Getting paid

How Long Does the Government Take to Pay Contractors? Prompt Payment by State

Read the payment clock before you price the job. Compare state rules, build an invoice the buyer can approve, and follow up without burning the relationship.

The short answer

Texas government payments generally become overdue on day 31 after the later of receipt of goods, completion of services or receipt of the invoice. Certain local bodies get 45 days instead. Other states use different deadlines, sometimes measured in business days or from approval. These are legal payment terms, not guaranteed deposit dates. A proper invoice, proof of receipt and separate tracking of construction retainage help you identify what is due and when to follow up.

Find bids near me

What matters most

  • Texas Government Code 2251.021 generally makes payment overdue on day 31, with a day-46 exception for certain local bodies.
  • PorchRocket found median stated payment terms of 30 days after invoice in a sample of 41 Texas contracts; that sample does not measure deposit dates.
  • Texas retainage caps under Chapter 2252 depend on contract size, and the subchapter excludes contracts estimated below $400,000.
  • Bid Board includes invoice reminders, so tracking the work continues after the award.

The supply-house claim that “the government pays slow” misses the rule in Texas Government Code 2251.021: payment generally becomes overdue on day 31 after the latest of receipt of goods, completion of services or receipt of the invoice.

That is a legal deadline, not a promised deposit date. Bid Control by PorchRocket includes invoice reminders to help you follow up on awarded work. First, match the payment rule to your buyer and the work you sell.

Prompt payment by state: a 12-state reference

Texas generally uses a 30-day clock, but these 12 states differ on invoice approval, construction payments and retainage, so match the row to your buyer and work.

These are statutory rules for covered, undisputed payments as reviewed for October 2026. They are not observed average payment times. “Days” means calendar days unless the row says otherwise. Retainage is the portion of a construction payment held back to secure performance. A properly held amount does not become late merely because the rest of an invoice is due.

State and covered work Statute and payment trigger Late-payment interest Construction retainage rule
Texas: state and local goods or services Government Code 2251.021: generally 30 days after the latest goods, service or invoice event; 45 days for qualifying local bodies meeting monthly or less Annual rate fixed for the fiscal year: statutory July prime-rate benchmark plus 1 percentage point 2252.032 to 2252.033: generally 10% below $5 million and 5% at or above it; contracts estimated below $400,000 are excluded; other exceptions apply
Florida: local government 218.73 to 218.735 and 218.74: nonconstruction generally 45 days after proper invoice receipt by the chief disbursement officer following required governing-body approval; construction 25 business days with agent approval, 20 without Construction: 2% monthly or higher contract rate. Nonconstruction: 1% monthly starting 30 days after the due date; vendor must invoice for interest 5% under 218.735(8); that subsection excludes contracts of $200,000 or less and certain conflicting federal requirements
Arizona: covered public construction 34-221(C): 14 days after certification and approval; estimate deemed approved after 7 days absent specified written objections 1% monthly or fraction of a month Generally 10% initially; conditional release of half at halfway and reduction to 5% on later progress payments
Colorado: covered public construction above $150,000 24-91-103: authorize partial payments at month-end or as soon afterward as practicable; final settlement within 60 days after satisfactory completion and final acceptance This section sets no owner-to-prime late-interest rate; its 15% annual minimum concerns late payments to subcontractors Pay at least 95% of calculated earned work, leaving up to 5% retained
North Carolina: covered public construction, excluding specified DOT contracts 143-134.1: progress due dates may be contractual; final balance within 45 days of the earliest specified acceptance, certification or occupancy event 1% monthly or fraction, unless a lower rate is agreed No retainage below $150,000 total project cost; generally 5% at or above that threshold, with halfway and release conditions
Ohio: covered public improvements 153.12 to 153.14: approved estimates payable within 30 days of filing with owner or representative Average commercial-bank prime rate in the nearest city with population over 100,000 Labor progress payments at least 96% under current 153.12; qualifying stored materials initially paid at 92% of invoice cost under 153.14
Pennsylvania: public works 62 Pa.C.S. 3921 and 3932: contract timing governs; absent a term, progress payment within 45 days of application receipt Secretary of Revenue’s specified tax-interest rate unless otherwise agreed; statutory 15-day interest grace provision can apply Generally 10% until halfway, then conditional reduction to 5%; Department of General Services has separate 6%/3% rules
Virginia: local government 2.2-4352: contract date; otherwise within 45 days after the later invoice or goods/services event Unless contract says otherwise, supplier-assessed finance charges up to 1% monthly 5% on covered construction progress payments under 2.2-4333
Oklahoma: covered public construction above $25,000 61 O.S. 223 to 226: progress payments within 30 days after proper invoice submission; 227 excludes highway, railroad and turnpike work, plus roads, utilities and other listed infrastructure unless part of a covered construction contract Progress-payment interest follows 62 O.S. 41.4b by reference; separate final-payment rates under 61 O.S. 113.3 are 1.5% monthly, or 0.75% for school districts Up to 5% initially; 226 reduces retained funds to 2.5% of earned amounts after halfway with satisfactory progress. DOT and Turnpike Authority have no retainage under 113.1
Louisiana: public contracts R.S. 38:2191: contract due date; progress-payment remedy after 45 days from certified request without reasonable cause; final-payment trigger also requires acceptance and clear lien certificate Statutory interest of 0.5% accumulated daily, capped at 15%, plus reasonable attorney fees under specified conditions 38:2248: 10% below $500,000; 5% at or above $500,000; excludes the Department of Transportation and Development
New York: local public works outside New York City General Municipal Law 106-b: approvable requisition within 30 days excluding legal holidays; 45 with qualifying elected-official approval; specified state-funding delays can defer the due date State tax overpayment rate; statutory exceptions include interest under $10 and certain delayed state funding Generally 5%; up to 10% where full performance and labor/material bonds are not both required
Illinois: local goods or services 50 ILCS 505/3 to 505/6: generally 30 days to approve from the later bill or delivery date, then 30 days to pay; agreed longer periods permitted 1% for each month or fraction after the payment deadline; missing the approval deadline generally starts penalties after 60 days from the later bill or delivery date 30 ILCS 550/1: covered local work with required bond or substitute, 10% before halfway; reduce held retainage to 5% at halfway and cap later withholding at 5%

