Certified Payroll for Public Works: Prevailing Wage, WH-347 and a Four-Person Example

Find the contract's wage rates, put the full labor cost in your bid and build a weekly report that agrees with what your crew earned. Includes the current federal form and Texas requirements.

The short answer

Certified payroll for public works is a weekly payroll report with a signed statement confirming that covered workers received the required wages and fringe benefits. On Davis-Bacon construction, contractors can use the optional federal WH-347 or an accepted equivalent. Start with the wage determination incorporated into the contract, record hours by classification and reconcile the report to payroll. Texas public works also require prevailing wages under Chapter 2258, with reporting instructions set by the project.

Get help with public job paperwork

What matters most

  • Davis-Bacon prevailing wage includes the basic hourly rate plus any required fringe benefits, so pricing only the wage column can leave labor underbid.
  • The current WH-347 separates hourly wages in 6A, total benefit-plan credit in 6B and total cash fringe payments in 6C.
  • In the four-person example, 160 straight-time hours cost $6,328 before employer burden; five roofer overtime hours add $292.00.
  • Texas Government Code 2258.023 specifies a $60 penalty per underpaid worker per calendar day or part of a day, subject to the statute's conditions.
  • Bid Team helps organize the bid packet; appoint a payroll preparer and a certifying official before the first covered shift.

Prevailing wage is the minimum pay required for a covered public-works classification, including any required fringe benefits. Certified payroll is the weekly record of that pay and a signed compliance statement, commonly submitted on the federal WH-347 for Davis-Bacon construction.

Price a public roof replacement at the crew’s normal shop rate and the fringe column can eat the margin after award. By then, the labor budget is committed and the crew has a start date.

I would settle the wage sheet before finishing the estimate, then put one person in charge of the weekly report. Bid Control by PorchRocket puts bid papers and addenda together; your estimator and payroll preparer need to work from the same version of those papers.

What does prevailing wage cover in 2026?

Davis-Bacon covers qualifying federal construction contracts over $2,000, while Related Acts and state laws extend prevailing wage requirements to other covered public projects.

DOL’s coverage guidance includes construction, alteration and repair, including painting and decorating. Federal assistance can bring a city project under a Related Act even when the local buyer’s name is on the bid cover.

For Texas, Government Code Chapter 2258 governs covered public works funded wholly or partly with public money. Section 2258.021 excludes maintenance work from its wage entitlement. Read the scope carefully when a solicitation mixes service calls with replacement construction, and ask the buyer to identify the governing requirements before bidding.

My first pass through a packet produces four answers:

  • Which funding source and wage law does the buyer identify?
  • Which wage determination or local schedule is incorporated?
  • Which tasks will our employees and subcontractors perform?
  • Which payroll records must we send, to whom and when?

Put the answers beside the estimate. If a subcontractor prices only the installation while your crew handles tear-off and hauling, list those responsibilities separately. An assumption buried in an email will not help the payroll preparer decide how to code Wednesday’s hours.

There is a 2026 update worth separating from old summaries. DOL’s 2023 rule notice gives an October 23, 2023 effective date. A June 24, 2026 federal court order later vacated challenged provisions concerning material suppliers, delivery truck drivers and application of omitted clauses by operation of law. The weekly reporting obligation on covered construction remains. Get a project-specific coverage answer for disputed delivery or offsite work rather than copying a broad rule from an older presentation.

Where do I find the right prevailing wage rates?

Use the contract’s incorporated wage determination for federal work and the public buyer’s adopted rate schedule for Texas work, including applicable addenda and revisions.

Start a federal search at SAM.gov Wage Determinations. Choose the construction category, labeled Public Buildings or Works, rather than Service Contracts. If the packet supplies a determination number, search that number first. Otherwise, use the project location and construction category to locate the candidate schedule.

The DOL conformance guide identifies four construction categories: building, residential, highway and heavy. A library roof replacement and a water-line extension need separate scope reviews even when the same contractor bids both jobs inside the same county.

