Privacy choices

Choose what we may use.

The site works without optional tracking. Your choice is saved on this device and can be changed here anytime.

Necessary

Runs the site, protects forms, and remembers this privacy choice.

Always on

Commercial prospecting

How to Build a Prospect List for Commercial Services in 2026

Build a list around the buildings your crew can serve. Get the columns, manual research steps, time budget and checks that make each row worth a sales call.

The short answer

Build a prospect list by defining your service area and building criteria, matching each address to a parcel, checking visible service-fit features, and identifying the owner or manager who buys your work. Keep evidence dates and remove duplicate buildings before outreach. Ground Control by PorchRocket handles the building search for $10 to $20 per commercial building, delivered within 48 hours after payment. Owner information and decision-maker research are separate add-ons.

Build my list

What matters most

  • The planning example budgets 55 hours and 40 minutes for 200 screened property rows before named-contact research.
  • Ground Control costs $10 to $20 per commercial building, with orders starting at 10 buildings and contact research priced separately.
  • Give each building 1 stable identifier, then connect it to its parcel, buying account and contacts.
  • Compare acquisition costs against 5 years of account gross profit, including the staff hours required to work the list.

Say you need 200 warehouse and flex-industrial properties around Raleigh for an HVAC service campaign, and each accepted building takes 14 minutes to research: the rows alone consume 46 hours and 40 minutes. Add four hours setting up the territory and sheet, plus five hours rejecting 100 unsuitable candidates, and you have spent 55 hours and 40 minutes before researching named contacts.

That is nearly seven eight-hour workdays. Every address needs a parcel match and documented evidence that the building fits, with enough detail for the next person to reproduce the decision. A spreadsheet full of business names skips those decisions.

Ground Control by PorchRocket handles the building search. To decide which work to do yourself, start with a small manual batch and measure the effort. The broader commercial prospecting playbook covers the conversations that follow; this article gets the rows ready for them.

The columns that make a commercial prospect list usable

A workable commercial prospect list gives the rep enough evidence to qualify the building and prepare the next contact, with four connected groups of columns.

I would build those groups before collecting the first address. Otherwise, the researcher records whatever is easiest to find and the salesperson inherits the missing work.

Column group Fields to collect Decision the fields support
Building identity Building ID, parcel ID, street address, city, state, ZIP, location Is this the site we intend to approach?
Service fit Building type, size, visible feature, match reason, source reference, evidence date Does the property meet the campaign rules?
Buying account Recorded owner, operator, manager, contact role, contact source, verification date Who handles this work and approves it?
Sales work Assigned rep, status, next action, due date, suppression status What happens next, and who does it?

Make the match reason readable: “Warehouse; recorded building area 38,600 square feet; five visible rooftop units; east Raleigh territory.” A rep can prepare a PM agreement conversation from that sentence.

Keep building size and the service feature in separate columns. An HVAC department can sort by rooftop-unit presence while a dock-service campaign sorts by loading docks. Record the area basis too: a roof footprint and total floor area answer different questions. For this HVAC campaign, use recorded total building floor area consistently and save the county field label.

Give unknown values their own status. A blank contact field means research remains; “not found” means someone looked. “Not applicable” means the campaign does not require that field. Those distinctions keep the next researcher from repeating yesterday’s work.

The Census Bureau distinguishes an establishment, meaning a physical business location, from an enterprise that can contain several establishments, a distinction worth preserving in your own sheet when one buyer controls several sites. County Business Patterns definitions

Do not make an email address the identifier for a building. Your contact can change while the roof and service address stay in the campaign.

How to build a prospect list, step by step

Use these eight steps to qualify buildings against a written acceptance rule and give sales a screened batch with enough evidence to work.