The smallest number in the table can be misleading. Arizona’s approval step, Florida’s business-day count and Illinois’s approval-then-payment structure describe different clocks. North Carolina’s 45-day rule concerns the final balance, not every monthly invoice. Colorado’s monthly-payment language is not a universal “net 30” requirement.

This table is aimed at direct public buyers. An electrical subcontractor working for a general contractor must also read the subcontract and the pass-through rule. An agency’s payment to the prime contractor and the prime’s payment to you are separate transactions.

Do government contracts pay on time?

Public buyers must meet the deadlines that apply to their contracts, but a prompt payment law alone does not tell you whether a particular buyer pays on time.

PorchRocket’s Bid Control data (October 2026) found a median stated payment term of 30 days after invoice among 41 Texas contracts with an extracted payment period. Those are written terms, not measured deposit dates.

I would reject both blanket claims: that public buyers always pay slowly, and that a government logo means you can stop watching receivables. Read the payment clause and save proof of submission. Find out who approves the bill. A deadline gives you grounds to follow up; your billing file shows when that deadline applies.

There are four different dates on a small service job: the first day your crew works, the date you are allowed to bill, the legal payment due date and the date funds become available. A contractor can wait several weeks from the first mowing visit even when the buyer pays within its permitted invoice period. Calling that invoice “late” before checking the starting event sends the wrong message to purchasing.

For contrast, the federal Prompt Payment Act, 31 U.S.C. 3901 et seq., concerns federal agency payments. Its implementing regulations, 5 CFR Part 1315, generally use 30 days after the later proper-invoice or acceptance event. Approved construction progress payments generally use 14 days after the designated office receives the request, unless the solicitation specifies a justified longer period. Federal payment guidance does not automatically govern a city mowing contract. Identify the entity that signed your agreement before choosing a statute.

For an owner deciding where to start, I would favor a manageable service assignment with clear billing instructions over a large project whose payment clause nobody can explain. The broader case for building a business with government contracts belongs in that decision, but payment terms deserve their own review before you bid.

Texas prompt payment starts with the later date

Under Texas Government Code 2251.021, the general payment period runs from the latest applicable goods-receipt, service-completion or invoice-receipt date, with payment overdue on day 31.

The word “latest” does the work. You cannot start the clock by dating an invoice before finishing the billed service. You also cannot leave an invoice on your desk for two weeks and count those weeks against the buyer. Record when the agency received it.

For example, an HVAC service visit ends October 5, and the designated invoice office receives the proper invoice October 8. Use October 8 as the later event for the ordinary rule. If an invoice arrives first and the service ends afterward, the service date controls instead. All job examples and dollar calculations below are illustrations.

Texas also has a provision small contractors can miss: when a political subdivision’s governing body meets only once a month or less frequently, payment becomes overdue on the 46th day. Ask which schedule applies before you write a day-31 collection email. The official Chapter 2251 text contains both rules.

