence to identify the maintenance buyer, confirm their scope and record the next buying date. Keep generator IDs and parcel IDs attached to the site so a new contact does not restart the research.
  6. Days 18 through 23: walk authorized sites. Measure the service quantities and record the access requirements with the operator. For vegetation, separate machine acreage from hand work. For equipment service, obtain the records needed to define the inspection or maintenance scope.
  7. Days 24 through 27: price the work. Include travel, reporting and the approval process for extra work. Calculate account gross profit and acquisition cost. Send a proposal that the buyer can compare with its current scope, and set a date to review it together.
  8. Days 28 through 30: decide what to repeat. Count buyer conversations, authorized reviews, proposals and signed scopes. Expand the search where fit and crew economics hold up. Update the rules where the pilot exposed an expensive assumption, then re-answer previously investigated sites against the revised requirement.

Keep a weekly account review to one sheet. For each active site, show the next action and who owns it. The owner should be able to see which proposals can close this season and which accounts belong in a later renewal queue without opening every research record.

Keep the solar territory current between selling seasons

Use quarterly inventory reviews for territory planning, then request more frequent monitoring where installation changes affect the next service decision.

Keep the source publication date separate from image capture and review dates. A newly published file can describe an older observation. Retain the before-and-after evidence for a claimed change so the salesperson can point to the observation behind the alert rather than giving the operator the date a file happened to arrive in the inbox.

Asset Search re-checks sites as new imagery becomes available. A monitoring subscription can flag observed additions or removals and send dated changes. For a new-installation campaign, choose the cadence around the handover decision; near-real-time alerts are available where daily satellite coverage exists.

I would use a quarterly edition for a regional service book and a monthly edition where the sales team is actively tracking new installations. Agree on a faster watch only when somebody is responsible for acting on the alert. A busy inbox does not replace a follow-up owner.

The new-installation change detection guide explains how to connect territory changes to outreach. For solar, set a distinct status for equipment observed in imagery and operation confirmed by records or the operator. Avoid asking a maintenance estimator to treat those as the same milestone.

Refresh the buying path, too. Confirm the responsible organization at each substantive contact and ask when it next reviews the scope. Keep the previous contact history attached. A new name needs a source.

A requirement change can matter before another image arrives. If your company begins servicing a configuration it previously excluded, Asset Search can re-answer already investigated sites against the revised specification, often using the evidence already collected. That gives the sales team a reopened queue with a reason for every new fit.

When Ground Control fits the solar sales job

Use Ground Control for home and commercial building outreach; use Asset Search when the job requires a custom inventory of existing solar installations and reviewed site decisions.

The fastest way to build a property list for solar outreach is Ground Control by PorchRocket: choose the area, building or home size, roof age and relevant visible features such as installed solar. Commercial properties cost $10 to $20 per building; homes cost $0.72 to $1.20 each. Delivery is within 48 hours after payment, often sooner. Every property includes its match reason, and wrong matches receive a credit within 30 days. Owner information and commercial decision-maker research are add-ons. These are target properties for your team to contact, rather than owners requesting quotes.

Start with the solar property lists when you want roofs or homes for a defined outreach campaign. The solar leads by roof guide walks through choosing those prospects. Keep installation sales in a separate campaign from an existing-array maintenance offer.

For commercial rooftop work, write the selection rule around the service. An installed array matters to a module service firm. Roof age and building characteristics matter to an installer assessing future projects. Ask for a custom request when your selection rule goes beyond the standard filters.

I would give the sales manager one list owner for each campaign. That person checks imports and assigns the first contacts. If the same property appears in both installation and maintenance research, connect the records so the owner receives one coordinated conversation.

Asset Search builds a reviewed solar inventory around your territory and service rules, then delivers the location evidence and ownership research needed to assign the next sales action.

For a solar O&M provider, I would start with a small paid pilot credited toward the full order. Per completed investigation fits a buyer who needs the whole territory accounted for; per accepted result fits a service team buying qualifying locations. A subscription fits ongoing territory monitoring and refresh editions. Success-based terms can be tied to an agreed outcome.

Use the two-minute form at Asset Search to tell us what to find and where. We return a scope and quote. Search rules are set with your experts, and the work extends beyond directories to unlisted and newly built installations. Coverage runs from one county to the contiguous United States, with other regions available on request.

For a solar service territory, the agreed delivery includes:

  • Locations and parcels for the utility, community or large rooftop categories in scope.
  • Dated views and the observed facts that determine whether each candidate meets your criteria.
  • Owner information, with decision-maker contact where it applies.
  • Every reviewed disposition: fits, rejects with a reason, and unresolved with the field check that settles it.
  • CSV, Excel, GIS-ready files or an import for your CRM or dealer system.
  • Agreed refresh editions or monitoring changes with before-and-after dates when you choose ongoing service.

Tell us what to find and where your crew works. Asset Search returns the reviewed territory with dated evidence and an action for every investigated site.

Questions people ask

Quick answers

Where can I find a map of solar farm locations?