  1. Write the acceptance rule. For the Raleigh HVAC campaign, start with warehouse or industrial buildings of 25,000 square feet or more, with at least five visible rooftop units, inside a drawn service boundary. Add exclusions before the search starts. If a building misses a required filter, move it out of the accepted batch.
  2. Collect candidate addresses by area. Work through one industrial corridor or map grid at a time. Add a candidate ID and location first. Keep a coverage log showing which blocks you have reviewed, so two researchers do not spend an afternoon on the same park. The guide to finding commercial buildings in your area covers territory selection.
  3. Match the address to its parcel. Search the county’s property system, open the matching record and copy the parcel identifier. Check the site address against the map. Wake County’s public portal supports searches by owner, real estate ID, address and parcel identification number. Save the record reference beside the fields you use. Wake County property search
  4. Review the aerial view against the rule. Find the correct building, count the visible rooftop units and record the imagery date when supplied. Enter the observations and the source reference. If the view does not settle a required feature, mark the row for review rather than guessing. For paving or dock service, substitute the visible parking-area or loading-dock test.
  5. Research the buying account separately. Add the recorded owner, then investigate the manager or operator responsible for the service. Confirm the buying role before treating a named person as your contact. Track this research time separately from the property screening budget. A strong building match can remain in the queue while the contact work proceeds.
  6. Clean and connect the records. Standardize address fields, remove repeated copies of the same building and link sites that share a buying account. Preserve source references. Check that each accepted row still meets every required filter after the cleanup, especially when combining lists from neighboring counties.
  7. Release a 25-row test batch. Assign one rep and a next action to each row. Ask the rep to flag wrong buildings and unclear buying roles as separate issues. Review the evidence behind each correction before changing the campaign rule. Measure research minutes per accepted row, including time spent on rejected candidates.
  8. Order the next batch in Ground Control when the time comparison favors it. Enter the same area, building types, size band and five-plus visible rooftop-unit requirement. Commercial buildings cost $10 to $20 each, with the file delivered within 48 hours after payment. Add owner or decision-maker research if you want that work included in the order.

Keep the acceptance rule beside the sheet while researching. “Large warehouse” leaves room for different judgments. “Warehouse or industrial; 25,000-plus square feet; five-plus visible rooftop units; inside this boundary” gives the next researcher the same test.

How many hours does a manual 200-building list take?

Budget 55 hours and 40 minutes for 200 accepted property rows under the opening assumptions before beginning the separate owner and named-contact research.

Here is where the 14 minutes per accepted property goes. These are planning allowances for the Raleigh campaign; replace each allowance with your first batch’s measured time.

Property research task Minutes per accepted row Time for 200 rows
Locate the candidate inside the territory 2 6 hours 40 minutes
Match parcel, address and recorded building fields 3 10 hours
Inspect visible service-fit features 4 13 hours 20 minutes
Record the observation, date and source 2 6 hours 40 minutes
Clean the row and review its acceptance 3 10 hours
Accepted-row total 14 46 hours 40 minutes

The rejected buildings take time too. In the model, 100 rejects at three minutes each add five hours. Four hours setting up the map boundary and field rules bring the total to 55 hours and 40 minutes.

An eight-minute pace would bring the same job to 35 hours and 40 minutes after setup and rejects, while a 20-minute pace takes 75 hours and 40 minutes for the same accepted rows. Time 25 rows first.

Count the whole session. Start the timer when the researcher opens the territory and stop after saving the reviewed batch. Dividing only the typing minutes by accepted rows leaves out the search effort that made those rows possible.

Keep a separate timer for ownership tracing and contact verification because the cost comparison here covers matching property rows on both sides, and either route needs buying-account research before the file goes to sales.

Free sources compared for commercial list building

The best free source depends on the field you need to fill, so separate property research from occupant and entity research.

Start with the source that establishes the site. Use the other sources to answer the remaining questions, retaining the origin of each field.