A monthly check run does not, by itself, prove the governing-body exception applies. The test concerns how often that body meets. Nor should a clerk’s statement that “we always pay in 60 days” replace a review of the statute and contract. Ask for the written basis and take an unresolved conflict to someone authorized to interpret it.

Keep a short payment note with each purchase order: permitted billing interval, invoice recipient, completion evidence and calculated due date. Attach the buyer’s response if there was a question about the rule. That note saves the owner from reconstructing the same conversation at month-end.

The Texas city, county and school bidding guide covers getting the work. Once an award becomes a purchase order, add payment tracking to the same job file.

What counts as a proper government invoice?

A proper invoice meets the buyer’s contract requirements and reaches its designated recipient, with enough detail to match the charge to authorized work and confirm the amount owed.

There is no single city invoice form that fits every state and trade. A buyer can require its own pay application, a portal upload or a PDF sent to a named office. Start with the purchase order’s billing section, even if you have been billing commercial customers for years and have a format that usually gets paid without a phone call.

Florida makes the definition explicit in Section 218.72: a proper invoice conforms to statutory requirements and the agency requirements included in the contract. Texas Section 2251.002 separately addresses invoices that do not follow purchase-order mailing instructions. The delivery method matters as much as the invoice date.

Invoice field or attachment What I would put in it What it lets the reviewer check
Vendor identity Legal business name and buyer-assigned vendor number Match the invoice to the approved supplier record
Invoice identity Unique invoice number, issue date and billing period Avoid a duplicate or a charge for the wrong month
Authorization Contract number, purchase order and work-order number where required Verify that the billed work was ordered
Location and scope Facility name, address and specific service Route the charge to the person who knows the work
Pricing Contract line item, quantity, unit price and extension Recalculate the bill against the awarded schedule
Performance evidence Signed service ticket, inspection record or required report Confirm the service or quantity being billed
Adjustments Approved change-order reference, credits and any retainage Separate earned work from amounts still being held
Payment contact Remittance details and a person who can resolve a question Correct a problem without hunting for the owner

Your vendor file may need a current IRS Form W-9 and banking information before payment can be released. Submit them through the buyer’s approved secure process.

For cleaning, a monthly service log might support the invoice. For mill and overlay, the packet might call for quantity measurements and material tickets. A lump-sum roof pay application may use a schedule of values, which divides the contract amount among work items. Follow the contract’s evidence requirement rather than attaching a folder full of unrelated photos.

This is also where the first job creates reusable office work. Bid Builder’s company file, the Bid Passport, holds recurring bid documents such as the W-9 and insurance certificate. It helps with the bid packet. Your invoice still needs that job’s authorized quantities and proof of performance. The vendor registration guide explains the account setup that comes before billing.

Who approves city and school district invoices?

The person who verifies the work and the office that releases payment often have separate roles, so identify both before submitting your first city or school invoice.

I ask for names, not just departments. “Send it to the district” is too loose when a campus facilities employee signs the service ticket but district accounts payable must receive the invoice. A purchasing agent may resolve a purchase-order mismatch without being the person who certifies that the floor was stripped and waxed.

Map the route during the award handoff:

  1. The contract contact confirms what your company is authorized to do.
  2. The field representative checks the delivered service or installed work.
  3. A reviewer checks quantities or certifies the construction pay application when required.
  4. Accounts payable matches the bill to the vendor record and releases payment through its approval process.

Confirm the route with the buyer; some agencies combine roles. A construction architect may sit outside the agency but still be the designated first recipient.

Public school districts are expressly included in Texas Chapter 2251. The monthly-governing-body exception can matter to their payment dates. Get billing cutoffs and approval contacts in writing, especially for summer work when the campus contact and the district finance office may have different schedules. Our school district bidding guide covers the purchasing side.

At kickoff, I would ask who receives the invoice and how to confirm that the service has been approved. Record the names beside the purchase order. Ask whether one invoice may cover several campuses or whether each location needs its own document.

If the field contact says the work is accepted but accounts payable says it has no invoice, resend through the required route with the original receipt attached, so the finance office can distinguish a routing problem from a bill your company never submitted. Preserve both dates.

A filled-in service invoice and payment timeline

A $18,460 janitorial invoice should show the purchase-order match and service evidence clearly enough that an accounts-payable clerk can check it without calling the crew.

Here is a six-person cleaning company’s September service invoice to a Texas public buyer.