Save a copy in the estimate folder. My wage-sheet register has these fields:

Field to record What the estimator checks
Project and location Address, county and any additional work locations
Determination identifier Full number, modification or revision, and publication date
Construction category Match to the buyer’s description and incorporated documents
Labor classifications Each task assigned to a listed craft or a question for the buyer
Wage and fringe Separate columns, including relevant footnotes
Governing attachment Packet section and any addendum that replaces it
Payroll route Recipient, accepted format and submission deadline

When the packet and a current search result disagree, send both to the contracting office. Ask which revision governs the bid and whether the office will issue a correction. Save the written answer with the estimate; do not substitute a newer search result on payroll day.

Texas owners should start with the agency’s attachment. For example, the City of Austin’s capital procurement resources list section 00830 for wage rates and payroll reporting, plus 00830BC for building construction and 00830HH for heavy and highway work, revised August 17, 2026. Download the versions incorporated into your solicitation.

There is no single statewide hourly amount that answers a search for prevailing wage Texas. Chapter 2258 assigns the determination to the public body and requires rates in the call for bids and contract. The Texas public bid pages are a starting point for finding work; the job’s wage attachment is where the labor estimate starts.

Pricing labor before you bid

Add the required wage and fringe for each classification, then price employer burden and payroll administration separately before applying your overhead and margin.

Say you are pricing a six-week library roof replacement with three journeyworker roofers and one laborer. Assume the contract has already established the classifications and requires $31.70 in basic hourly pay plus $10.85 in fringe for each roofer, and $23.40 plus $7.15 for the laborer. Everyone receives the fringe in cash. Plan 40 hours per worker each week, with no apprentice rate or other earnings.

Those inputs carry through the weekly report below. Put your contract’s rates into the same worksheet before using it for a bid.

Crew item Basic wage per hour Cash fringe per hour Paid hours Weekly cash labor
Three roofers $31.70 $10.85 120 $5,106.00
One laborer $23.40 $7.15 40 $1,222.00
Crew straight-time total 160 $6,328.00
One roofer’s five extra overtime hours $47.55 $10.85 5 $292.00
Crew with that overtime 165 $6,620.00

The straight-time arithmetic is 120 × ($31.70 + $10.85) + 40 × ($23.40 + $7.15) = $6,328. The five extra hours cost 5 × (($31.70 × 1.5) + $10.85) = $292.00 under the example’s overtime assumptions.

Now compare that with a shop estimate using $27.35 for roofers and $20.65 for the laborer, with no fringe allowance. It produces 120 × $27.35 + 40 × $20.65 = $4,108. The shortfall is $2,220 per straight-time week, or $13,320 over six weeks. That is before correcting any employer burden calculated on the wrong payroll amount.

I would carry the wage worksheet into the government bid pricing review, alongside the takeoff. Keep a separate allowance for payroll preparation. For a planning allowance of 2.25 office hours at $38.40 each week, the reporting work costs $86.40 weekly and $518.40 over six weeks. Put software charges and setup time on their own lines if they apply.

Ask a subcontractor to state that its price includes the applicable wages, fringe and reporting obligations. Then check the exclusion list. A low subcontract quote with payroll administration excluded needs another cost line in your estimate.

Keep gross cash labor separate from the amount the worker takes home. Employee withholding reduces the check; it does not reduce the labor cost in the bid. Ask your preparer for the employer-side taxes and insurance burden that belong above these gross wages. If you use benefit-plan credit, carry the plan cost once in the estimate and the remaining cash fringe once. Review that worksheet with the person buying the benefits so a cost is neither omitted nor counted twice.

Set up payroll before the first shift

Give the foreman and payroll preparer one approved job setup containing the wage sheet, classifications, fringe method, workweek and reporting instructions before anyone clocks in.

I would bring the estimator and foreman into the payroll setup meeting. Walk through who will handle tear-off and installation, then assign the wage codes for those tasks. Resolve any staffing difference from the estimate before loading the timecard choices.