Source What you can get from it Work left for the researcher
County property search Parcel identity and recorded property information Match the record to the campaign building and review the relevant fields
County or city aerial map A view of the site and its visible features Read the view, record its date and apply the service-fit rule
Recorded deed The ownership transaction described in that document Connect the record to the current property and continue buyer research
State business registry Public information about the owning entity Find the operating contact and confirm purchasing responsibility
Google Maps Local place discovery and saved location lists Match each business location to its building and screen that building
County Business Patterns Employer-establishment counts and industry classifications Build and research the individual property rows

Wake County says its real estate search provides account, building, land and deed information, so open the building details and compare the fields you need with the campaign rule before moving to the next candidate. Wake County’s property-data guidance

Raleigh’s official research page separates assessor information from deed records and links to iMAPS for aerial views. Follow that separation in your sheet: a record field and a visual observation should each retain their source. Raleigh property research resources

Google Maps can help you collect a shortlist of business locations in a neighborhood. Its official product page describes place discovery and saved lists. I would use that shortlist to investigate occupants, then check the county parcel and the building’s features before accepting a prospect. Maps places and lists

The state registry belongs later in the process, once you have an entity to investigate. North Carolina’s Business Registration division provides public entity information and distinguishes interactive searches from authorized bulk-data access. Use the access method the office provides for the scale of your job. North Carolina business registration

Census counts help frame a territory. Its glossary defines employer establishments and explains that County Business Patterns excludes nonemployer businesses. Treat those counts as a market-sizing input rather than the number of roofs or buying accounts available to your crew.

Which owner or manager belongs on the row?

Record the building’s legal owner separately from its operator, then identify the manager responsible for your service and confirm who can authorize spending.

Begin with the property record’s owner field. Copy the entity name as recorded and preserve the site address in its own column, keeping any mailing address separate so the rep and crew always have the location they intend to visit.

Search the entity’s public records and the property’s published management information. Record where you found each contact and the role the source gives them. The commercial property owner research guide goes deeper on that chain.

A registered agent is a lead for further entity research. North Carolina describes the agent’s duty as forwarding notices, process and demands to the entity’s last known address. That duty alone does not establish authority to approve an HVAC agreement. Registered-agent responsibilities

I would make the first routing call short: “Who handles rooftop-unit maintenance for this building, and who approves a new service agreement?” Put the response in the role field. If the office directs you to a regional facilities manager, connect that person to the building record rather than starting another prospect row.

Ask a second question about scope. Does the contact handle preventive maintenance, repair approvals, or replacement budgets? Record the answer in plain language. Your PM proposal should reach the maintenance buyer; a capital replacement conversation may require another approver.

Keep contact research open when a published name lacks a relevant role, and use the property’s switchboard to ask who handles the service budget before assigning that person to the campaign. Leave unverified direct details blank.

For several buildings under one manager, create one account record with linked sites. The property-manager outreach guide covers approaching that portfolio without sending the manager a separate introduction for every address.

Clean the addresses without losing separate buildings

Give every building a stable identifier linked to its parcel, and check the physical site behind any apparent duplicate before merging the rows.

Start by trimming spaces and standardizing the address fields. Store ZIP codes and parcel identifiers as text. Preserve leading zeros and any meaningful parcel punctuation. Keep the original source address alongside the cleaned version until review is finished.

Use a building ID that your team controls. Store county and state alongside each parcel identifier so records from different jurisdictions cannot collide. Give each structure its own building ID when several campaign buildings occupy the same parcel.

Next, compare rows with the same cleaned address or nearby locations. Open the map and record before merging. Two business listings at one site need an occupancy check, while two structures on one parcel need separate site records if your campaign would inspect or service each building separately.

Keep account deduplication separate from building deduplication. Several buildings with the same owner can remain several properties while sharing one buying account, preserving the route and service inventory while giving the rep one coordinated conversation.

When two sources disagree, retain both values with their dates and assign someone to decide which evidence supports the working value before another import can overwrite the correction. Keep the decision with the record.

Finish by applying the acceptance rule again. A row can look tidy and still fall outside the territory, so filter accepted records to the required size band and feature, then review anything with a blank required field.