Field Filled-in example
Invoice number and issue date CLN-2026-0930; September 30, 2026
Purchase order PO-26-0417
Billing period September 1 through September 30, 2026
Contract line 1 Monthly janitorial service at administration building: $8,740
Contract line 2 Monthly janitorial service at service center: $7,540
Approved extra work Work order WO-118: floor restoration, 10,900 square feet at $0.20 = $2,180
Total requested $8,740 + $7,540 + $2,180 = $18,460
Supporting records Monthly service logs and the signed WO-118 acceptance record
Required delivery Buyer-designated invoice channel, with receipt saved

The extra work needs its own authorization. A crew lead’s note that a hallway needed attention is not the same thing as an approved work order. An unauthorized extra charge stays out of the monthly cleaning line.

Assume the billed services ended September 30 and the designated office received the proper invoice October 6. For a buyer under Texas’s ordinary 30-day rule, October 6 is the controlling event and the invoice becomes overdue on the 31st day afterward, November 6. A qualifying 45-day buyer has a different calendar. Confirm the applicable rule before scheduling the late notice.

I would set an earlier administrative check too. A few working days after submission, confirm receipt and ask whether the attachments are readable. That is a troubleshooting step, not an early demand for payment. Save the acknowledgment with the invoice.

When payment arrives, match the remittance to CLN-2026-0930. A deposit of $16,280 would match the two regular service lines but leave $2,180 unexplained. Ask whether the extra work was disputed, held for missing approval or omitted.

For monthly work, copy the approved invoice structure into the next billing cycle, replacing the service dates and checking each quantity against that month’s field records before an old floor-restoration charge finds its way onto a second bill.

How much working cash does net 30 require?

Monthly billing plus a 30-day payment period can leave your company funding roughly two months of work before the first collection, depending on submission and performance dates.

The invoice deadline starts after expenses have already started. A six-person janitorial crew begins the first night of the month. Payroll goes out during that month. If the contract permits billing only after the month ends, your earliest wages are already several weeks old when the invoice reaches accounts payable.

Build a calendar using cash outflows, not the full contract value. In the cleaning illustration, suppose direct job cash costs are $3,180 each week and the first collection falls after eight weekly outlays. The temporary funding need for those outlays is $3,180 × 8 = $25,440. Add $1,275 of startup supplies paid before service, and the example reaches $26,715 before other overhead or a delay reserve.

Use your own costs and payroll dates for the forecast. A two-truck HVAC shop buying an RTU before installation will have a different cash curve from a day-porter contract.

Then test a delay. If collection slips two more weeks while the crew keeps working at the assumed weekly cost, the example needs another $6,360. Interest owed later does not fund Friday’s payroll now. I would make this delay test before bidding, while there is still time to choose a smaller assignment.

For construction, separate earned billings from money expected this month. An approved $47,830 pay application with contractual 5% retainage leaves $2,391.50 held and $45,438.50 payable before any other authorized deductions. Put the retained amount on a separate schedule. Otherwise your forecast promises cash that the contract allows the buyer to hold.

Carrying costs belong in your estimate. Review how to price a government bid with your own payroll and material schedule beside it. I would pass on a job that requires more cash than the business can fund without missing existing obligations, even when the scope fits the crew perfectly.

Texas public construction retainage limits

For covered Texas public works, Section 2252.032 generally caps retainage at 10% below $5 million and 5% at or above $5 million, subject to exclusions.

Read Sections 2252.032 and 2252.033 together. The second section excludes contracts with a total price estimate below $400,000 at execution, as well as specified TxDOT contracts. That means a small roofing or paving contract cannot borrow the larger-project cap without checking whether another rule applies.

Contract situation What the cited Texas subchapter says What I would do before bidding
Estimated contract below $400,000 Excluded by 2252.033 Read the contract’s retainage clause and identify any other governing rule
Covered contract from $400,000 to below $5 million General cap of 10%, including the rate on schedule items Price the stated holdback and its release conditions
Covered contract of $5 million or more General cap of 5% Check whether a listed exception changes that result
Dam construction or maintenance 10% provision regardless of contract value, subject to applicability Do not apply the ordinary large-contract 5% rule
Specified water projects or entities Special exception in 2252.032(i) Read the exception against the owner and funding documents

These are ceilings where the law applies. A contract can specify less. Never replace the percentage printed in your agreement with a number taken from a table unless the printed term has been reviewed and corrected through the proper process.

For a covered $684,700 paving contract, a stated 10% holdback could tie up $68,470 if applied across the earned contract amount. At 5%, the amount would be $34,235. The $34,235 difference changes what you can spend on the next job.

Release deserves its own reminder. The statute addresses substantial-completion provisions and prohibits holding retainage after required work is finished merely through the warranty period, while allowing specified dispute or surety-related withholding with written notice. The roller leaving the site does not settle the closeout file.