Start with the USPVDB map for large solar installations and EIA-860 for generator and plant records. USPVDB provides array boundaries as well as locations. Check the release date and individual imagery date, then add smaller systems and recent construction through other public records and imagery review.

How do I find solar farms near me?

Use the USPVDB viewer's current-location control, then filter the surrounding projects by your service scope. Build your final territory around driving time to the authorized entrance. A nearby array across a river or behind a restricted access road can take longer to reach than a more distant site.

Does EIA-860 include every community solar project?

No. EIA-860 covers plants with at least 1 MW of combined nameplate capacity, and community solar describes how benefits are shared rather than a single size band. Add state program records, local permitting evidence and reviewed imagery for installations outside the annual inventory's coverage.

Who buys solar farm mowing and vegetation management?

Contact the party that controls the vegetation scope: the array owner, asset manager, O&M contractor or a landowner with an assigned maintenance responsibility. Ask who issues the purchase order and when the scope is reviewed. Record that answer separately from the name on the land parcel.

How much is a solar farm vegetation contract worth per MW?

Price the maintained acreage and work schedule first. A 2023 study using 2018 and 2019 data reported median total vegetation costs of $944 per MWdc-year for turfgrass (13 observations) and $1,658 for native vegetation (41 observations). Those dated observations help frame the opportunity; a 2026 quote needs current labor, access and site requirements.

Can aerial imagery show that solar panels need cleaning or repairs?

Imagery can locate an array and show its visible layout or changes over time. Use site inspection and operating records to establish cleaning need, electrical condition or lost production. Asset Search records observed facts and marks unresolved questions with the field check needed to answer them.

What does Asset Search deliver for solar O&M prospecting?

Asset Search delivers reviewed solar locations and parcels, owner information, dated views, observed facts and a fits, rejects or unresolved decision for every investigated candidate. Decision-maker contact is included where it applies. Delivery can be CSV, Excel, GIS-ready files or an import for your CRM or dealer system.

Should I use Asset Search or Ground Control for solar leads?

Use Asset Search for a custom inventory of existing utility, community or large rooftop solar installations, with reviewed evidence and search rules set around your service. Use Ground Control for home and commercial building prospect lists for solar outreach. The service you sell determines which property criteria to order.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. Q1-2025 Solar Photovoltaic System Cost BenchmarksNational Laboratory of the Rockies, U.S. Department of Energy and laboratory partners: Description PDF Table 2 gives PV-only utility O&M of $20/kWdc-year in 2024 dollars; the description defines the broad cost scope. Checked November 2026.
  2. Vegetation management costs at utility-scale solar sitesNational Laboratory of the Rockies: 2023 study using 2018 and 2019 activity data; Tables 4 and 5 separate mowing from total vegetation spending and identify the sample sizes. Checked November 2026.
  3. Community Solar BasicsU.S. Department of Energy: Defines community solar through benefits flowing to multiple customers, rather than a particular array size or appearance. Checked November 2026.
  4. Operate and maintain an existing photovoltaic systemU.S. Department of Energy, Federal Energy Management Program: Preventive maintenance, performance monitoring, inspection workflows and O&M planning resources. Checked November 2026.
  5. PV and energy storage O&M best practices, third editionNational Laboratory of the Rockies: 2018 technical report, section 5.7.1, supports site-specific cleaning economics and following module manufacturer instructions. Checked November 2026.
  6. USPVDB data downloads and methodsU.S. Geological Survey: Locations, array boundaries, downloadable formats, 1 MW coverage threshold and stated publication and imagery limitations. Checked November 2026.
  7. USPVDB version 4.0 release memoLawrence Berkeley National Laboratory and U.S. Geological Survey: April 14, 2026 release; 6,611 facilities, state counts, new rooftop and canopy records, and underlying source dates. Checked November 2026.
  8. Annual EIA-860 generator dataU.S. Energy Information Administration: Current annual download covers 2025; plant threshold, generator status tabs, solar details and ownership file definitions. Checked November 2026.
  9. Preliminary monthly EIA-860M inventoryU.S. Energy Information Administration: October 23, 2026 release supplies September 2026 inventory; monthly status updates are preliminary and subject to correction. Checked November 2026.
  10. U.S. Distributed Solar and Storage Data, 2026 updateLawrence Berkeley National Laboratory: August 2026 release covers roughly 5.3 million systems installed through 2025, including rooftop nonresidential systems and ground-mounted systems up to 5 MWac. Checked November 2026.
  11. USPVDB map helpU.S. Geological Survey: Documents project search, map filters, current-location control and table/chart views. Checked November 2026.
  12. Options at the end of a PV performance periodU.S. Department of Energy, Federal Energy Management Program: Distinguishes continued operation, refurbishment, repowering and removal; describes the records and technical decisions behind each option. Checked November 2026.
Your next best move

Put serviceable solar sites on your territory map.

Tell us what to find and where. Asset Search scopes a paid pilot credited toward the full order and sends reviewed locations, dated evidence and owner information in your format.

Find solar sites