Use this startup sequence:

  1. Assign a project code that matches the buyer’s project identifier.
  2. Attach the governing wage schedule and record the classifications the crew will use.
  3. Enter basic wages separately from cash fringe and benefit-plan credits.
  4. Set the established workweek and payday, then obtain the buyer’s reporting calendar.
  5. Give the foreman a daily time sheet that records work by person, project and classification.
  6. Run one sample week through payroll and the reporting format before the first live submission.
  7. Appoint the person who verifies the report and the official who signs it.

For a new classification, give the foreman a written instruction naming the task to record and the office contact who resolves questions, so an employee standing on a roof is not left choosing among several similar wage codes without knowing which one matches the work.

I would also require a daily note when the scope changes. Moving a worker from roofing to another craft needs a time record that the preparer can use. A note saying only “helped other crew” leaves the wage decision to someone who never saw the work.

DOL’s payroll and overtime guidance requires covered workers to be paid weekly, with certified payroll delivered within seven days after the regular payment date. A weekly report does not make a biweekly paycheck schedule compliant. Confirm the submission route with the buyer and schedule an internal review before its deadline. Ask how it wants weeks without covered work reported.

The reusable company documents in a government bid paperwork file can save time on the next submission. Weekly hours still have to come from the field. I would test whether a substitute foreman can enter a correct timecard using only the setup sheet; if that takes a long explanation, simplify the sheet before work starts.

After startup, I would use four handoffs each week. The foreman approves the daily detail at the timecard cutoff. The preparer calculates payroll and resolves missing codes before payment. The reviewer compares the report with the paid register. The certifying official signs the reviewed version, and the assigned person submits it. Put a backup beside each name. If the owner is away when payroll is due, the office needs an agreed route to an authorized signer and the supporting records.

How to fill out the current WH-347

The current WH-347 separates basic wages, benefit-plan credit and cash fringe, then carries project earnings through to all-work deductions and net payment.

Use DOL’s current form PDF, revised January 2025 with an OMB expiration of January 31, 2028. An older workbook can use different columns. Check its output against the current form before copying a tutorial’s cell references.

Start with the header

Enter project identifiers, business information, location, week ending, payroll number and the applicable determination with its revision. Mark prime contractor or subcontractor. Reserve the final-payroll checkbox for the final week of your work.

The following map follows DOL’s WH-347 instructions:

Column Entry
1A Sequential entry number starting at 1; repeat for additional classification rows
1B to 1D Last name, first name and middle initial
1E Worker identifier; exclude the full Social Security number
2 J for journeyworker; RA and progression level for registered apprentice
3 Classification of work performed
4 Daily project hours, split between ST and OT
5 Weekly totals from the daily entries
6A Hourly wages paid for ST and OT, excluding cash fringe
6B Total benefit-plan credit for the reporting period
6C Total cash paid instead of fringe benefits
7A Gross earnings on this project
7B Gross earnings for all work that week
8 All-work deductions, itemized and totaled
9 Net payment for all work

Build the report from paid payroll

My review starts with approved timecards, then the paid payroll register. Match the daily hours before reviewing money. Match each rate against the job setup. Recalculate one worker’s line manually and compare it with the export.

Do not estimate deductions from the bid worksheet. Pull them from payroll. For a worker who also worked elsewhere that week, the all-work columns need the corresponding earnings and deductions; do not prorate deductions to this project’s share.

For an extension of the example, suppose worker 102 spends 34 hours on the library and six hours elsewhere, earning $183.30 on that other job. The library’s 34 × $42.55 produces $1,446.70 in column 7A. All-work gross becomes $1,630 in 7B, with 40 total hours. Use the revised paid register for deductions and net pay, rather than retaining the deductions from the one-project example. My reviewer would flag a report whose two gross columns always match despite timecards showing employees moving between jobs.

Finish the certification

Page two identifies the certifying official beside six certification boxes and any applicable program details. The signer must have paid or supervised payment and know the facts being certified for that week. DOL does not require notarization of this statement. Use the agency’s accepted signature process.

My signoff folder pairs the report with its timecards and evidence of payment. I would return a draft with a missing daily entry before asking anyone to certify it.

A filled-in week for four workers

For the library roof example, four workers earn $6,620.00 in gross cash pay during a 165-hour week, including five overtime hours for one roofer.