Before mobilizing, make a closeout list from the contract. It might include final quantity agreement, required warranties, as-built records and surety consent. Assign responsibility while the project is active. Hunting for an installer’s warranty after everyone has moved to another job can delay your release request.

What happens if the buyer disputes your invoice?

Texas Government Code 2251.042 requires notice of an invoice error or disputed amount by day 21 after receipt, including a detailed statement of the disputed amount.

A dispute needs an answer tied to the charge. If the buyer questions 120 linear feet of curb, send the measurement record and the agreed unit-price item. If it questions an extra filter change, send the approved work order. A second copy of the same unsupported invoice does not resolve either issue.

Texas’s disputed-payment provisions also address interest after resolution. A vendor that prevails is entitled to interest on the unpaid balance from the original overdue date. When the government prevails, the vendor submits a corrected invoice under the payment rule. Preserve the original submission and every correction so the dates remain traceable.

I would keep four items together:

  • The buyer’s written objection and the exact amount questioned.
  • The contract clause or awarded line item governing that charge.
  • Your evidence, such as a signed ticket or measured quantity.
  • The written resolution, revised amount and payment status.

Ask the buyer to identify the undisputed balance and its scheduled payment date. Section 2251.042(d) limits withholding to 110% of the disputed amount. A $1,000 dispute therefore permits no more than $1,100 to be withheld under that provision. Ask for the dollar breakdown if the whole invoice is on hold.

Keep invoice revisions traceable. Follow the buyer’s correction instructions, identify the earlier version and preserve a revision trail. Otherwise the new document can look like a second charge, while your staff believes it replaced the first.

Treat an unresolved dispute as a contract-administration problem. Follow the agreement’s notice method and deadlines. If the buyer denies an earned amount or a notice deadline is approaching, get counsel familiar with public contracts in that state. A friendly exchange with a project manager does not replace a required formal notice.

How much interest does Texas owe on late payments?

Texas late-payment interest uses an annual fiscal-year rate based on the statutory July prime-rate benchmark plus 1 percentage point, rather than a universal monthly penalty.

Under Section 2251.025, interest begins when payment becomes overdue. The rate uses the Wall Street Journal prime rate on the first July day that is not a Saturday or Sunday in the preceding fiscal year, plus 1 percentage point. Use the fiscal-year rate in effect when the payment becomes overdue, not today’s bank rate.

The calculation needs the eligible unpaid principal, the applicable rate and the overdue period. For a simple illustration using an assumed annual rate of 8%, a $18,460 balance outstanding for 17 interest days would produce approximately $68.78 using $18,460 × 0.08 × 17 ÷ 365. The 8% is an assumption for the math, not a statement of the Texas rate in October 2026.

I would pursue the principal first. About $69 of interest does little for the payroll exposure created by a missing $18,460 payment.

Texas Section 2251.027 requires a political subdivision to calculate and pay applicable interest with the principal. It cannot make the vendor submit a separate interest bill as a condition of receiving it. If the remittance contains only principal, ask accounts payable to reconcile the omitted interest and show its calculation.

Keep the request factual: invoice receipt date, applicable due date, principal unpaid, payment transmission date and disputed items, if any. Ask what rate and day count the office used. For a political subdivision, interest stops when payment is mailed or electronically transmitted, so save the remittance notice as well as the bank record.

A partial payment changes the calculation. If the buyer paid the regular service lines earlier but left the authorized extra work unpaid, calculate each eligible balance for the period it remained outstanding instead of charging interest on the original invoice total through the final payment date. Track lawful retainage separately from disputed charges. A clean calculation is easier for the finance office to approve than a round-number “late fee.”

A polite escalation plan for overdue government invoices

Start an overdue-invoice follow-up with accounts payable and proof of receipt, then escalate to the contract contact with the amount due and the specific unresolved obstacle.

Begin with the invoice number. The first job is to find out whether the bill is missing, rejected, approved but waiting for release, or already paid under a remittance your office has not matched.

Point in the process Action Evidence to save
Shortly after submission Confirm the correct office received the invoice and attachments Portal receipt or written acknowledgment
Before the expected payment date Resolve any stated mismatch or missing document The request and your dated response
First follow-up after the applicable due date Ask accounts payable for status and expected release date The invoice, receipt and due-date basis
No clear answer or a missed promised date Copy the contract administrator and ask who owns the next step A short chronology with the open amount
Persistent denial or unresolved dispute Follow formal notice provisions and obtain legal review where needed Contract, correspondence, performance evidence and payment ledger

Here is a sample email for the cleaning invoice. Replace the facts and confirm the legal deadline before sending it.