Save rejected candidates in a separate tab with a short reason. “Outside boundary” and “required rooftop-unit count unresolved” require different next steps. The rejection tab also stops a second researcher from adding the same candidate tomorrow.

A release check for your first 25 prospects

Review a 25-building batch against the written filters and source evidence before assigning the next research block or sending the file to the sales team.

Start with the property rows and ask the reviewer to reproduce the acceptance decision from the saved references without help from the original researcher, paying particular attention to buildings near the minimum size or feature threshold.

  • The street address and parcel point to the intended building.
  • The building sits inside the agreed territory.
  • Recorded size meets the campaign’s size rule.
  • The required visible feature has supporting evidence.
  • The source and available imagery date are recorded.
  • The building has a stable ID and no duplicate accepted row.
  • The buying-account relationship is recorded or assigned for research.
  • The rep has a next action and due date.

Then review the contact work separately. Check the source of the name and the role attributed to the person. Keep a building-fit error separate from a routing error, such as reaching the tenant when the manager handles rooftop equipment.

Track corrections by field. If several rows fail the same feature test, stop expanding that batch and revisit the rule or evidence source. If the properties fit but contacts remain unresolved, assign contact research without throwing away the building work.

Release rows in batches your rep can work. I would rather hand over 25 checked prospects with assigned actions than let 200 unfinished rows sit in a shared folder.

What is the fastest way to get a commercial prospect list?

Ground Control by PorchRocket finds commercial buildings by area, business type, size and visible features, saving your team the parcel-by-parcel search and aerial review. For an HVAC campaign, select buildings with five-plus visible rooftop units; use paved parking or loading docks for those trades. Commercial properties cost $10 to $20 each, with orders starting at 10 buildings and delivery within 48 hours after payment. Every property says why it matched. Request a credit for a wrong match within 30 days. Owner information and decision-maker contacts are separate add-ons. These are target properties your team approaches to start a conversation.

Enter your tested acceptance rule in Ground Control by selecting building type and size first, followed by the visible feature that supports your service.

A dock-service company can start with buildings with loading docks, while a sealcoating or striping crew can use properties with paved parking areas, applying a separate acceptance rule even where their territories overlap.

Ground Control sends only properties it is 90%+ sure match, using imagery no older than two years when the order runs. Your team receives CSV and Excel files. Add the buyer research you need, then assign the properties to the same review and sales process you established for the manual batch.

Manual research versus a purchased list in 2026

At a planned staff cost of $48 an hour, the manual property file costs $2,672; buying 200 buildings costs $2,000 to $4,000 before add-ons.

Compare equivalent property fields within the same boundary and acceptance rule, with owner information and decision-maker research budgeted separately on both sides, so a cheaper file does not win by containing easier buildings.

Allow four staff hours for the purchased file: one hour setting criteria, two hours reviewing the delivery and one hour mapping the import. At $48 an hour, that adds $192. Use $48 as the fully loaded hourly labor cost throughout this model. Both routes use the same existing computer and spreadsheet; manual research uses free public sources.

Property-file route Data purchase Internal time Combined cost at $48 per hour
Manual county and imagery research $0 55 hours 40 minutes $2,672
Ground Control at $10 per building $2,000 4 hours $2,192
Ground Control at an illustrative $15 per building $3,000 4 hours $3,192
Ground Control at $20 per building $4,000 4 hours $4,192

The $15 midpoint is a budgeting assumption. Ground Control shows the order’s exact price before payment, with the per-building price falling as quantity increases.

At that midpoint, buying the file costs $520 more and releases 51 hours and 40 minutes of staff capacity that you can assign to contact research or scheduled visits. At the low end, it also saves $480.

The hourly break-even calculation is list price divided by hours released: $3,000 / (51 + 40/60) hours = about $58.06 per hour. Above that value for the person’s time, the midpoint purchase also wins on labor economics.

I would build manually while the campaign is changing or the owner needs to learn a small territory, then buy once the filters are settled and the next 200 rows repeat work the team already understands. Compare the scope and contact charges in commercial property data costs.