Use a Monday-through-Sunday workweek ending November 1, 2026. All work is on this project. Workers 101, 102 and 103 are journeyworker roofers; worker 104 is a laborer paid at the full applicable rate. Enter J in column 2 for all four. The worker numbers below are identifiers for column 1E; use entry numbers 1 through 4 in column 1A. They let you follow each worker through the tables without printing names here. A submitted report also needs the required names and header information.

Daily hours feeding columns 4 and 5

Worker Mon 10/26 Tue 10/27 Wed 10/28 Thu 10/29 Fri 10/30 Sat 10/31 Sun 11/1 ST total OT total
101, roofer 8 8 8 8 8 5 OT 0 40 5
102, roofer 8 8 8 8 8 0 0 40 0
103, roofer 8 8 8 8 8 0 0 40 0
104, laborer 8 8 8 8 8 0 0 40 0

On the federal form, put the Saturday overtime in the OT row. The table combines the two rows for easier reading.

Earnings feeding columns 6 and 7

Worker 6A ST / OT hourly wage 6B plan credit 6C cash fringe total 7A project gross 7B all-work gross
101 $31.70 / $47.55 $0.00 $488.25 $1,994.00 $1,994.00
102 $31.70 / no OT $0.00 $434.00 $1,702.00 $1,702.00
103 $31.70 / no OT $0.00 $434.00 $1,702.00 $1,702.00
104 $23.40 / no OT $0.00 $286.00 $1,222.00 $1,222.00
Totals $0.00 $1,642.25 $6,620.00 $6,620.00

Worker 101’s wage earnings are 40 × $31.70 + 5 × $47.55 = $1,505.75. Cash fringe adds 45 × $10.85 = $488.25. Gross pay is $1,994.00. Worker 104 receives 40 × $23.40 = $936 in wages and 40 × $7.15 = $286 in cash fringe.

Deductions and payment feeding columns 8 and 9

Assume the regular payroll register supplies the following lawful deduction amounts, with no other deductions. The withholding figures are inputs from that register, not a tax calculation worksheet.

Worker Tax withholding FICA Other 8 total deductions 9 net paid
101 $176.24 $152.54 $0.00 $328.78 $1,665.22
102 $137.18 $130.20 $0.00 $267.38 $1,434.62
103 $121.42 $130.20 $0.00 $251.62 $1,450.38
104 $68.37 $93.48 $0.00 $161.85 $1,060.15
Totals $503.21 $506.42 $0.00 $1,009.63 $5,610.37

The check is $6,620.00 minus $1,009.63 = $5,610.37. Compare that net total with the payments released, then match each individual payment. A crew total can agree while two workers’ deductions have been swapped.

Review column 6C against hours as well. Worker 101 has five more covered hours than the other roofers, so that worker’s cash fringe exceeds theirs by 5 × $10.85 = $54.25. That difference gives the reviewer a quick way to catch a fringe calculation that stopped at 40 hours.

For page two of the current WH-347, check certification boxes 1, 2, 3, 5 and 6 for this all-cash week. Leave box 4 unchecked and enter N/A in the apprenticeship subsection. The hourly plan-credit subsection stays blank because column 6B is zero. Have the authorized official sign and date the statement, then retain it with the payroll register.

Cash fringe versus benefit plans

Davis-Bacon fringe can be paid in cash, through creditable benefit plans or in combination, but the hourly credit must match benefits the employer provides.

For an owner starting a small public job without an established credit calculation, I would price the cash method first to expose the whole pay obligation in the estimate while the payroll preparer checks whether existing benefits support a documented credit. That gives the estimator a starting figure.

DOL Fact Sheet 66E explains the available methods and excludes costs such as legally required benefits and the contractor’s own benefit administration. Workers’ compensation and payroll taxes do not become fringe credits because they appear in labor burden. An unfunded benefit arrangement requires DOL approval before credit is claimed.