Subject: Payment status for CLN-2026-0930, PO-26-0417

Hello Accounts Payable,

Please confirm the payment status of invoice CLN-2026-0930 for $18,460. Your designated invoice office acknowledged receipt on October 6. The September service logs and approved WO-118 are attached.

Our records show the amount remains unpaid after the applicable payment period. Please confirm the scheduled release date, or identify any disputed line and the document needed to resolve it. Please also confirm the handling of any prompt-payment interest due.

Thank you. Our billing contact can resolve a document issue today.

If accounts payable reports that payment has gone out, ask for the remittance reference and date. Give your bookkeeper those details before sending another demand. If payment was sent to an old address or rejected by the bank, determine which vendor record needs correction through the approved process.

Bid Control’s invoice reminders fit this routine: give the follow-up a place on your calendar while you are estimating the next job. Someone in your office still needs to own the response.

A “late” reminder is not authorization to pull the crew. Suspension rights have conditions and notice procedures. Review those before stopping work. A payment problem should not become a separate performance default through an improvised shutdown.

When must a prime contractor pay subcontractors?

Texas Sections 2251.022 and 2251.023 generally require the appropriate payment share to move to the next covered tier within 10 days after receipt.

The government paying the general contractor starts a different clock from the one governing your original invoice. That is why a subcontractor needs to track both its submission and the prime’s receipt of funds attributable to its work. Read the Texas pass-through provisions together with the subcontract and any dispute terms.

For a small electrical subcontractor, the first question after a delayed progress payment is specific: “Was our work included in the pay application, was that item approved, and has the owner paid it?” Each answer points to a different issue. A rejected quantity needs supporting records. An approved amount already received by the prime needs a payment follow-up.

If you are the prime, make this part of your deposit routine. Match the owner’s payment to the work items and identify the amounts belonging to your subcontractors. That deposit includes money earned by another firm.

Suppose a public owner pays $42,680 covering your crew’s work and $9,340 earned by a plumbing subcontractor. If that $9,340 is the appropriate undisputed share, record its pass-through deadline when the money arrives. The subcontractor’s pay date should not depend on when your office next happens to reconcile the bank statement.

Retainage is another separate line. For covered Texas public works, Chapter 2252 limits the retainage percentage a prime can withhold downstream by reference to the percentage permitted under its own contract. A prime should not assume it can hold a larger percentage from a smaller firm just because its standard subcontract says so.

The public-project subcontracting guide covers the wider relationship. For payment trouble, preserve notices and check payment-bond remedies with counsel promptly where applicable. An informal promise that the check will come next week should not cause a subcontractor to miss a claim deadline.

Florida local government payment rules

Florida local construction payments generally use 25 business days when an agent must approve the request and 20 business days when no agent approval is required.

The distinction comes from Section 218.735. Use the designated submission point and retain its receipt stamp or electronic equivalent. Use business days and account for applicable holidays. Twenty-five business days is not the same window as 25 calendar days.

A two-truck HVAC shop in Pasco County should establish whether an RTU replacement is being handled as construction services under its contract and who reviews the pay request. Those classifications can require different due-date templates.

Florida’s nonconstruction local payments generally come due 45 days after the chief disbursement officer receives a proper invoice following any required governing-body approval. Sections 218.73 and 218.74 also address cases where no proper invoice is received. Confirm the receipt date with that office; a service ticket signed at the building may be earlier.

The same separation matters for late interest. Florida construction uses 2% per month or the higher contract rate. Nonconstruction interest generally starts 30 days after the due date at 1% per month and requires the vendor to invoice for it. A Texas-style assumption that every local interest payment needs no separate bill would be wrong here.

For a Florida construction estimate, read the retainage exception closely. The 5% provision in Section 218.735(8) does not apply to contracts of $200,000 or less. A small trade contractor should not quote that subsection as its automatic cap on a smaller job.

Florida also gives construction invoice corrections their own timetable. Section 218.735 requires a written rejection identifying the deficiency within 20 business days. A corrected request must be paid or rejected by the later of 10 business days after receipt or the first business day after the next regular meeting, where law requires the local body to approve or reject it. The undisputed portion must still be paid on time. Save the rejection beside the corrected submission so your office can follow the right clock.

Are public receivables bankable?

An authorized public invoice with documented performance gives a lender a receivable it can evaluate, but eligibility, advance amounts and assignment requirements depend on the financing agreement.

Treat “bankable” as ready for a lender’s review. Bring the purchase order showing the authorized amount, along with the approved invoice and evidence that the billed work was performed. A contract ceiling alone does not establish a receivable.