What can 200 well-chosen buildings produce?

Four signed accounts from 200 buildings produce $156,240 in five-year gross profit in the Raleigh planning model, against $6,648 in list and acquisition costs.

Extend the example with explicit account assumptions: each building represents a separate buying account; annual HVAC maintenance and approved repair revenue averages $18,600 per signed account; gross margin is 42% after direct service costs, including travel; expected retained life is five years.

Annual account gross profit is $18,600 x 42% = $7,812. Undiscounted customer lifetime value is $7,812 x five years = $39,060. Use your own service history to set the retained life before approving a campaign budget.

Allow 72 staff hours for acquisition: 24 for contact research, 24 for outreach, 16 for local visits including travel, and eight for proposals. At $48 per hour, that is $3,456. Add the $3,000 property list and $192 handoff allowance: $6,648 total acquisition cost.

The broad-file column assumes an existing file with no new purchase charge. Its 72 hours split differently: 32 for contact research, 28 for outreach, eight for visits and four for proposals. Each column also receives four hours for setup and handoff. Contact research is done internally using existing tools, with no purchased contact add-ons or separate campaign charges.

For the screened list, 20 initial site visits share 16 hours: 48 minutes each including travel. Sixteen standard maintenance proposals share eight hours: 30 minutes each. That requires a compact route and a reusable proposal format. A replacement estimate requiring equipment schedules needs its own time budget.

Here is how the two lists use the same 72 sales hours:

Funnel stage Broad existing file Screened building list
Buildings approached 200 200
Buying-role conversations 20 50
Site visits 8 20
Proposals 4 16
Signed accounts 1 4

The broad file reaches a buying role at 10% of buildings; the screened list reaches one at 25%. Both send 40% of those conversations to visits. Visits produce proposals at 50% and 80%, respectively, because the screened buildings already meet the service criteria. Both close 25% of proposals. Building-to-account conversion is 0.5% for the broad file and 2% for the screened file.

Customer acquisition cost is spending divided by signed accounts. The broad file costs $3,648 / one account = $3,648, while the screened campaign costs $6,648 / four accounts = $1,662 per account, including the purchased data.

Outcome for the screened list Low Base High
Signed accounts from 200 buildings 2 4 6
Five-year account gross profit $78,120 $156,240 $234,360
Acquisition cost per account $3,324 $1,662 $1,108
Net lead-list ROI, rounded to whole percentages 1,075% 2,250% 3,425%

Lead-list ROI is account gross profit minus acquisition spending, divided by acquisition spending. The base calculation is ($156,240 - $6,648) / $6,648 = $149,592 / $6,648, or approximately 22.50 times the cost: 2,250% rounded. This is five-year account gross profit before company overhead, with acquisition spending deducted.

The sensitivity table holds the $6,648 budget and account value fixed while changing signed accounts. Use two wins to test the downside and six to test upside within the same proposal workload. Revenue and margin stay level over the five-year account life; the model assumes no additional expansion revenue.

Run the same inputs through the lead-list ROI calculator. My decision rule is to approve the campaign only when the two-account case covers the acquisition budget at your own margin and retained life.

A commercial prospect list template you can copy

Use one property row for each building and connect the contact records through a shared account ID before assigning the next sales action.

Copy this header into a CSV file or the first row of a spreadsheet. Keep the field names unchanged while the team tests the first batch.

building_id,county,parcel_id,site_address,original_site_address,city,state,zip,latitude,longitude,building_type,building_area_sq_ft,building_area_basis,required_feature,fit_reason,property_source,imagery_source,imagery_date,reviewed_on,account_id,owner_entity,operator_entity,manager_entity,buyer_role,contact_name,contact_source,email,phone,contact_checked_on,status,assigned_rep,next_action,next_action_date,suppressed

Here is how the warehouse row in the Raleigh example should read before contact research is finished. The identifiers are worksheet labels; replace the unfinished fields with verified records before releasing the row.