The comparison for a 40-hour roofer week looks like this, assuming a documented $4.75 hourly plan credit:

Method Basic wages Cash fringe Plan credit Gross cash pay
Entire fringe in cash $1,268.00 $434.00 $0.00 $1,702.00
$4.75 plan credit plus cash balance $1,268.00 $244.00 $190.00 $1,512.00

In the second row, $10.85 minus $4.75 leaves $6.10 per hour in cash fringe. Forty hours produce $244 in cash fringe and $190 in plan credit. The $190 belongs in 6B, with the hourly support on page two. It is not cash wages paid to the worker.

Check the denominator used to establish the credit. DOL’s benefit calculation guidance generally requires annualization over covered and noncovered hours, subject to exceptions. With $9,120 in creditable annual employer contributions for one worker and 1,920 covered and noncovered hours for that worker, the hourly amount is $4.75. Dividing that same contribution by only 640 public-job hours would produce $14.25, a very different claim.

I would keep the calculation and plan support beside the wage setup, then review the credit when eligibility or contributions change. A deduction from an employee’s paycheck is not an employer contribution you can count again.

Overtime when the crew works more than 40 hours

Federal overtime generally uses the required basic or regular rate after 40 hours in a workweek, with Davis-Bacon fringe still due on covered overtime hours.

The DOL overtime explanation distinguishes the contract overtime law from the Fair Labor Standards Act, which can apply across public and private work, so the preparer needs the whole week’s time before deciding how many hours belong in overtime. State law or contract terms can add requirements.

For worker 101, the rate assumptions make the calculation straightforward:

  • Basic overtime wage: $31.70 × 1.5 = $47.55.
  • Fringe for each covered overtime hour: $10.85.
  • Cash for one such hour: $47.55 + $10.85 = $58.40.
  • Five hours: $58.40 × 5 = $292.00.

The fringe does not stop at hour 40. Multiplying the entire $42.55 package by 1.5 would instead produce $63.825 per hour. These are different calculations.

Before using the example’s $31.70 base for someone who earns more, read DOL’s fringe guidance, which distinguishes designated cash fringe from a higher regular wage paid even on work without a fringe requirement and explains why a payroll label cannot establish an overtime exclusion. Check the employee’s regular pay arrangement.

A worker moving between classifications or jobs needs another calculation. Ask the preparer to document the applicable regular-rate method and the overtime allocation. The question to resolve is which earnings enter that calculation, not just which job received the last hours on Friday.

I would require foreman approval before adding Saturday hours to this roof replacement. That approval should show both the $292.00 labor addition and any supervision or access costs the extra shift creates. It also gives payroll advance notice to check the workweek rather than discovering the overtime after a report has been drafted.

Apprentices and workers who switch classifications

A reduced apprentice wage needs a qualifying registered program and permitted ratio; other workers need the rate for the tasks they perform, supported by daily records.

DOL’s apprenticeship answers describe individual registration and approved probationary eligibility, wage progression and ratio requirements. Check the rules for the project’s locality when it differs from where the program is registered. A new hire is not automatically an apprentice. Keep the program evidence available before using a reduced rate.

Have the foreman check apprentice coverage against each day’s staffing. DOL’s compliance principles assess the ratio daily. If a supervising journeyworker is absent or leaves early, record the change and check the apprentice’s permitted hours before closing that day’s timecard.

Fringe needs its own check. Under DOL’s fringe rules, the approved apprenticeship program governs benefits; when it is silent, the full fringe for the applicable classification is generally required. Do not multiply the fringe by the apprentice wage percentage without support in the program.

For workers changing crafts, enter the time when the change happens. WH-347 instructions call for separate classification rows and require the highest applicable prevailing rate for all hours when an accurate breakdown was not maintained. “Laborer” cannot serve as a catchall code for everything the crew does.

Change worker 104’s week to 28 hours of laborer work and 12 hours of roofing, using the example’s already-established classifications. Cash pay becomes 28 × $30.55 + 12 × $42.55 = $1,366, rather than $1,222. The $144 difference follows the work recorded. Your timecard needs to identify which dates and hours belong on each classification row. If the preparer receives only a 40-hour total, that person cannot reconstruct the split from the employee’s usual job title.