I would bring the contract and receivables aging report to a lender before a cash shortage, with recent invoices attached so the loan officer can trace each balance to the work that earned it. An aging report lists unpaid invoices by how long they have been outstanding. Separate disputed charges and retainage so the lender can see the amounts you expect to collect during normal billing.

Ask what counts as an eligible invoice under the proposed facility. Ask how it treats retainage, a single large customer and assignment of payment rights. Get the advance calculation and fees in writing. Before changing payment instructions, confirm that the contract permits the financing arrangement and that the buyer has accepted the required process; otherwise, the lender and accounts payable could be working from different instructions for the same invoice.

Recurring work can make the paperwork and billing pattern easier to understand. In our records, 67.2% of 362 Texas contracts with stated contract-type information were multi-period term or as-needed contracts. As-needed work does not guarantee monthly purchases, and an unexercised renewal is not earned revenue.

A fixed monthly cleaning assignment and an on-call plumbing agreement should therefore occupy different lines in a cash forecast. The cleaning contract may provide an agreed monthly charge for performed service. Plumbing revenue depends on authorized calls. Only bill what the agreement permits and what the company has earned.

Our government service contracts guide explains those recurring arrangements. For payment planning, I would choose clear order and billing terms over an impressive contract ceiling. Forecast collections from authorized orders.

Before bidding, check the payment pages

Review the payment pages before submitting your number, because a 30-day term alone does not reveal the cash burden of a public job.

You can have enough people and equipment to do the work while lacking the cash to carry it. Choose a smaller assignment or secure funding before committing.

I would flag these provisions for an answer during the permitted bid-question period:

  • Billing only at final acceptance on work that requires substantial upfront material purchases.
  • A payment trigger that depends on a certificate without naming who issues it.
  • Retainage language that conflicts with another page of the packet.
  • Extra work that requires written authorization, paired with an unclear approval route.
  • Funding contingencies that change when the buyer can release payment.
  • A pay-application deadline that gives your office little time to obtain required field records.

Ask purchasing to clarify the clause through the channel named in the solicitation. If the answer changes the terms, look for the written amendment or addendum. Save it. A helpful phone conversation cannot substitute for a change the contract requires in writing.

Use the public bid package checklist to locate the agreement, supplementary conditions and forms before bid day. For a service bid, confirm the permitted invoice frequency. For construction, find the schedule-of-values requirements and the process for stored materials. A supplier’s deposit requirement does not automatically mean the public buyer will reimburse that deposit immediately.

This review gets faster with repeat work. Your first packet takes longer because you are learning the buyer’s forms and approval habits. On the next one, the vendor account exists, the company file is ready and your office knows which supporting records the reviewer asks for. Still read each new payment clause.

Bid Board keeps awarded work in view

Bid Board combines public-job discovery with invoice reminders, helping an owner keep track of payment follow-up while the crew works and the next bid is taking shape.

For a contractor whose main concern is finding suitable public work and following it through billing, I would start with Bid Board. Read the payment pages while choosing jobs, then use the reminders to keep unpaid invoices on your office’s calendar.

  • Your board shows jobs for your trade and area, with the best fits first and new opportunities arriving on your phone each morning.
  • Bid papers, due dates and addenda stay together so you can read the payment pages while deciding whether to bid.
  • Early project signs from budgets, board minutes and capital plans help you see work before the formal solicitation arrives.
  • Past award information shows who won and for how much, helping you judge the size of the work before committing cash to it.
  • Invoice reminders stay part of the job after award, so the owner has a prompt to check an unpaid balance while the crew is busy elsewhere.

Every paid plan includes those reminders. If assembling the next bid is the larger problem, Bid Builder adds step-by-step form help and reuse of your Bid Passport. If you want help planning bids and handling the paperwork, Bid Team’s done-with-you service covers that work. You make the final call on your number, you sign and you send.

Give one person responsibility for responding to each reminder and recording the buyer’s answer. Keep that routine in place while Bid Board brings the next jobs to your phone.

Questions people ask

Quick answers

How long do cities take to pay contractors?

In Texas, generally 30 days after the latest required event, with a 45-day exception for certain local bodies. The city’s state law and contract determine which deadline applies. Florida local construction uses 20 or 25 business days. Confirm the invoice recipient, required attachments and payment trigger before treating any date as the start of the clock.

Does net 30 mean I get paid 30 days after starting work?

No. Net 30 describes a payment period, usually tied to an invoice or another specified event. If you bill monthly after performing the work, the first payroll can precede the first invoice by weeks. Budget from the first cash expense through the expected receipt of payment, including any retainage.