Template field Example entry Entry rule
building_id RAL-E-001 Keep this ID through later imports
parcel_id and site_address Pending county-record match Copy from the verified property record
city and state Raleigh, NC Store city and state separately
building_type Warehouse Use the campaign’s agreed vocabulary
building_area_sq_ft 38600 Store a number, with the source in its own field
required_feature 5+ visible rooftop units State the acceptance test
fit_reason Warehouse; size fits; five visible rooftop units Record the observations supporting acceptance
property_source and imagery_date Pending evidence entry Preserve the reference and the available capture date
owner_entity and buyer_role Research assigned Keep legal ownership separate from buying responsibility
contact_name, email and phone Blank Add sourced contact information when found
status Researching Do not release an unfinished property match
next_action Match parcel and save imagery reference Give the researcher a specific task

Add validation lists for status and building type. A short status sequence is enough: researching, accepted, assigned, contacted, meeting, proposal, won, lost and rejected. Keep suppression in its own field because it controls contact eligibility rather than the property’s sales stage.

Store notes about the conversation separately from the fit reason. A receptionist’s routing advice should not overwrite the evidence that qualified the building.

For multiple contacts or a portfolio, use linked tabs with the account ID and building ID, keeping one property row per building and adding people to the contact table so a second person cannot double the building count.

Put the file to work in the first 30 days

Assign the first 25 accepted buildings in week one, record what happens at each stage and use those corrections to control the next batch.

Days one through seven belong to testing the acceptance rule with the first batch under one file owner who approves field changes before another version reaches sales.

Days eight through fourteen are for buyer research and first contacts. Record wrong numbers separately from properties that fail the fit rule. Ask the rep to leave the source evidence attached when correcting a row.

For commercial email, follow the FTC’s CAN-SPAM requirements: accurate sender information and subject lines, clear identification as advertising, a valid postal address and an easy opt-out method. The rules cover business-to-business email. Honor opt-out requests within 10 business days, keep the opt-out mechanism working for at least 30 days after sending, and carry the suppression status into later imports. FTC commercial-email guidance

Use days fifteen through twenty-one for reviewing conversations and scheduling visits along a compact route. Log the service scope and the person who can approve it. Use the outbound sales cadence for contractors to assign follow-up dates across channels, and the commercial canvassing plan when a visit fits the campaign.

During days twenty-two through thirty, compare accepted buildings with conversations and proposals. Look for the first stage that stalled. If qualified conversations are scarce, check routing and contact work. If visits expose unsuitable buildings, revisit the acceptance rule.

For public contracts issued by cities, counties or school districts, use Bid Control by PorchRocket alongside the private-property campaign. It brings bid papers and addenda together with public opportunities. Keep those opportunities in their own pipeline so the team follows the buyer’s published process and deadlines.

At the month-end review, compare the time per accepted building with the value of the salesperson’s next assignment, then order or research the next batch at a pace the team can work.

Build a commercial route in Ground Control

Ground Control delivers matching commercial properties within 48 hours after payment, giving your team a defined building list to assign and work through its sales process.

Bring the filters you settled during the test batch. Set the territory around the work your crew can reach, then choose the buildings that justify a conversation.

  • Select warehouse, industrial or other business types and the building-size band that fits the campaign.
  • Choose the visible feature tied to your service, such as five-plus rooftop units, paved parking areas or loading docks.
  • Review the exact price before payment: $10 to $20 per commercial building, with orders starting at 10 buildings.
  • Receive each property’s reason for matching in a CSV or Excel file, ready to map into your working sheet or sales system.
  • Add owner information or decision-maker research, including role and contact details where found. Ground Control never charges for a contact it does not find.
  • Review the delivery against your acceptance rule and request a credit for a wrong match within 30 days.

For several markets or a requirement outside the standard filters, submit a custom request through Ground Control using the same field definitions, so the expanded file fits the process your rep already follows.

Give the sales team its next 200 buildings with a reason to approach every one.