If a classification seems missing, send the task description to the contracting office. DOL’s conformance process uses SF-1444 or similar documentation for eligible missing classifications. It does not authorize inventing a cheaper title for work already covered by an existing classification.

My written request would pair the determination revision with a description of the task, identify the project and ask which listed classification applies or whether a conformance is needed. Attach the scope page. Keep the response with the job setup so the same question does not return every payday.

What happens if certified payroll is wrong?

Underpaid public-works wages can require back pay and trigger withholding or penalties; an inaccurate report needs correction supported by payment and time records.

Texas section 2258.023 sets a $60 penalty for each underpaid worker for each calendar day or part of a day, subject to the public body determining and specifying rates and, for a municipality collecting the penalty, a population exceeding 10,000. Read those conditions with the contract’s penalty paragraph.

For four workers underpaid across five calendar days, the penalty arithmetic is 4 × 5 × $60 = $1,200, apart from the wage shortfall. Do not budget a few missing dollars per hour as though that were the whole exposure.

For Davis-Bacon, DOL’s remedies guidance describes withholding to cover wage liabilities and monetary relief, including interest. Disregard of obligations can lead to three-year debarment. Paying back wages does not automatically remove that possibility. Falsified payrolls are among the conduct DOL identifies in its debarment discussion.

When I find an error, I would use this correction file:

Record What the reviewer needs to see
Original report Which payroll number and entries need correction
Error worksheet Worker, classification, dates, hours and pay difference
Supporting time Foreman’s approved detail for the affected work
Payment evidence Amount and date of any supplemental payment
Revised report Corrected figures and signed certification
Submission record Recipient, date and buyer’s acknowledgment or response

Fix the payroll and the report together. Changing the gross column to match the determination does not pay the worker. Conversely, a supplemental payment left out of the correction record makes the next review harder.

Ask the buyer how it wants corrected reports numbered and identified. Preserve the original instead of overwriting it. Then search the following weeks for the same setup error. If the fringe code was wrong, the next report is likely using it too.

Close the correction with a short explanation of what changed in the setup. If the preparer selected an outdated wage code, remove that code from the foreman’s choices for this project after preserving the history. If the field record lacked a craft change, revise the timecard instructions. Assign someone to check the next payroll against the correction before filing it.

Software and who can prepare certified payroll

A bookkeeper, payroll service or trained office employee can prepare the weekly report, provided the job setup and paid payroll support what the authorized official certifies.

I would ask the buyer what it accepts before choosing between a reviewed worksheet for one four-person job and a system that can handle several crews moving among classifications and projects without requiring the preparer to rebuild every report by hand. Test the required output. The best certified payroll software for that workload is the one your preparer can reconcile to payroll and submit in the buyer’s required format.

Before buying anything, use the four-person week as an acceptance test. Enter the hours and separate cash fringe. The output should reproduce $6,620.00 in gross cash pay and keep the $1,642.25 cash fringe visible in the proper field. Then add a second project and verify the all-work columns.

My software checklist is short:

  • Separate wage schedules and revisions by project.
  • Daily hours and multiple classifications for one employee.
  • Different fields for cash fringe and plan credits.
  • Access to the paid payroll deductions and net amounts.
  • A correction history and an export you can retain.
  • The buyer’s accepted report and signature method.

DOL’s WH-347 signature instructions require an original handwritten signature or a legally valid electronic signature. An electronic process must verify the signer’s identity and show acceptance of the report. A pasted signature image or scanned signature alone does not satisfy that requirement.

Before an outside preparer quotes the work, ask which rate setup and benefit-credit reviews the fee includes. Decide who answers classification questions, and set a timecard cutoff that leaves room to resolve them before signature. Assign storage of the filed version.

Ask for a sample deliverable before agreeing to a preparation fee. Does the engagement include setting up the determination, producing each employer’s report, reconciling it to payments and responding to rejected submissions? A quote for generating a PDF can leave those tasks with your office. Count the hours your staff will still spend supplying records and reviewing exceptions. I would compare services using that division of work, plus the buyer’s accepted output, before comparing fees.