What starts the Texas government prompt payment clock?

The latest of the applicable events in Government Code 2251.021: receipt of goods, completion of services or receipt of the invoice. Under the general rule, payment is overdue on day 31. Sending an invoice early does not move the service completion date forward, and sending it to the wrong recipient can create a separate problem.

Do school districts have to follow prompt payment laws?

Yes, where the applicable law includes them. Texas Chapter 2251 expressly includes public school districts. A district whose governing body meets only once a month or less frequently falls under the 45-day provision. Read the district’s purchase order and invoice instructions as well as the statute; a campus employee’s approval might still need district processing.

Can a Texas city require me to bill separately for late interest?

No. Section 2251.027 says a political subdivision must calculate and pay applicable interest with the principal and cannot require a separate petition or bill. If interest is missing, send the invoice receipt evidence and ask accounts payable to reconcile it. First distinguish an overdue undisputed amount from a properly disputed amount or retainage.

Is retainage always limited to 5% on Texas public jobs?

No. For covered contracts, Section 2252.032 generally allows up to 10% below $5 million and 5% at $5 million or more. Section 2252.033 excludes contracts estimated below $400,000 and certain TxDOT contracts. Dam and specified water-project exceptions also matter. Read the applicable contract before assigning a retainage percentage to your cash forecast.

Does the federal Prompt Payment Act apply to a city contract?

No, not automatically. The federal act governs federal agency payments. A city purchase remains subject to its applicable state and local rules and contract terms. Federal grant conditions can affect a locally administered project, so identify the contracting buyer and read the funding provisions instead of assuming every public invoice follows the federal clock.

Does Bid Board include invoice reminders?

Yes. Bid Board includes invoice reminders, and they are included in every paid Bid Control plan. The reminders support your follow-up on awarded work. Your company still needs to submit the required invoice and supporting records, confirm receipt, resolve discrepancies and reconcile payment against the amount billed.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. Texas Government Code, Chapter 2251Texas Legislature: Payment triggers, exceptions, interest, disputes and subcontractor payments; verified October 2026.
  2. Texas Government Code, Chapter 2252, Subchapter BTexas Legislature: Retainage percentages, release conditions and exclusions in Sections 2252.031 through 2252.033; verified October 2026.
  3. Florida Statutes, Chapter 218, Part VIIFlorida Legislature: Local service and construction payment rules, interest and retainage exceptions; verified October 2026.
  4. Arizona Revised Statutes, Section 34-221Arizona Legislature: Public construction approval, payment, interest and staged retainage rules; verified October 2026.
  5. North Carolina General Statutes, Section 143-134.1North Carolina General Assembly: Public construction final and periodic payments, interest and retainage; includes the displayed 2026 amendment; verified October 2026.
  6. Colorado Revised Statutes, Title 24Colorado Office of Legislative Legal Services: Section 24-91-103: monthly progress payments, final settlement and retainage. Official 2024 text cross-checked against the 2025, 2025B and 2026 amendment tables; verified October 2026.
  7. Ohio Revised Code, Chapter 153Ohio Legislative Service Commission: Sections 153.12 through 153.14 cover approved estimates, interest and public improvement retainage; verified October 2026.
  8. Pennsylvania Consolidated Statutes, Title 62, Chapter 39Pennsylvania General Assembly: Public works progress payments, grace period, interest and retainage; verified October 2026.
  9. Virginia Code, Title 2.2, Chapter 43Virginia General Assembly: Local payment dates and finance charges under Section 2.2-4352; retainage under Section 2.2-4333; verified October 2026.
  10. Oklahoma Statutes, Title 61Oklahoma Legislature: Public construction payment and retainage rules in Sections 113.1, 113.3 and 223 through 227, including infrastructure exclusions; verified October 2026.
  11. Louisiana Revised Statutes, Section 38:2191Louisiana State Legislature: Public contract payments and late-payment remedies, including the 2024 amendment; verified October 2026.
  12. New York General Municipal Law, Section 106-bNew York State Senate: Local public works payment timing, interest and retainage; New York City and state-funding exceptions identified; verified October 2026.
  13. Illinois Local Government Prompt Payment Act, 50 ILCS 505Illinois General Assembly: Local approval and payment periods, agreed extensions and interest; verified October 2026.
  14. Federal prompt payment regulations, 5 CFR Part 1315Office of the Federal Register and U.S. Government Publishing Office: Federal proper-invoice requirements and payment rules implementing 31 U.S.C. 3901 et seq.; verified October 2026.
Your next best move