Questions people ask

Quick answers

How do I build a prospect list from scratch?

Define your territory and building criteria before collecting names. Match each candidate address to a parcel, check the service-fit evidence, and assign a building identifier. Then research the owner or manager responsible for your service. Remove duplicate buildings, preserve separate buying accounts and test a small batch before expanding the list.

Where can I get a list of businesses in my area for free?

Start with public business listings, county property searches and local aerial maps. Business listings help identify occupants; property records help establish the site and recorded owner. You still need to screen each building for the work you sell. County Business Patterns provides employer-establishment counts for market sizing rather than a researched file of individual building prospects.

How long does it take to build a 200-building prospect list?

This guide budgets 55 hours and 40 minutes: 14 minutes for each of 200 accepted property rows, five hours screening rejected candidates and four hours setting up the territory and sheet. Named-contact research is separate. Time your first 25 accepted rows and the rejects you encounter to replace those assumptions with your own pace.

How much does a commercial prospect list cost in 2026?

Ground Control charges $10 to $20 per commercial building, so 200 buildings cost $2,000 to $4,000 before add-ons. Orders start at 10 buildings, and the exact price appears before payment. Owner information and decision-maker research cost extra. Compare that spend with the staff time required to research the same property fields yourself.

Should my prospect list contain businesses or buildings?

Use buildings as the starting point when your service depends on a roof, rooftop equipment, parking area or loading dock. Connect each building to its buying account and contacts. Preserve separate site records when one manager oversees several buildings, while coordinating outreach through the account record so that manager receives one organized approach.

What columns should a prospect list template include?

Include a building identifier, parcel identifier, site address, business type, building size and reason the property fits. Add evidence dates, source references and a review status. Keep owner, manager and contact-role fields separate. Finish with the assigned salesperson, next action, follow-up date and contact suppression status.

Does a registered agent count as the property decision maker?

No. The registered-agent role alone does not establish authority to buy building services. North Carolina describes the agent's duty as forwarding notices, process and demands to the entity. Use the entity record to continue ownership research, then confirm who manages your service and who approves the spending.

What is the fastest way to build a commercial prospect list?

Use Ground Control to select buildings by your area, business type, size and visible features such as rooftop HVAC, paved parking or loading docks. Commercial properties cost $10 to $20 each and arrive within 48 hours after payment. Each property includes its match reason. Request a credit for a wrong match within 30 days; contact research is available separately.

Research file

Sources used in this guide

Sources are linked at the claim they support and collected here for auditability. Vendor features and prices can change; verify them before purchasing.

  1. Wake County Real Estate Property SearchWake County Tax Administration: Public search by owner, real estate ID, location address and parcel identification number; checked November 2026.
  2. Accessing Wake County property dataWake County Tax Administration: County guidance on viewing account, building, land and deed information; checked November 2026.
  3. Real Estate Property Research ResourcesCity of Raleigh: Official links distinguish assessor records, recorded deeds, zoning and iMAPS aerial views; checked November 2026.
  4. Business RegistrationNorth Carolina Secretary of State: Public entity research and the distinction between individual searches and authorized bulk access; checked November 2026.
  5. Registered Office and Registered Agent InformationNorth Carolina Secretary of State: A registered agent forwards notices, process and demands; the role does not establish purchasing authority; checked November 2026.
  6. County Business Patterns glossaryU.S. Census Bureau: Definitions of establishments and enterprises, employer-establishment counts and nonemployer exclusions; checked November 2026.
  7. Google Maps places and listsGoogle: Official description of local place discovery and saved location lists, used in the free-source comparison; checked November 2026.
  8. CAN-SPAM Act compliance guide for businessFederal Trade Commission: Business-to-business commercial email rules, sender identification, postal address, ad disclosure and opt-out handling; checked November 2026.
Your next best move

Put the right buildings on your sales route.

Choose your area, building types and visible service-fit features. Ground Control sends matching properties with a reason for each match, ready for your team to work.

Build my list