The certifying official has to know what was paid. I would not send an unsigned draft around the office until somebody signs it to clear the inbox. Assign the official at setup, give that person the supporting file and make review time part of the weekly schedule.

Subcontractor payroll and the records to keep

Collect each subcontractor’s required weekly report and supporting corrections in a project register, then retain the records for the applicable period after the prime contract’s work ends.

A general contractor taking public work needs a reporting plan for subcontractors before mobilization. DOL’s investigation guidance states that prime contractors are responsible for subcontractor compliance and liable for unpaid wages. Waiting until the pay application arrives leaves little time to resolve a missing week.

Keep a register with one row per employer and reporting week. Record the reviewer and any unresolved questions. Track final-payroll status separately from the last invoice so an outstanding correction stays visible after billing ends.

For each weekly review, compare the reported crew with field records. Check that the classifications fit the scope and that the fringe method agrees with the job setup. Ask about unexplained differences in hours. Do not change a subcontractor’s report on its behalf; request a corrected submission with its certification.

Retain daily time alongside the governing wage schedule and paid payroll records, with benefit support attached to submitted reports. DOL’s recordkeeping guidance requires contractors to preserve required records for at least three years after all work on the prime contract is finished. That includes payroll support and covered contracts with related documents. Use the prime contract’s completion date in your retention calendar, even if your crew finished earlier, and check for longer contract requirements.

For Texas records, section 2258.024 requires worker names, occupations and wages, open to the public body’s inspection. The federal weekly form is not a substitute for keeping the underlying evidence.

At closeout, review the payroll register alongside the bid package checklist and contract requirements. Confirm that the final report was sent and corrections were resolved while the foreman is still available to explain field records. Export the accepted reports before shutting down access to a project portal.

How Bid Team keeps the job paperwork moving

Bid Team helps you organize the public bid and its requirements before submission, so the labor estimate and the packet reach the deadline together.

Bring the wage attachment and your payroll preparer into the bid planning conversation. Resolve setup questions with the estimator before you commit to the job and its labor cost.

With Bid Team’s help on the public bid packet, the bid work includes:

  • Planning the bid with Rafael and deciding which jobs fit your crew.
  • Organizing the buyer’s forms and requirements for the response.
  • Preparing forms from your company information, with the Bid Passport supporting repeat submissions.
  • Working through addenda so changed attachments reach the bid review.
  • Handling the bid’s notary pages and portal account work.
  • Keeping the deadline in view while you review your number, sign and send.

For an owner doing the forms in-house, Bid Builder guides each form, fills from the company file and lets you text a bid expert. Bid Team is the flat monthly membership for owners who want the paperwork done with them, with as many bids as they want. Bid Team costs less than any bid writer, bid consultant or in-house bid coordinator, and less than any other done-for-you bid service.

Use a free 15-minute call with Rafael to walk through the job you want and the bid papers in front of you. Bring the rate sheet before you commit a labor number.

Questions people ask

Quick answers

What is certified payroll for public works?

It is a payroll report and signed compliance statement documenting covered workers' classifications, hours, wages, benefits and payment. Davis-Bacon construction requires weekly reporting. WH-347 is the optional federal form; a state or local buyer can specify its own reporting system. Use the wage determination and instructions incorporated into that project's contract.

Is prevailing wage the same as the hourly rate on a paycheck?

No. A Davis-Bacon determination can require a basic hourly wage plus fringe benefits. The fringe obligation can be satisfied through cash, creditable benefit plans or a combination. Take-home pay is lower than gross cash pay after lawful deductions, and benefit-plan contributions are separate from the money deposited into the worker's account.

Does Texas require certified payroll?

Texas Chapter 2258 requires prevailing wages on covered public works and records of workers' names, occupations and wages. The chapter does not prescribe one statewide WH-347 submission process. Read the buyer's payroll specifications for its form, delivery method and deadlines. A federally assisted Texas job can also carry Davis-Bacon reporting requirements.

Is WH-347 mandatory on every Davis-Bacon job?

No. DOL makes WH-347 available for optional use, while the required payroll information and signed Statement of Compliance remain mandatory. An accepted equivalent or agency reporting portal can satisfy the reporting requirements. Confirm the buyer's format before choosing software or building a spreadsheet around an old form.

How often do I submit Davis-Bacon certified payroll?

Weekly. DOL's guidance describes delivery within seven days after the regular payment date for the payroll period. Establish the recipient and submission route with the buyer before work begins. Put payroll preparation and certification on the calendar separately from the crew's timecard cutoff, and ask how the buyer handles weeks without covered work.

Do fringe benefits have to be paid on overtime hours?

Yes. The Davis-Bacon fringe obligation applies to covered overtime hours as well as straight-time hours. The fringe amount ordinarily does not receive an extra half-time premium. Calculate overtime using the legally required basic or regular rate, including any higher rate that applies, rather than automatically multiplying the entire wage-and-fringe package by 1.5.

Can my bookkeeper prepare certified payroll?

Yes, a bookkeeper or outside payroll preparer can assemble the report. The certifying official must be the contractor, subcontractor or an agent who paid or supervised payment and knows the facts being certified. Agree who verifies classifications, benefit credits and payroll totals before the first weekly report is due.

Can I pay a new helper the apprentice rate?

Only when the worker qualifies under the applicable registered apprenticeship rules, including any approved probationary status, wage progression and permitted ratio. Calling a new hire an apprentice does not qualify them for a reduced rate. Without a valid apprentice basis, pay the wage required for the classification of work performed.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. Fact Sheet 66: Davis-Bacon and Related ActsU.S. Department of Labor: Federal construction coverage, the over-$2,000 Davis-Bacon threshold, wage components and weekly obligations; checked November 2026.
  2. Texas Government Code Chapter 2258Texas Legislature: Public works coverage, maintenance exclusion, agency rate determinations, records and the conditions on the $60 penalty; checked November 2026.
  3. Davis-Bacon construction guidance and 2023 final rule noticeU.S. Department of Labor: October 23, 2023 rule effective date and construction guidance. Its litigation notice still describes the 2024 injunction; the June 2026 court order below supplies the later disposition. Checked November 2026.
  4. June 24, 2026 federal court order vacating challenged Davis-Bacon provisionsU.S. District Court for the Northern District of Texas: Primary court order, document 107, concerning material suppliers, truck drivers and omitted contract clauses; checked November 2026.
  5. Wage DeterminationsU.S. General Services Administration: Official federal wage determination search, including the distinction between construction and service determinations; checked November 2026.
  6. Capital Procurement Resources and wage rate documentsCity of Austin: Lists payroll reporting section 00830 and building and heavy/highway rate attachments, revised August 17, 2026; checked November 2026.
  7. Current WH-347 instructionsU.S. Department of Labor: Current column definitions, worker identifiers, all-work deductions, page-two certification and authorized signers; checked November 2026.
  8. WH-347 weekly certified payroll formU.S. Department of Labor: January 2025 revision, OMB approval expiring January 31, 2028, current header fields and six certification boxes; checked November 2026.
  9. Davis-Bacon Compliance PrinciplesU.S. Department of Labor: Benefit credit calculations, electronic submission and signature requirements, daily apprentice ratios and records access; checked November 2026.
  10. Fact Sheet 66E: Fringe benefit requirementsU.S. Department of Labor: Cash versus benefit plans, noncreditable expenses, annualization, unfunded plans and fringe payments on overtime hours; checked November 2026.
  11. Davis-Bacon and Related Acts frequently asked questionsU.S. Department of Labor: Apprentice registration, permitted ratios and classification requirements; checked November 2026.
  12. Investigative Procedures and Remedies on Davis-Bacon ContractsU.S. Department of Labor: Underpayment investigations, withholding, interest and three-year debarment for disregard of obligations; checked November 2026.
  13. Davis-Bacon wage determination conformance request guideU.S. Department of Labor: Construction categories, missing classifications, conformance criteria and the SF-1444 process through the contracting agency; checked November 2026.
  14. Construction worker protections: payroll and overtime questionsU.S. Department of Labor: Weekly submission timing, overtime across jobs and classifications, fringe payments and payroll records; checked November 2026.